APPENDIX A
MANUFACTURING PROCESS CHECKLISTS
Adhesion Institute, Delft
GRP composite pipework
Anonymous
Flexible packaging lamination
British Steel Technical
Laminated floor panel
Carello Lighting
Headlamp assembly
Commercial Hydraulics Keelavite
Power unit structural framework
Hunting Engineering
Law 80 launch tube
IBM UK
Disk drive actuator
Oxford Brookes University
Construction joint sealing
Permabond
Needle electrode
Pilkington
Automotive glazing
Westland Aerospace
Aircraft wing vane
Blank Checklist
I
I
I
Gelukkig - Lijm Company Windmill View, Leiden, Netherlands Site Line Process development on-site installation production Product intermediate
Process plan / checklist Centre for Adhesive Technology, TWI DATE: 25/1/94 FILE: pipe1.wbl
~~
final Authors Blank file is PROCESS.WB1 Borland Quattro Pro
Approved for release Comments
Structural bonding of composite (GRP) pipework K Guyt, Adhesion Institute, Delft yes
II
manufacturer
Ciba Polymers
Wavistrong adhesive type 3 (XB5029/XB5030)
grade incoming specification
IS0 9002
supplier QA status acceptance test(s) sampling basis
2 part epoxy
primary polymer type formulation (critical factors)
fillers stability rheology
note if present 3 year at room temperature if not mixed
storage (critical factors)
temperature ,atmosphere packaging
0 < T <35 "C
transport shelf life
rate of use
I
I
250 gram kit, contains part A and 6, sanding paper and spatula expiry date given on each kit varies, depending on pipe diameter
I
i
pipel, page 2
filament-wound glass I epoxy pipe socket end Wavin Repox BV
description of part manufacturer
I
grade
Wavistrong
incoming specification supplier QA status
IS0 9001
acceptance test@)
key attributes (critical factors)
physical form glass / epoxy pipe chemical composition fully cured epoxy resin ,mechanical properties pressure class
I
I
pretreatment(3)
I
I
monitoring methods
abraded surfaces should look clean and dull not excessive (or resin-rich inner layer removed)
process materials monitoring methods
dry the wet surface heating blanket surface temperature must be > ambient
description of part
filament-wound glass / epoxy pipe spigot end Wavin Repox BV
manufacturer
. I
grade
Wavistrong
I
upplier QA status
llS0 9001
lacceptance test(s)
1
I
sampling basis key attributes (critical factors)
I
physical form glass / epoxy pipe chemical composition fully cured epoxy resin mechanical properties pressure class
I
surface condition (critical factors)
II
I
spigot of correct cone angle (e.g. 20" ) defined by calibration machine
as received known contamination existing coating
I
tI
oil, grease or moisture
I
pretreatment(1)
process materials monitoring methods
pretreatment(2)
process materials monitoring methods
pretreatment(3)
I
I
dimensions tolerance
required surface condition prior to bonding
r
I
'
incoming specification
I
I1
clean, dry and free from abrasion debris sanded or calibrated within 1 hour of bonding solvent wipe acetone, MEK or MlBK and clean cloth operator sanding of spigot face or calibration flapper sander or calibrating machine then wiped with clean, dry cloth abraded surfaces should look clean and dull not excessive (or resin-rich inner layer removed) I
rocess materials monitoring methods
.
]dry the wet surface heating blanket surface temperature must be > ambient
I
pipel, page 4 ldescription of process
lbonding of socket /spigot joint
1
I
to be carried out by company-certified staff only
specification adhesive application (values, methods and tolerances)
temperature metering mixing dispensing monitoring method
mix and apply at 20 3 min until mix has uniform colour use within setting time ( 4 0 min at 20 "C)
joint (critical factors)
geometry bond gap
socket and spigot coaxial joint defined by cone angles in joint faces
spread 0.5-0.8mm adhesive on inner socket face spread 0.8-1 .Omm adhesive on outer spigot face insert spigot, rotate 1/4 turn (if no filler in adhesive) tap home with wooden block on pipe end remove excess adhesive apply heating blanket
order of assembly / layup
assembly environment
temperature cIeanliness
prior to cure (critical factors)
jigging /clamping aggressive chemicals
.. .
site temperature, 15 < T < 40 "C
self-locating none
cure (values, methods and tolerances)
I
type
continuous batch sinale rate of production Y
x Irepair or plant installation 10-20 / day lpipeline installation >I 00 /day
I
I
i
Process plan I checklls Centre for Adhesive Technology, TWI IDATE: 13/7/92 FILE: fpll .wbl
I
Blank file is PROCESS.WB1 Borland Qualtro Pro
I
I Company Anonymous Site Line Process ldevelopment lproduction lexample Productlintermediate
I
final Authors Approved for release Comments
1
I
Morton International
grade
specific grade number, or use internal reference
incoming specification
Data sheets with recommended coat weightlcurelsafety
supplier QA status
send QA results with each batch
Gmplifi basis
1
Flexible packaging lamination, printed PET to LDPE A W Espie approved for general release
manufacturer
acceptance test(s)
1
lvisual - colour, gels, separation etc.
I
leach batch I
I I
fpll , page 2
I
description of part
polyester film
manufacturer / grade
ICI / Melinex 800
incoming specification
data sheet
supplier QA status
supply test data
'surtace condition (critical factors)
as received known contamination existing coating
-
visual no damage primer, coating surface treatment note which side is print barrier
-
Surface tension Print correct colourddesign for customer initial sample. Note surface to be bonded, i.e. print may be external or sandwiched.
notes
-
description of part
LDPE
manufacturer I grade
Shell
incoming specification
data sheet
supplier QA status
supply test data
acceptance test(s)
Igauge, substance, visual I lllbatch or 1 in 10 reels I
~
. I
lit-mne thit-4)
....,,,vrv,,,..-r,
copolymer or blend
..J e , burst I-
I
shape .. . critical factors)
idimensions Itolerance
bdt h,_. length, gauge to specification I+/- 10%
surface condition (critical factors)
as received known contamination existing coating
visual gels, reel qualiy coextrusion or monolayer?
I
1
-
required surface condition prior to bonding
pretreated
pretreatment@)
corona discharge at extension stage in line with lamination
-
-
I ~~
monitoring methods
No back treatment, therefore identify surface to be bonded. surface tension, reel qualiy uneven ribs, gels
I
I
I
inspection tests
visual physical hinT
performance tests
yes bond strength - room temp. and accelerated cure 3
destructive sampling basis pass criteria
at setup, then 1 reel I shifl visual and bond strength
sampling basis pass criteria
afler cure bond strength, ageing, chemical I product resistance
Centre for Adhesive Technology, TWI
I
I Blank file is
PROCESS.WB1 w n d auattro P ~ O
manufacturer 1 grade incoming specification supplier QA status acceptance test@) sampling basis
I
I
I
I
,T
B Jones, British Steel Technical, Welsh Laboratories approved forgeneraIrelease
Authors Approved for release Comments
Swift A d h d
~
M,page 2
(Hot dip zinc coated steel
description of &t
I
manufacturer Igrade
British Steel
I
incoming specification *
supplier QA status
Registeredto BS 5750 part 2
acceptancetest@)
None except absence of oil on surface.
sampling basis
None physical form chemical composition mechanicalproperties
flat sheets and trap
shape $critical factors)
dimensions tolerance
From 1 metre square to 1 metre x 3 metres Flatness is critical
surface condition (critical factors)
as received known contamination existing coating
untreated Supplied non-oiled I handling kept to a minimum Chromate passivationon surface
key attributes (critblfactom)
To BSl449
required surface ccf~dtionprior to bonding
as received
PretreaWs)
none none
primr(s)
two-pack etch primer
monitoring methods
visual examination
I
I
I
II (chipboard panel
1
description of part
I
manufacturer Igrade
NIA
incoming specification
must satisfy density specification
supplier QA status
unknown
surfacecondi
M,paQe 3
I
I
Specification
joint
-
rectongular
0.5mm 1.Omm
pitical factors)
(values, methods and
perfomam test8
abmosphere monitoring method
none
rate of production
variable
sampling basis pass criteria
deflectiontest deflection of laminate must not exceed agreed value
I
1
I
Process plan I checklist Centre for Adhesive
Technology, TWI
3ATE: 9/9/92 -ILE: carell .wbl
Company Site tine Process development production Product intermediate final I
Blank file is PROCESS.WB1 Boriand Quattro Pro
Authors Approved for release Comments
Carello Lighting PLC Cannock, UK Headlamp Assembly Yes Lens/Body Assembly Automotive Headlamp David Boucher I Alan Espie approved for general release
I
carell, page 2
I
L
description of part
headlamp body
manufacturer
ICI Materials
1) T20C556 2) T40H550 3) GC30H251 1) 20% Talc 2) 40% Talc 3) 30% Glass Coupled
grades
Filled Polypropylene Filler
'Procom'
shape Jcriticalfactors)
dimensions tolerance
Body Channel (recommendationsin design guide)
surface condition
carell, page 3 I
I
lheadlamp lens I
manufacturer
I
IHolophane and Vetreric Riunite
grade
soda lime glass
incoming specification
Lucas. 197-51 and 197-5-2
supplier QA status
Developing to limited or preferred status as part of Carello Supplier Liaison Programme.
required surface condition prior to bonding
Surface Energy > 56 mNlm
pretreatment(s)
None None
primer(s)
None None
monitoring methods
surface tension ink
I
I
carell, page 4 I
description of process I
specification
I
]automatic robot or pantographic dispensing I Assembly operation specified as part of ManufacturingProcess plan.
joint lcritical factors)
Lens to Body (recommendations in design guide)
order of assembly I layup
Sealant dispensed into Body Channel, lens placed manually or robotically within 15 seconds
assembly temperature
Not known accurately
L
prior to cure jcritical factors)
I
Clamp immediately after lens placement
alues, methods and
I
I
1
1
Process plan I checklis Centre for Adhesive Technology, TWI DATE: 22/7/92 FILE: chkll .wbl Blank file is PROCESS.WB1 Borland Quattro Pro , 5.0 for Windows
Company Site Line Process development production Product intermediate final Authors Approved for release Comments
Commercial Hydraulics Keelavite Ltd (CHKL) Warwick NIA YeS
structural framework for defense vehicle hydraulic power pack S Dowling approved for general release
i
I
manufacturer
Ciba Polymers
grade
Redux 403
incoming specification
Certificate of Conformance (Cof C)
supplier QA status acceptance test(s)
None, but (C of C)
sampling basis
None
sampling basis key attributes (critical factors)
NIA physical form chemical composition mechanical properties
primer(s)
aluminium alloy
INone
I
monitoring methods
I
Operator
sampling basis key attributes (critical factors)
physical form chemical composition mechanical properties
shape icriical factors)
dimensions tolerance
surface condition (critical factors)
as received known contamination existing coating
required surface condition prior to bonding
aluminium alloy
Abraded, clean I
pretreatment@)
I L
rocess lmaterials
(Abrade, clean
I
primer(s)
None
lrnonitoring methods
loperator
I I I
(values, methods and
joint !critical factors)
As drawing controlled by Pop Rivets I
I
rder of assembly I layup ssembly temperature
(Room temperature I with Pop Rivets
prior to cure icritical factors)
inspection tests
visual physical NDT destructive sampling basis pass criteria
performancetests sampling basis pass criteria
YeS
Proof Load of Assembly None lap shear test of coupon samples defined in WPS 021 N/A
I
Process plan I checklist
I
Centre for Adhesive Technology, TWI
DATE: 9/9/92 FILE: hunt2.wbl Blank file is PROCESS.WB1 Borland Quattro Pro 5.0 for Windows
.
Company Sie tine Processldevelopment production Product intermediate final Authors Approved for release Comments
Hunting Engineering Ltd Ampthill Law 80 yes Housing ring on Kevlar I epoxy tuba Law 80 anti-tank weapon
K D Stapleton, P R Simpson Approved for general release Adhesive data also supplied by N Pickett, Permabond
I
required surface condition prior to bonding
I
pretreatment(s)
abraid none
primer(s)
none none
monitoring methods
Reflectivrty test. Operator inspection.
I
I
lprocess soecification
knecification
adhesive application (values, methods and tolerances)
temperature metering mixing dispensing monitoring method
15 - 28 "C Automatic metering static mixing head robotic operator control lsquareness [max 0.6 mm
I
N/A
order of assembly / layup
115 - 28 "C I Tooled fixtures
assembly temperature L
prior to cure jcritical factors) cure (values, methods and tolerances)
time temperature pressure atmosphere monitoring method
20 min handling; 3 hr test; 24 hr full. 15-28°C atmospheric Workshop ambient Operator or process control
type
[continuous batch single rate of production
YfS
visual physical NDT destructive sampling basis pass criteria
glue beads around joint gauging
inspection tests
I
performance tests sampling basis pass criteria
180 units Iday
shear load test 1 pershift 18 KN minimum Weapon proof test firing 2000 Batch size Double 15 & 15 sampling No failure
I
Process plan I checklist
I
Centre for Adhesive
Technologys TwI DATE: 2811194 FILE: ibml .wbl
IBM UK Ltd Havant
Company Site Line
I
Redwina
Processldevelopment production Product intermediate final
Blank file is PROCESS.WB1 Borland Quattro Pro 5.0 for Windows
Authors Approved for release Comments
manufacturer
incoming specification
PC hard disk drive actuator
M. Hall yes
I
to manufacturersspecification I
supplier QA status lacceptance test(s)
Company approved supplier I
lnone I
sampling basis lprimary polymer type
I
none
I
modified methacrylate ester
formulation (critical factors)
(critical factors)
yes core I rail assembly
Loctite
lgrade
I
I
I
fillers stability rheoIogy
t
temperature atmosphere packaging transport shelf life rate of use
J
not known I not tested not known I not tested not known I not tested
I
I +5 to +28 O C
in manufacturers original containers not known 1 year
~
description of part
sintered core (PM 95x2101)
manufacturer
Ames, Spain
grade
05-194I CMH 6-2580-002 I 41-027 as per drawing for PM 95x2101
incoming specification
I
supplier QA status
lapproved
acceptance test(s)
to dimension and surface finish requirements on drawing PIN 95x2101 to quality plan
sampling basis key attributes (critical factors)
sintered iron I resin impregnation physical form chemical Composition nickel plated mechanical properties
I
I
surface condition (critical factors)
I
I
protective light oil film nickel plating as per std 41-027
I
I
required surface condition prior to bonding
clean and dry
pretreatment(s)
process materials monitoring methods
solvent clean prior to adhesive application 1 , l ,ltrichloroethane
primer(s)
process materials
none applied
I
I
I
I
as received known contamination existing coating
J
I
ibml ,page 3 II
buide shaft (PN 95x2248)
description of part manufacturer
Kyocera, Japan
grade
sintered zirconia to IBM eng spec 95x1937
ncoming specification
as per drawing for P N 95x2248
supplier QA status
approved
acceptance test(s)
dimensions and surface roughness
sampling basis key attributes (critical factors)
sintered ceramic physical form chemical composition zirconia mechanical properties
1
I 1
shape (critical factors) surface condition (critical factors)
I
as received known contamination existing coating
lrequired surface condition prior to bonding pretreatment(s)
process materials monitoring methods
I
I N3 surface roughness none none
clean and dry solvent cleaning prior to adhesive application 1,l ,ltrichloroethane
I
primer(s)
none applied monitoring methods
1
I
ibml , page 4
II
I
description of process
lbonding guide shaft to core
specification
Ames manufacturingprocess procedure
-
adhesive application (values, methods and tolerances)
temperature metering mixing dispensing monitoringmethod
room temperature NIA NIA semi-automatic operator
joint (critical factors)
geometry bond gap
defined in assembly drawing PlN 95x1737 controlled by adherend geometries and assembly fixhrring tolerances ensure finite gap, not interference fit
order of assembly I layup
I
adherends solvent cleaned adhesive applied to both parts slide parts together fixture for partial cure solvent clean excess adhesive oven cure (no fixture)
1
assembly environment
temperature cleanliness
room temperature class 10,000 i.e. less demanding than final assembly ,which is class 100
prior to cure (critical factors)
jigging I clamping aggressive chemicals
jigging geometry, spring force 100 +/- 10 N ,itrichloroethane solvent clean after partial 1,l room temp. cure to remove excess adhesive
cure (values, methods and tolerances)
method time temperature pressure atmosphere monitoringmethod
[11tack (in fixture) 15 min room 100 +I 10 -N air
type
continuous batch single rate of production
PI oven
1 ~
60 min 100 O c NIA air
yes 5000 I week
inspection tests
visual physical NDT destructive sampling basis pass criteria
shaft guides free from adhesive (95x1737 note 7) to meet drawing dimensions (PM 95x1737) proof load test 2000N (95x1737 note 6) test to failure by statisticaltest plan assembly to meet NDT proof load audit test to failure vs. development test values
performancetests
,samplingbasis pass criteria
NIA NIA I I
I
1
I
Company Site
Process plan I checklist
I
Centre for Adhesive Technology, TWI
DATE: 21/1/94 FILE: seal1.wbl
Acme Building Co. New Street, Birmingham Joint sealing of new buildinq
Process
Sealant Techniques Ltd, ASA member
Sealant Applicator Applicator status Author
Blank file is PROCESS.WB1 Borland Quattro Pro 5.0 for Windows
A Hutchinson, Oxford Brookes University yes
Approved for release Comments
manufacturer
Adshead Ratcliffe
grade
Arbokol2000, black
incoming specification
BS 3712 , IS0 11600
supplier QA status
BS 5750
acceptance test@)
trials (tensile and peel adhesion, staining ) at start (important part of acceptance) batch of sealant to one job
1
primary polymer type formulation (critical factors)
fillers stability rheology MAF service life
storage (critical factors)
temperature atmosphere packaging transport shelf life rate of use
2-part polysulphide, based on Thiokol LP Polysulphide Liquid Polymer 60% undisclosed mineral fillers 9 months unmixed part A, base lO"6 mPas part B, catalyst 10A4mPas 30% movement accomodation factor 25 years not exceeding 25 "C dry
12 litre can containing part A and B conventional 9 months unmixed 5 litres oer man dav
I
%
1
seal1, page2 precast concrete wall panels
description of part
key attributes (critical factors)
physical form flat, porous chemical composition Portland cementlqravel aggregate mechanical properties rigid, brittle 112'1OA6 P C coeff. of expansion I
primer(s)
process materials monitoring methods
apply masking tape, brush on primer Arb0 Primer 925 ready when dry and seal within 6 hours
u-PVC window frame
description of part I
manufacturer
Anglian
grade incoming specification
Anglian product spec.
supplier QA status
BS 5750
acceptance test(s)
factory audit
sampling basis
at start of contract
key attributes (critical factors)
physical form chemical composition mechanical properties coeff. of expansion
flat profile edge u-PVC semi-rigid 5O'1OAL-6 P C
shape (critical factors)
dimensions tolerance
2' 1 metres joint gap >> tolerance
surface condition (critical factors)
as received polyethylene masking film known contamination existing coating I
required surface condition prior to bonding
primer(s)
process materials monitoring methods
dry and free from loose dirt
none
I
blerances)
Process plan I checklist
I I
Centre for Adhesive Technology, TWI
Company
Anonymous
-._-
I
I
Line I Processldevelopment I production yes Product intermediate
(DATE: 27/1/94
~
final Authors Blank file is PROCESS.WB1 Borland Quattro Pro 5.0 for Windows
Needle electrode N Pickett Pennabond yes Permabond customer
Approved for release Comments
manufacturer
Permabond
grade
A1 18 anaerobic sealant
incoming specification
Material to have viscosity 300-350 mPa.s
supplier QA status
IS0 9001
acceptance test(s)
Verification of type and quantity
sampling basis
None
primary polymer type
Acrylic (methacrylate based)
formulation (critical factors)
fillers stability rheology
t
I
1
I
I
storage (critical factors)
I
NIA room temp. stable in presence of st. steel/Pt As stated above I
I
5 - 10 "C avoid excessively high humidity Not critical Not critical 1 year at 5-25 "C 40 litres p.a.
temperature atmosphere packaging transport shelf life rate of use I
I
1
I
description of part
hypodermic syringe needle
manufacturer
Unknown purchased via subcontractor
grade
Austenitic stainless steel 304515 of BS 970 : 1983 Certificate of conformance
-
incoming specification
BS 5750 Part 2
supplier QA status
I
acceptance test@)
key attributes (critical factors)
I
Dimensional checks
physical form Length and extema.11 diameter ___...___. chemical composition None mechanical properties INone I
shape (critical factors)
dimensions tolerance
surface condition
!as received IBright known contamination Greaseldirt existing coating NIA
I I
1
I
Straight & circular No dimensions or tolerance I
1
description of part
Platinum wire
manufacturer
Johnson Matthey
grade
Platinum 390 hard Dralon
incoming specification
To user specs C80280 80281 80282
supplier QA status
BS 5750 : Part 2
I
I
surface condition (critical factors)
t
I
II [Less than 25 pin hole/l OOmm
as received known contamination I lexisting coating (Polyether-imidecoated I I
I
required surface condition prior to bonding
I
pretreatment(s)
process materials monitorina methods
None
primer(s)
process materials monitoring methods
None
I I
I
Sealing/bonding of pt electrode inside stainless steel hypodermic needles Approval to USA medical applications
description of process specification adhesive application (values, methods and tolerances)
temperature metering mixing dispensing monitoring method
I
t
joint (critical factors)
geometry bond gap
20-25 "C Dip tray technique 0.5" depth, 1Om/s Single-part, NIA N/A
-
.I Concentriclcoaxial Small enough to allow capillary action to completely fill gap
I
order of assembly / layup
I
I
assembly environment
temperature cleanliness
I
I
t
20-25 "C
prior to cure (critical factors)
I Needles jigged vertically jigging / clamping aggressive chemicals N/A
I
I
lcure
and
I
type
I inspection tests
1
I
I
I
ttime temperature pressure pressure atmosphere monitoring method
t
continuous batch rate of production
20 min
~~
-
(100 100 105 "C lhlormal Normal Dry
\
I
I
I
J
yes 110% /year
1
IvisuaI
lcursory check based on BS6001
NDT destructive sampling basis pass criteria
electrical continuity for shorts & opens sectioning & microscopy to detect voids electrical loo%, destructive 1 per week electrical no shorts or opens
-
1
-
T
performance tests
sampling basis pass criteria
USA medical approval
I
i
Process plan I checklist Centre for Adhesive Technology, TWI
DATE: 5/11/92 FILE: p i l k l h b l Blank file is PROCESS.WB1 Borland Quattro Pro 5 0 for Windows
rimary polymer type
Jmoisture-curingpolyurethane I
I
formulation (criticalfactors) storage (criticalfactors)
I ternperature atmosphere packaging transport shelf life
10 - 25 "C
Tube Conventional 6 months unopened
I I
pilkl , page 2 I
key attributes (criticalfactors)
surface condition (criticalfactors)
physical form chemical composition mechanical properties
as received known contamination existing coating
required surface condition prior to bonding
primer@)
Pressed toughened glass Silica
Clean None None Clean. No contamination from toughening process
I
1
wiped on via felt applicator Sika 205 (Active Wipe) I
monitoring methods
Jvisualinspection
I
I
i
(values, methods and
Process plan I checklist
Centre for Adhesive Technology, TWI
DATE: 13i7192 FILE: west2.wbl Blank file is
PROCESS.WBl
Borland Quattro Pro 5 0 for Windows
rimary polymer type
1 ]modified epoxy
west2, page 2 1
key attributes (critical factors)
physical form aerofoil skin (5 m x Im) chemical composition carbon I epoxy mechanical properties care in handling I routing
shape _(criticalfactors)
dimensions tolerance
rocess monitorina methods
effectively controlled by curing mould & rout jug
I
1
I
I
I
Ivisuai insnedinn
I
I
key attributes (critical factors)
monitoring methods
i
hysical form machined component hemical composition
!thickness control visually primed surface - limited life
I
I
assembly temperature
lambient (some use of heat gun for increased tack)
prior to cure $critical factors)
can be fk problems
I
cure (values, methods and tolerances)
time temperature pressure atmosphere monitoring method
type
lcontinuous batch single rate of production
2 hours 125 'C 27 PSI non-inert part-temperatures 8 Vacuum Bag integrity, continuously. ~~
~
YeS
10 per week
I
'recess plan I checklist
Company
Centre for Adhesive Process development
Technology, TWI
production Product intermediate
IATE:
:ILE: final Blank file is
Authors Approved for release
PROCESS.WB1
Comments
Borland Quattro Pro
I manufacturer grade ~
~
~
incoming specification supplier QA status
I I
cceptance test(s)
formulation (critical factors)
stability rheology
I
I
storage (critical factors) transport shelf life
I I I
I I
I
I I
I
~~~~
process, page 2
I
I I
description of part
~
manufacturer grade incoming specification
acceptance test(s) sampling basis
key atbibutes
physical form
(critical factors)
chemical composition ,mechanicalproperties
shape
dimensions
(critical factors)
tolerance
I
t
I
surface condition
as received
(critical factors)
known contamination existing coatinq
I
I
I
I
I
II
I
I
required surface condition prior to bonding pretreatment(1) onitoring methods pretreatment(2)
process materials monitoring methods
process, page 3
I
J
description of part manufacturer grade incoming specdidon supplier QA status acceptance test&) sampling basis key attributes
physicalform
(critical factors)
chemical composition mechanical properties
shape
dimensions
(critical factors)
tolerance
I
I
I
I
1
I surface condition
as received
(critical factors)
known contamination existing coating
I
I
I
I
required surface condition prior to bonding pretreatment(1)
rocess materials monitoring methods
pretreatment(2)
process materials ,monitoring methods I
I
I
1
idhegive application
temperature
:values, methods and
metering
:olerances)
miming dispensing monitoring method
I
I
joint
geometry
(critical factors)
bond gap
I
I
II
order of assembly / layup
1
I
I
I I
I assembty environment
temperature cleanliness
type
continuous
I
I1
'
batch single rate of production I
I
I
I
I
I
process, page 5
I