Multi-objective optimization design and operation strategy analysis of BCHP system based on life cycle assessment

Multi-objective optimization design and operation strategy analysis of BCHP system based on life cycle assessment

Energy 37 (2012) 405e416 Contents lists available at SciVerse ScienceDirect Energy journal homepage: www.elsevier.com/locate/energy Multi-objective...

1MB Sizes 0 Downloads 48 Views

Energy 37 (2012) 405e416

Contents lists available at SciVerse ScienceDirect

Energy journal homepage: www.elsevier.com/locate/energy

Multi-objective optimization design and operation strategy analysis of BCHP system based on life cycle assessment You-Yin Jing, He Bai*, Jiang-Jiang Wang School of Energy and Power Engineering, North China Electric Power University, Baoding, Hebei Province 071003, China

a r t i c l e i n f o

a b s t r a c t

Article history: Received 26 June 2011 Received in revised form 7 November 2011 Accepted 9 November 2011 Available online 3 December 2011

The promising energetic and environmental benefits of building cooling heating and power (BCHP) system are greatly dependent upon its design and operation strategy. In this paper, the energy and emission flows and different operation strategies of a BCHP system driven by gas engine are analyzed. Life cycle assessment (LCA) is employed to assess and compare the whole life energy saving potentials and pollutant emission reductions of BCHP system with the traditional energy system. Furthermore, energy consumption and three pollutant-related impacts, global warming, acid precipitation and respiratory effects, are selected as objective functions to optimize the gas engine capacity of BCHP system in different operation strategies. A numerical case of BCHP system for a commercial office building in Beijing, China is applied to obtain the optimum BCHP alternative in terms of the comprehensive energy and environment performance. The uncertainty of different evaluation criteria weights is also analyzed to show their influences on the optimal design and operation strategy. The results show that a reasonably sized BCHP system with an electric load-following strategy has the best performance under a wide interval of criteria weights, when the energetic and environmental benefits of producing excess electricity for nearby users are not considered. Ó 2011 Elsevier Ltd. All rights reserved.

Keywords: Building cooling heating and power (BCHP) system Optimization of capacity and operation mode Life cycle assessment (LCA) Energetic and environment benefits Weights of evaluation criteria

1. Introduction Recently, energy saving and sustainable development have been the subjects of wide-ranging discussion due to environment related problems caused by energy consumption [1,2]. The building sector accounts for a large amount of energy consumption in industrialized countries [3,4]. The increase of building energy consumption has lead to a number of energy-related problems and degraded the environment and public health [5,6]. In China, some regulations have been established to improve energy utilization efficiency and mitigate environmental impact, such as Energy Conservation Law [7], Renewable Energy Law, National Building Codes for Residential and Commercial Buildings, and Energy Efficiency Appliance Standards [8]. One of mitigation methods is to utilize energy efficiently and recover the waste heat in buildings. Because of its energy-efficient technology and friendly environment benefits, combined cooling heating and power (CCHP) system is broadly identified as a friendly alternative for the world to meet and solve energy-related problems and environmental issues [9e16]. When CCHP system is used for a building, it is called building cooling heating and power * Corresponding author. Tel.: þ86 312 7522443; fax: þ86 312 7522440. E-mail addresses: [email protected], [email protected] (H. Bai). 0360-5442/$ e see front matter Ó 2011 Elsevier Ltd. All rights reserved. doi:10.1016/j.energy.2011.11.014

(BCHP) system. BCHP systems have been applied into various kinds of buildings such as hotel, office and hospital [17]. Nowadays, BCHP system is not yet the dominant energy supply mode in China. However, it will be a promising sustainable technique in China’s energy field [18]. The promising performance of BCHP system is closely dependent upon its design and operation mode. In order to achieve the maximum energetic and environment benefits, many efforts have been made to optimize the capacity scheme and operation strategy of BCHP systems. Wang et al. applied genetic algorithm to optimize the equipment size of BCHP system to obtain its optimal energy saving potential and ozone depletion potential impacts [19]. Mago et al. modeled a BCHP system for a large office building under different operation strategies and examined its primary energy consumption (PEC) with respect to a reference building using conventional technology [20]. Ruan et al. evaluated BCHP systems with different driving equipments and heat-to-power ratios for various commercial buildings regarding their energetic and environment benefits [21]. Carvalho et al. optimized the configuration of a BCHP system to minimize carbon dioxide emissions based on life cycle assessment (LCA) [22]. The purpose of this paper is to optimize the equipment capacity of BCHP system in different operation strategies to maximize its life

406

Y.-Y. Jing et al. / Energy 37 (2012) 405e416

Nomenclature

X

m CCHP BCHP SP PEC LCA PGU FEL FTL GWP AP REP PESR GWP-RR AP-RR REP-RR

M f N

combined cooling heating and power building cooling heating and power separation production prime energy consumption life cycle assessment power generation unit following the electricity load following the thermal load global warming potential acidification potential respiratory effects potential prime energy consumption saving ratio global warming potential reduction ratio acidification potential reduction ratio respiratory effects potential reduction ratio

u U

Subscripts c cool h heat ec electric chiller eq electrical equipment f fossil energy gen electricity generation tra grid transmission g natural gas gb gas boiler he heating exchanger ge gas engine hr heating recover ac absorption chiller A alternative

Symbols E electricity Q heat F fuel consumption h efficiency

cycle energy saving potential and pollutant emission reduction in comparison to separation production (SP) system. Section 2 presents the energy and emission flows of the SP system and BCHP system, and analyzes the classical operation strategies of BCHP system. Section 3 introduces the LCA methodology and lists the life cycle inventory of energy systems. Section 4 describes the details of a commercial building in Beijing, China for case study. Section 5 applies the optimization model to a BCHP system for the baseline building and analyzes the influence of different combinations of evaluation criteria weights on the optimal results. Section 6 summaries some conclusions. 2. System description 2.1. Separation production (SP) system A classical SP system composed by gas boiler and electric chiller is selected as the reference system. The energy and pollutant emission flows of the SP system are shown in Fig. 1. The building energy demands include the electricity demand, E (kW h), the cool demand for space cooling, Qc (kW h), and the heat demand for space heating and domestic hot water, Qh (kW h). In the SP system, natural gas is supplied to the gas boiler to produce heat for the heating exchanger to satisfy the heat demand of the building. Electric chiller is employed to meet the cool demand of the building. The power demand comes from the power plants driven by fossil energy through the utility grid. The electricity consumptions include the building electrical load, E (kW h), SP (kW h), and parasitelectricity demands of the electric chiller, Eec SP (kW h), of ical electrical equipments (such as pumps and fans), Eeq the SP system. Consequently, the electrical energy balance of the SP system can be expressed as follows: SP Egrid ¼ Eþ

Qc SP þ Eeq COPec

emission mass vector emission factor emission mass instantaneous fraction capacity weights objective function

When the electricity from the utility grid is converted to the fossil energy consumption, the energy losses of generation and transmission should be considered. The natural gas consumption can be obtained based on the heat demand of the building. Thus the SP (kW h), can be PEC of the SP system in the operation stage, Fop calculated as: SP Fop ¼ FfSP þ FgSP ¼

SP þ ESP E þ Eec eq

hgen htra

þ

Qh

hhe hgb

(2)

where FfSP (kW h) and FgSP (kW h) are the fossil energy consumption of power plants and the natural gas consumption of the SP system, respectively. hgen and htra are the electricity generation efficiency of the power plant and the transmission efficiency of the utility grid, respectively. hhe and hgb are the heating exchanger efficiency and gas boiler efficiency, respectively. The emission pollutants are calculated by an energy inputrelated emission factor model:

½Xi  ¼ ½Fi $½mi 

(3)

where [Xi] (g) is the emission mass vector of pollutants, [Fi] (kW h) is the input fuel of the ith combustion device, and [mi] (g/kW h) is the emission factor with respect to [Fi]. SP The total pollutants of the SP system in the operation stage, Mop (g), can be obtained as follows:

h i h i h i h i h i h i h i SP SP SP Mop ¼ Xplant þ Xgb ¼ FfSP $ mf þ FgSP $ mg

(4)

SP  and ½X SP  are the emission mass vectors of the power where ½Xplant gb plants and the gas boiler, respectively. [mf] and [mg] are the emission factors of fossil energy and natural gas, respectively.

2.2. BCHP system

(1)

SP (kW h) is the electricity from the utility grid and E SP is where Egrid eq the electricity consumed by the parasitical electrical equipments. COPec is the coefficient of performance (COP) of the electric chiller.

Different BCHP systems have different driving units and the combinations of components are various. In this paper, a BCHP system driven by gas engine is evaluated and compared with the SP system.

Y.-Y. Jing et al. / Energy 37 (2012) 405e416

407

Fig. 1. The energy and emission flow chart of the SP system.

During the analysis and calculation in this study, some important assumptions of energy systems are shown as follows:

and the heating recover efficiency accounts for the heat loss in the gas engine.

(1) The energy equipment can operate anywhere between 0% and 100% of its rated capacity and the efficiencies of the energy equipments, except the gas engine, are constant at any load operation. (2) The system is assumed to be 100% reliable, so the influence of maintenance is not considered. In order to enhance the starting reliability of the system, the electricity consumptions of system parasitical electrical equipments such as pumps and fans are from the utility grid. (3) The waste heat from the system including parasitical equipments is ventilated outside to the environment. (4) The gas engine and the heating recover are seen as a packaged unit, power generation unit (PGU) to simplify the calculation

Fig. 2 displays the energy and emission flows of the BCHP system. Gas engine is employed to generate electricity to satisfy the power demand of the building. The waste heat form the gas engine is recovered by the heating recover and supplied to the absorption chiller and heating exchanger to meet the cool or heat demands of the building. When the recovery heat is not enough to satisfy the thermal demand of the absorption chiller and heating exchanger, the auxiliary gas boiler begins to run to provide the additional heat. When the electricity from the gas engine is not enough, the supplemental electricity is from the utility grid. The application of gas boiler and the connection between the BCHP system and the utility grid can also decrease the accidental risk and enhance the operation reliability of the system.

Fig. 2. The energy and emission flow chart of the BCHP system.

408

Y.-Y. Jing et al. / Energy 37 (2012) 405e416

The electricity balance of the BCHP system can be expressed as follows: BCHP Egrid ¼



 BCHP BCHP W þ Eeq E  Ege

(5)

where

( W ¼

BCHP >0 E  Ege BCHP E  Ege  0

1; 0;

BCHP (kW h) is the electricity produced by the gas engine. The Ege BCHP (kW h), is natural gas consumption of the gas engine, Fge calculated to:

BCHP Fge ¼

BCHP Ege

(6)

hge

where hge is the power generation efficiency of the gas engine, which is corresponding to those of the load factors nonlinearly as [23]: 2 3 hge ¼ a þ bfge þ cfge þ dfge

(7)

where fge is the instantaneous fraction of the gas engine, which can be expressed as follows:

fge ¼

BCHP Ege

(8)

MAX Ege

MAX (kW h) is the maximum power output of the gas where Ege engine, which can be obtained through its capacity (kW) multiplied the unit operating time, 1 h. BCHP (kW h), can The recovery heat from the heating recover, Qhr be estimated as

  BCHP BCHP 1  hge hhr Qhr ¼ Fge

(9)

where hhr is the heating recover efficiency. When the gas engine MAX . operates at full load, the recovery heat reaches its peak, Qhr The thermal energy balance of the BCHP system can be expressed as follows: BCHP BCHP BCHP BCHP Qhr þ Qgb ¼ Qac þ Qhe ¼

Qc Q þ h COPac hhe

(10)

BCHP (kW h) is the heat generated by the gas boiler. Q BCHP where Qgb ac BCHP (kW h) are the heat supplied to the absorption (kW h) and Qhe chiller and the heating exchanger, respectively.COPac is the COP of the absorption chiller. The energy consumption of the BCHP system in the operation BCHP (kW h), is expressed as: stage, Fop

BCHP Fop ¼ FfBCHP þ FgBCHP ¼

BCHP Egrid

hgen htra

þ

BCHP Ege

hge

þ

BCHP Qgb

hgb

V ¼

1; 0;

h i h i h i h i BCHP ¼ X BCHP þ X BCHP þ X BCHP Mop pgu plant gb i h i h i h i h i h i h BCHP $ m BCHP $ m ¼ FfBCHP $ mf þ Fge g þ Fgb g

(12)

BCHP , ½X BCHP  and ½X BCHP  are the emission mass vectors of where½Xplant pgu gb the power plants, the PGU and the gas boiler in the BCHP system, respectively.

2.3. Operation strategy The environment and energetic performances of BCHP systems are closely related to their operation strategies. Following electricity load (FEL) and following thermal load (FTL) are the two most distinctive operation strategies for BCHP systems [24]. In FEL operation strategy, the PGU runs following the electricity demand of the building. In this case, there may be excess heat produced which can be distributed to other users. However, for an independent BCHP system, the surplus heat is assumed to dissipate to the outside directly [25]. Thus, the energy saving potentials and emission reductions achieved by the excess heat are not considered. When the PGU runs following the thermal demand of the building, BCHP system may produce excess electricity. However, the electricity generated by micro-BCHP system is not allowed to be sent back to the utility grid for further use in China. Therefore, the surplus electricity is assumed to be consumed indirectly via nearby users. In this study, the energetic and environment benefits of the excess electricity are neither considered. 2.3.1. FEL operation strategy In FEL operation strategy, the capacities of energy equipments in the BCHP system are determined according to the electricity cumulative curves and the energy demands of building [26]. After the equipments are selected, the maximum outputs of equipments are fixed. The PGU operates according to the electricity load of building. When the power demand of building is more than the maximum output of gas engine, the additional electricity is supplied by the utility grid. The recovery heat from the heating recover is used to produce cool and heat in absorption chiller and heating exchanger, respectively. When the recovery heat is not enough, gas boiler begins to run to the supply the supplementary heat. BCHP system would not produce excess electricity in this operation mode while the surplus heat may be exhausted. The operating conditions and energy consumptions are expressed in Eqs. (13)e(16): If MAX E  Ege

(13)

then

V

(11)

where

(

Based on the emission flows in Fig. 2, the total pollutant BCHP  (g), emissions of the BCHP system in the operation stage, ½Mop can be computed from:

BCHP þ Q BCHP  Q BCHP >0 Qac he hr BCHP þ Q BCHP  Q BCHP  0 Qac he hr

FfBCHP (kW h) and FgBCHP (kW h) are the fossil energy consumption of power plants and the natural gas consumption of the BCHP system, respectively.

BCHP BCHP Fop ¼ FfBCHP þFge þFgb ¼

BCHP Eeq

þ

E

hgen htra hge

þ

BCHP Qgb

hgb

V

(14)

In this case, the electricity demand of the building can be satisfied by the gas engine and the power demand of the system electrical equipments is from the utility grid. The natural gas consumption of the gas engine is determined by the electricity demand of the building. While the natural gas consumption of the gas boiler, if any, is based on the difference between the heat supplied by the heating recover and the thermal demands of absorption chiller and heating exchanger. Otherwise, if

Y.-Y. Jing et al. / Energy 37 (2012) 405e416 MAX E>Ege

(15)

then BCHP BCHP Fop ¼ FfBCHP þ Fge þ Fgb

¼

BCHP  EMAX E þ Eeq ge

hgen htra

þ

MAX Ege

hge

þ

BCHP Qgb

hgb

V

(16)

When the electricity produced by the gas engine can not meet the power demand of the building, the electricity from the utility grid is based on the difference between the maximum output of gas engine and the electricity demands of the building and system parasitical equipments. In this case, the gas engine operates at full load and the natural gas consumption of the PGU is determined by its capacity. Additionally, the natural gas consumed by the gas boiler is based on the difference between the maximum recovery heat of the PGU and the cool or heat demands of the building. 2.3.2. FTL operation strategy Similarly, in FTL operation strategy, the outputs and capacities of energy equipments in the BCHP systems are decided based on the heat or cool cumulative curves and the energy demands of building. Contrarily to FEL mode, the PGU operates according to the cool or heat demands of the building. When the maximum recovery heat from the heating recover is less than the thermal demand of the building, the supplementary heat is supplied by the gas boiler. When the power demand of the building is more than the electricity produced by the gas engine, the additional electricity is from the utility grid. In this operation mode, there is no excess heat wasted while excess electricity may be produced by the PGU. The operating conditions and energy consumptions are expressed in Eqs. (17)e(20) as follows: If BCHP BCHP Qac þ Qhe 

MAX  Ege

hge

 1  hge hhr

(17)

then BCHP Fop ¼ FfBCHP þ Fge   BCHP þ E  EBCHP W BCHP Eeq Q BCHP þ Qhe ge  ¼ þ ac hgen htra 1  hge hhr

of the gas boiler is based on the difference between the maximum recovery heat of the PGU and the thermal demand of the building. In this case, the gas engine operates at full load and the electricity from the utility grid is based on the difference between the maximum power output of gas engine and the electricity consumptions of the building and the parasitical electrical equipments. 3. Life cycle assessment (LCA) methodology In order to evaluate the integrated energetic and environmental performances of energy systems, it is improper to consider only on-site impacts, because off-site impacts are also need to be accounted for, if not internalized [27]. Life Cycle Assessment (LCA), which is also called the assessment from cradle to grave, is suitable for investigating both on-site and off-site energy-related problems and environmental issues occasioned by any type of product or process [28e35]. In this study, LCA is employed to assess the whole life energetic and environment benefits of energy systems. LCA methodology mainly includes four phases: Goal & Scope, Life Cycle Inventory, Life Cycle Impact Assessment, and interpretation and improvements [36]. 3.1. Goal & scope The goal of this paper is to estimate and compare the PEC and pollutant emissions of the BCHP system in FEL and FTL operation strategies with the SP system during a life span of 10 years. The system boundary of the scope of the energy system is displayed in Fig. 3. The rectangles outside the dotted line indicate the energy inputs or pollutant outputs of energy systems. The rounded rectangles inside the dotted line show the contents covered in the LCA, which include the exploitation of raw materials, the manufacture of equipments, the transportation of materials and equipments, the acquisition and transportation of fuels and the operation of system. The “Materials” designation shown in Fig. 3 mainly includes the energy consumptions and pollutant emissions associated with the

(18)

When the thermal demands of absorption chiller and heating exchanger can be satisfied by the recovery heat from the PGU, the gas boiler is out of operation. The natural gas consumption of the gas engine is determined by the thermal demand of the building. The electricity from the utility grid is based on the difference between the electricity produced by the gas engine and the power demands of the building and system parasitical equipments. Otherwise, if MAX   Ege BCHP BCHP 1  hge hhr Qac þ Qhe >

(19)

hge

then BCHP þF BCHP Fop ¼ FfBCHP þFge gb  BCHP MAX W MAX BCHP Q MAX Eeq þ E Ege Ege Q BCHP þQhe hr ¼ þ þ ac

hgen htra

hge

hgb

(20) When the maximum recovery heat from the PGU is less than the cool or heat demands of the building, the natural gas consumption

409

Fig. 3. System boundary of the LCA analysis of energy systems.

410

Y.-Y. Jing et al. / Energy 37 (2012) 405e416

mining and metallurgy of raw materials such as steel, copper et al., while the operation, construction and access roads of the mine are outside of the LCA analysis scope. In the “Manufacture” stage, the life cycle inventory data should be calculated by performing an LCA analysis on each equipment unit of energy systems. However, when there is little information available on the details of manufacture process it might be convenient to use rough estimates in the LCA analysis [37]. Thus, in this study, the energy consumption in this stage will be approximated by only the electricity consumption caused by equipments manufacturing. The energy used to build the manufacturing machines and manufacturing factory is not included in this inventory. The major inputs and outputs of the “Transportation” stage are associated with the combustion of fuels such as diesel oil, gasoline or coal consumed by trucks and trains for road transportation and railway, respectively. The impacts caused by building or maintaining the roads or railroads are not considered in this study. The “Fuel” phase is consisted of extraction, pretreatment and transportation of the fossil energy consumed by power plants and the natural gas consumed by the energy systems. In the “Operation” stage, the energy inputs and pollutant outputs are associated with the consumption of electricity and natural gas. The impacts caused by building the equipments room and system maintaining are not considered. As there is no clearly policy about the disposal of BCHP system, the decommissioning stage is not considered in this study.

3.2. Life cycle inventory The life cycle inventory analysis phase aims to determine the life cycle inventory of energy going into and the pollutant emissions coming out of the entire process of energy systems, which are shown in Eq. (21) and Eq. (22)

i   h ½Mlc  ¼ ½Mrm  þ ½Mma  þ ½Mtr  þ Mop þ Mfu

(21)

Flc ¼ Frm þ Fma þ Ftr þ Fop þ Ffu

(22)

where Mlc, Flc, Mrm, Frm, Mma, Fma, Mtr, Ftr, Mop, Fop, Mfu and Ffu are the pollutant emissions and PEC during the stages of the life cycle, materials, manufacture, transportation, operation and fuel, respectively. The life cycle inventory data are shown in Table 1 [38e45]. As the energy and environment impacts in the “Materials” stage are the functions of weights, g/kg and kW h/kg are selected as the units of pollutant emissions and PEC, respectively. The fuels consumed in the “Transportation” stage are mainly coal and diesel oil for railway and road respectively, and the fuel consumption amounts are based on the transport distance and transport load [46,47]. As the

electricity consumptions in the “Manufacture” and “Operation” phases are both from the utility grid, their inventory data are included in the same line. In China, the utility grid is mainly composed by coal-fired power plants, thus the electricity from the grid is assumed to be totally produced by coal-fired power plants [48]. In order to facilitate the calculation, the units of natural gas consumed by energy systems are selected as m3 and the unit of coal consumed by the power plants is selected as kg1. It should be noticed that the inventory data of electricity consumption in the “Operation” stage are the data when 1 kW h electricity is obtained by the building consumers, which account for the transmission efficiency of utility grid and generation efficiency of power plants. However, the inventory data of natural gas consumption in this stage are the data associated with combustion of 1 m3 natural gas. The energy consumptions and pollutant emissions of the gas engine and gas boiler are related to their natural gas consumption amounts which are dependent upon not only their energy outputs but also their efficiencies. From Table 1, it can be seen that the pollutant emissions mainly include SO2, CO2, NOx, PM2.5, CO, CH4 and N2O, thus the emission mass vector [X] can be expressed as:

½X71 ¼ ½SO2 ; CO2 ; NOx ; PM2:5 ; CO; CH4 ; N2 OT

(23)

Generally, the emission pollutants and energy consumptions of energy systems lead to the following impacts, including air pollution, acid precipitation, ozone depletion, global warming, forest destruction, radiation effect, respiratory effects and energy resource depletion [49]. The impacts on energy consumption can be evaluated from the whole life PEC of energy systems. For environment issues, three most important pollutants-related problems, global warming, acid precipitation and respiratory effects, are considered to evaluate the pollutant impacts of energy systems [50,51]. These three impacts are assessed in global warming potential (GWP), acidification potential (AP) and respiratory effects potential (REP), respectively. The GWP describes the contribution made by an emission gas to the greenhouse effect in relation to carbon dioxide (CO2), which means that quantities of any emission are converted into equivalent quantities of CO2, CO2-equivalent emission [52]. The AP is given in sulfur dioxide (SO2) equivalent emission. It is described as the ability of certain substances to build and release Hþ protons, which is expressed in terms of the Hþ potential of the reference substance SO2 [52]. Similarly, the REP is described as the respiratory effects caused by a unit of the emission gas and small particulate (the diameter is less than 2.5 mm), converted into respiratory effect values produced by the reference PM2.5, PM2.5-equivalent emission [53]. The conversion factors between various pollutant emissions for GWP, AP and REP are shown in Table 2. Through the emission pollutants multiplied the corresponding GWP, AP and REP conversion factors, the total GWP, AP and REP can be obtained to:

Table 1 The life cycle inventory in different stages [38e45].

Materials (kg1)

Transportation (103 kg)1 km1 Operation & manufacture Fuel

Steel Aluminum Copper PVC Railway Road E (kWh1) Gas (m3) Coal (kg1) Gas (m3)

SO2 (g)

CO2 (g)

NOx (g)

PM2.5 (g)

CO (g)

CH4 (g)

N2O (g)

Energy (kWh)

9.7 205.5 17.7 3.37 0.065 9.421 3.14 10.3 0.74 0.42

2000 25,800 1900 247 6.772 209 326.37 670 77.31 232.6

4.000 94.70 11.48 2.800 0.033 3.159 1.134 0.068 1.219 0.247

15 1290 e 2.2 0.004 0.942 0.061 0.012 0.318 0.011

25 14 e 1.1 0.039 8.944 2 0.184 0.187 0.018

53 24 e e 0.046 0.143 0.003 0.005 4.452 0.301

e e e e 0.002 6.409 0.01 0.0004 0.1802 0.0004

1.7 36.1 1.8 21.9 0.063 0.9 3.28 9.76 0.323 1.708

Y.-Y. Jing et al. / Energy 37 (2012) 405e416 Table 2 Conversion factors between various pollutant emissions for GWP, AP and REP [6,50,51]. Pollutant emissions SO2 CO2 NOx PM2.5 CO CH4 N2O

GWP (g CO2-equiv./g)

AP (g SO2-equiv./g)

REP (g PM2.5-equiv./g)

e 1 e e 3 21 310

1 e 0.7 e e e 0.7

1.9 e 0.3 1 e e e

411

building in per hour. According to the hourly curves, the hourly power load is stable relatively, while the hourly heat or cool demands fluctuate more than the electricity demand. Moreover, the electricity load is generally lower than the thermal load in summer and winter, while, in transient seasons, the thermal demands of the building are low. Additionally, the peak value of the cool load in summer is greater than the maximum heat load in winter because of the hot climate of Beijing. 5. Optimization 5.1. Objective function

  CO2  equiv: ¼ ½GWP  Mj 71

(24)

  SO2  equiv: ¼ ½AP  Mj 71

(25)

  PM2:5  equiv: ¼ ½REP  Mj 71

(26)

where CO2equiv. (g), SO2equiv. (g) and PM2.5equiv. (g) are CO2, SO2 and PM2.5 equivalent emissions, respectively. [GWP], [AP] and [REP] are GWP, AP and REP vectors of various pollutants,½Mj 71 are the pollutant emissions in the jth stage. 4. Case study In order to evaluate and compare the integrated energetic and environmental performances of the BCHP system with traditional SP system, a hypothetical nine-floor commercial office building in Beijing, China is selected as the baseline building. The study building has a floor area of 19,986 m2 and the total area of the windows and glazing comprises about 50% of the total wall area. The first and second floors of the building are shopping malls and the ceiling heights are both 6.0 m. The third floor is a gym with the ceiling height 5.1 m and the forth-eighth floors are office rooms with the ceiling height 3.5 m. The ninth floor is a meeting room and the ceiling height is 4.5 m. Summer is from June 1 to August 30 and winter is from November 15 to March 15. The average temperature setting ranges of the building in summer, winter and transient seasons are 24e26  C, 20e26  C and 20e22  C, respectively. The annual hourly cooling, heating and electricity loads of the building can be obtained based on DeST software [54], which are shown in Fig. 4. It should be noticed that the hourly load in Fig. 4 is instantaneous value, which means the energy demand of the

The selection of objective function associated with the optimization problem will determine how good the solution is. In order to evaluate the integrated performance of the BCHP system, the objective function should measure not only the energetic benefit and but also the environmental benefit achieved by the BCHP system in comparison to the SP system. According to the life cycle inventory analysis, the following evaluation criteria are employed to assess their corresponding performances. Primary energy saving ratio (PESR) is defined as the ratio of the saving energy of the BCHP system with respect to the SP system to the energy consumption of the SP system, which can be expressed as follows:

PESR ¼

SP  F BCHP Flc lc

(27)

SP Flc

SP and F BCHP are the life cycle energy consumptions of the where Flc lc SP system and the BCHP system, respectively. When PESR is positive, it means that BCHP system is more energy-efficient than SP system. Contrarily, when PESR is negative, BCHP system can’t save energy in comparison to SP system. Similarly, the reduction ratio of pollutant-related impact is defined to the ratio of the emission reduction of BCHP system compared with SP system to the pollutant emission of the SP system. Thus, based on the CO2-equivalent emissions of the two systems, the GWP reduction ratio (GWP-RR) is written to:

GWP  RR ¼

CO2  equiv:SP  CO2  equiv:BCHP lc lc CO2  equiv:SP lc

when GWP-RR is positive, the global warming impacts caused by BCHP systems are less serious than the SP system. Contrarily, when

4000

Load (kW)

3200

Qh

Qc

7008

7884

E

2400

1600

800

0 0

876

1752

2628

3504

(28)

4380

Numbers of hour

5256

6132

Fig. 4. The annual hourly cooling, heating and power loads of the commercial office building.

8760

412

Y.-Y. Jing et al. / Energy 37 (2012) 405e416

Table 3 Technical parameters, main material composition and manufacture electricity consumption of energy equipments [19,22]. Equipment

Electric chiller Gas boiler Heating exchanger PGU Absorption chiller a

Unit capacity (kW)

Efficiency

490 200 100 110 490

3.44 0.92 0.91 0.33/0.91a 0.69

Material composition (kg) Steel

Al

Cu

PVC

2000 300 190 1080 9000

20 8 e e e

500 e e e e

1000 e e e e

Manufacturing electricity(kWh) 2100 200 125 700 5800

The value 0.33 is the gas engine efficiency when it runs at full load and the value 0.91 is the heating recover efficiency.

where u1 and u2 are the weights of energetic and environment benefits, respectively. u21, u22 and u23 are weights of GWP-RR, AP-RR and REP-RR, respectively. 0  u1, u2, u21, u22, u23  1, u1 þ u2 ¼ 1 and u21 þ u22 þ u23 ¼ 1.

by the exhaust flue gas from the gas engine. For the SP system, the gas boiler is sized on the heat load peak to enhance the operation safety. While, in the BCHP system, once the operation strategy is determined, the size of the auxiliary boiler depends on the difference between the maximum recovery heat of the PGU and the thermal peak load of the building. Therefore, the capacity of gas engine, Nge, is selected as a decision variable to be optimized. Additionally, the weights in Eq. (29) are assigned to the evaluation criteria to indicate their relative importance. Different weights in the integrated objective function directly influence the optimal results. However, the importance of criteria is uncertain, which may be greatly affected by the national policy, government preferences and even the interest of the investors. Thus the weights of the evaluation criteria, u1, u2, u21, u22, u23, are also defined to be decision variables to show the influence of different combinations of weights on the optimum results.

5.2. Decision variables

5.3. Optimization calculation

In BCHP systems, the energy consumption and pollutant emissions are greatly dependent upon the sizes of energy equipments. According to the energy flow and operation strategy analysis, it can be found that gas engine is the key equipment that determines the capacities of other equipments and the operation mode of the system. The optimal capacity of gas engine provides a good compromise between the requirements for a reasonable energy demand from BCHP system and for a high operating efficiency. After the gas engine capacity is selected, the capacity of the heating recover is obtained according to the maximum waste heat carried

In this sector, the weights of the evaluation criteria are based on the following assumptions, u1 ¼ u2 and u21 ¼ u22 ¼ u23. The technical parameters, main material compositions and manufacture electricity consumptions of energy equipments in energy systems are listed in Table 3. In order to facilitate the optimization problem, based on the hourly loads and energy demands of the building in Fig. 4, the type of gas engine selected in this paper is Caterpillar. Additionally, the amounts of material composition and the manufacturing electricity consumption are the functions of equipment capacity. As the case study is for a building in Beijing,

GWP-RR is negative, BCHP system can’t reduce CO2-equivalent emissions in comparison to the SP system. Likewise, according to the SO2-equivalent emissions and PM2.5equivalent emissions of the two energy systems, the AP reduction ratio (AP-RR) and REP reduction ratio (REP-RR) can be defined based on Eq. (28). Consequently, the comprehensive objective function, U, is defined to:

maxU ¼ u1 $PESR þ u2 ðu21 $GWP  RR þ u22 $AP  RR þ u23 $REP  RRÞ

(29)

40%

The evaluation criteria

35% 30% 25% 20% 15% 10% 5% 0% 0

110

220

330

440

550

660

770

880

990

1100

The capacity of PGU (kW) FEL:

AP-RR

GWP-RR

REP-RR

PESR

U

FTL:

AP-RR

GWP-RR

REP-RR

PESR

U

Fig. 5. The optimization curves of different evaluation criteria for BCHP system in FEL and FTL operation strategies.

Y.-Y. Jing et al. / Energy 37 (2012) 405e416

Fig. 6. The energy structure of annual operation PEC of SP system and BCHP system in FEL and FTL operation modes.

the coal or natural gas consumed in the operation phase is from the same coal mine or the same natural gas field nearby. Thus the contents of coal and natural gas are assumed to be constant. According to the operation strategy, hourly power, cool and heat loads of the building and technical parameters of energy equipments, the optimization results can be obtained as follows. The optimization processes of the BCHP system in FEL and FTL operation strategies are shown in Fig. 5. It can be seen that the optimization curves of FTL mode are stable relatively, while the energetic and environment benefits of the FEL mode change dramatically with different gas engine capacities. Moreover, the environment criteria of the two operation modes fluctuate more than the energetic criteria. The optimization curves increase with the increasing capacity of gas engine at small capacity, when the gas engine capacities are greater than the corresponding optimal values for different evaluation criteria, the objective functions begin to decrease with the increasing gas engine size because of the poor efficiency of gas engine at low load ratio. It also can be found that when the BCHP system runs in FEL mode, the GWP-RR, AP-RR and REP-RR can reach their corresponding optimal values, while the optimum PESR is obtained when the system operates in FTL mode. Therefore, the environment benefits of the FEL mode are more powerful, while the energy saving potential of the FTL

413

strategy is better than that of the FEL strategy. The evaluation ranking order of the optimal criteria is GWP-RR > AP-RR > REPRR > PESR. Additionally, the optimal gas engine capacities for different criteria are different. Different emission conversion factors among various pollutant impacts lead to this inconsistent optimum system size. It should be noticed that when the gas engine capacity is too large or too small, the energy saving ratio or the pollutant emission reduction ratio is negative which means the energetic or environment benefits of the BCHP system are worse than those of the SP system. Finally, when concerning the optimal comprehensive benefits of BCHP system, the integrated objective function of the FEL mode, 33.9%, is better than that of the FTL mode, 29.5%. Based on the optimal gas engine capacities of the two operation strategies, the energy consumption structures of the annual operation PEC in SP system and BCHP system in FEL and FTL operation modes are displayed in Fig. 6. It can be known that the natural gas consumption of the SP system is the lowest, BCHP system in FTL mode follows, while the FEL mode consumes the largest amount of natural gas. However, the ranking order of the coal consumption of the three alternatives is just the opposite of that of the natural gas consumption. Moreover, the electricity from the power plants in FEL mode is much less than other two options. Additionally, the operation energy consumptions of BCHP system in the two operation modes are almost the same and the energetic benefits of the BCHP system are better than those of the SP system. 5.4. Life cycle impact assessment Once the optimal gas engine capacities for the tow operation strategies are determined, the Life Cycle Impact Assessment can be obtained. The LCA results of various pollutant emissions and PEC of SP system and BCHP system in FEL and FTL operation strategies are listed in Table 4. In terms of various pollutant-related impacts, the life cycle environment benefits of the BCHP system in FEL mode are the best, FTL mode follows, while SP system is the worst alternative. Moreover, the CO2 emissions are significantly larger than any other pollutant emissions, while the N2O emissions are the lowest among various pollutant emissions. In the energetic benefits, although the energy consumption of BCHP system in the fuel stage is larger than

Table 4 The LCA results of pollutant emissions and PEC for SP system and BCHP system in FEL and FTL operation strategies. Materials SO2 (g)

CO2 (g)

NOx (g)

PM2.5 (g)

CO (g)

CH4 (g)

N2O (g)

PEC (kWh)

SP FEL FTL SP FEL FTL SP FEL FTL SP FEL FTL SP FEL FTL SP FEL FTL SP FEL FTL SP FEL FTL

4.10E 9.24E 9.24E 6.92E 1.88E 1.88E 2.00E 3.83E 3.83E 7.81E 1.60E 1.60E 6.66E 2.29E 2.29E 1.39E 4.85E 4.85E e e e 2.37E 1.62E 1.62E

þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ

05 05 05 07 08 08 05 05 05 05 06 06 05 06 06 06 06 06

þ 05 þ 05 þ 05

Manufacture 7.81E 1.86E 1.86E 8.12E 1.94E 1.94E 2.82E 6.73E 6.73E 1.52E 3.62E 3.62E 4.98E 1.19E 1.19E 7.50E 1.78E 1.78E 2.49E 5.94E 5.94E 8.16E 1.95E 1.95E

þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ

04 05 05 06 07 07 04 04 04 03 03 03 04 05 05 01 02 02 02 02 02 04 05 05

Transport 4.79E 1.14E 1.14E 1.43E 3.42E 3.42E 1.68E 4.02E 4.02E 4.62E 1.10E 1.10E 4.39E 1.05E 1.05E 3.84E 9.16E 9.16E 2.97E 7.08E 7.08E 8.50E 2.03E 2.03E

þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ

04 05 05 06 06 06 04 04 04 03 04 04 04 05 05 03 03 03 04 04 04 03 04 04

Operation 1.90E 1.77E 1.69E 1.89E 1.22E 1.47E 6.23E 1.67E 3.91E 3.53E 2.20E 2.71E 1.11E 3.92E 7.35E 2.62E 7.75E 4.44E 5.39E 6.31E 3.06E 1.96E 1.70E 1.70E

þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ

08 08 08 10 10 10 07 07 07 06 06 06 08 07 07 05 05 05 05 04 05 08 08 08

Fuel 2.34E 8.88E 1.57E 2.83E 3.84E 3.00E 3.76E 7.74E 2.27E 9.70E 1.19E 5.53E 5.74E 8.84E 3.34E 1.36E 1.90E 7.85E 5.49E 5.86E 3.09E 1.33E 2.75E 1.78E

Life cycle þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ

07 06 07 09 09 09 07 06 07 06 06 06 06 05 06 08 07 07 06 05 06 07 07 07

2.14E 1.87E 1.86E 2.18E 1.63E 1.79E 1.00E 2.49E 6.23E 1.40E 5.01E 9.85E 1.18E 4.26E 7.94E 1.38E 2.46E 8.38E 6.05E 7.21E 3.47E 2.10E 1.97E 1.88E

þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ þ

08 08 08 10 10 10 08 07 07 07 06 06 08 07 07 08 07 07 06 05 06 08 08 08

414

Y.-Y. Jing et al. / Energy 37 (2012) 405e416

Fig. 7. The life cycle structure of the CO2-equiv., SO2-equiv., PM2.5-equiv. emissions and PEC for SP system and BCHP system in FEL and FTL modes.

the SP system, the whole life PEC of BCHP system is lower than that of the SP system because of its promising energy saving potentials in the operation phase. The life cycle structures of the CO2-equiv., SO2-equiv., PM2.5equiv. emissions and PEC are shown in Fig. 7. It can be found that the influences of the operation and fuel stages on the LCA results are more significant than other three stages. Compared GWP with AP and REP, the orders of magnitude of SO2-equivalent emission and PM2.5-equivalent emission are one hundredth of the CO2equivalent emission. Compared with FTL mode, because of its lower SO2-equivalent emission and PM2.5-equivalent emission in the fuel stage, the whole life AP and REP impacts of FEL mode are less serious. The friendly energetic benefits of FTL mode in the fuel stage make it be the best alternative among the three options when

concerning the energy performance. Additionally, among the five LCA stages, the contribution of the transportation phase is the minimum, thus the rough estimation in the life cycle inventory phase is feasible. The pollutant emission structures of CO2-equiv., SO2-equiv. and PM2.5-equiv. emissions of the SP system and the BCHP system in FEL and FTL operation strategies are displayed in Fig. 8. It can be seen that CO2 emission is the main factor to contribute the greenhouse effect, CH4 and N2O emissions follow, while the contribution of CO is the least significant. Although the corresponding GWP conversion factors of N2O, CO and CH4 are larger than CO2, they contribute less to the total GWP because of their lower emissions. Moreover, the contribution difference of CO emission among the three alternatives is merely. Additionally, the GWP of the three less important

Fig. 8. The emission structure of CO2-equiv., SO2-equiv. and PM2.5-equiv. emissions of SP system and BCHP system in FEL and FTL modes.

Y.-Y. Jing et al. / Energy 37 (2012) 405e416

415

pollutant emissions of SP system is nearly twice of those of BCHP system in FTL mode and five times more than those of FEL mode. From the AP evaluation criteria, SO2 emission mainly contributes to acidification, but the impacts of NOx emission can not be ignored. It can be found that the contribution of SO2 emission on AP in FEL mode is larger than that of the FTL mode, while the life cycle acidification impacts of FEL mode are less serious than FTL mode due to its lower coal energy consumption. Besides, the influence of N2O emission on AP is hardly any. The SO2 emission is also the main factor to effect human respiratory health because of its numerous emissions and large conversion factor. Additionally, the NOx and PM2.5 emissions of the FEL mode are half of those of the FTL mode. 5.5. Discussion As previously claimed, the weights of the evaluation criteria have significant influence on the decision making process. Consequently, in this sector, the impacts of different evaluation criteria weights are analyzed. According to Fig. 5, five candidates are employed to study the influence of different combinations of evaluation criteria weights on the optimal result and their details are displayed in Fig. 9. Then, the impacts of the weights of PESR, GWP-RR, AP-RR and REP-RR on the integrated performance can be analyzed based on Fig. 9. As u1 þ u2 ¼ 1 and u21 þ u22 þ u23 ¼ 1, in order to reduce the variables, the environment weight u2 is replaced by 1u1 and the REP-RR weight u23 is replaced by 1(u21 þ u22). Thus the weights of PESR, u1, GWP-RR, u21 and AP-RR, u22, are selected as the decision variables. The boundary and constrain conditions of the decision variables are 0  u1, u21, u22  1 and u21 þ u22  1, respectively. The objective function can be simplified as follows:

U ¼ u1 $PESRþð1 u1 Þðu21 $GWPRRþ u22 $APRRþð1 u21  u22 Þ$REPRRÞ (30) Based on Eq. (30), the integrated benefit of each alternative can be evaluated by its corresponding objective function value. The impacts of different combinations of criteria weights on the optimal alternative are displayed in Fig. 10. In the figure, surface 1 is based on the objective function difference between FTL-770(FTL operation strategy with the gas capacity 770 kW) and FEL-660, UFTL770UFEL660. The interval above surface 1 represents UFTL770UFEL660>0, while the interval below surface 1 shows

PESR 12%

FEL-990 FEL-880 FEL-770 FEL-660 FTL-770

AP-RR 30%

0%

GWP-RR 40%

REP-RR 20% Fig. 9. The energetic and environmental performance of the five candidate alternatives.

Fig. 10. The influence of different combinations of weights on the comprehensive evaluation result.

UFTL770UFEL660<0. Similarly, surface 2 is based on UFEL660UFEL770, surface 3 is based on UFEL770UFEL880, surface 4 is based on UFEL880UFEL990 and surface 5 is the constrain condition. The optimal region of u1, u21 and u22 for each alternative can be found from Fig. 10. The ranking order of the interval volumes is FEL-770 > FTL-770 > FEL-660 > FEL-880 > FEL-990. 6. Conclusion Based on the energy and emission flows and LCA methodology, BCHP system in different operation strategies is evaluated and compared with the SP system from energy consumption and pollutant emission related impacts. The gas engine capacity and evaluation criteria weights are selected as decision variables to maximize the energetic and environment benefits achieved by BCHP system in comparison to SP system. Through a numerical example of BCHP system for a commercial office building in Beijing, China, the optimal equipment size and operation mode can be obtained in consideration of evaluation criteria weights. The optimization calculation and life cycle analysis lead to the following conclusions: The comprehensive energetic and environment performance of BCHP system increases firstly, then the increasing slope becomes slow gradually and reaches the peak, and finally decreases with the increasing of gas engine capacity. The integrated optimization result of FEL mode is better than that of FTL mode because of its friendly environmental benefits. Based on the optimum gas engine capacity, the CO2-equvialent, SO2-equvialent and PM2.5-equvialent emissions of FEL mode are lower than those of the FTL mode, while the energy consumption of FTL mode is lower than that of the FEL mode. Compared with the SP system, the reduction ratios of SO2equvialent emission and PM2.5-equvialent emission in BCHP system are lower than the CO2-equvialent emission reduction ratio. The life cycle impact assessment of BCHP system operating for ten years shows that contributions of the operation and fuel phases are more important for the evaluation results than the materials, manufacture and transportation stages. From the viewpoint of pollutant emission-related impacts, the environment benefits of FEL mode are better than those of FTL mode because of its lower coal energy consumption. However, when concerning energetic benefits, the energy saving potential of FTL mode is better than that of the FEL mode due to its reasonable energy consumption structure.

416

Y.-Y. Jing et al. / Energy 37 (2012) 405e416

When the weights of evaluation criteria are uncertain and various, the optimal gas engine size and operation strategy of BCHP system are different. If energy benefits are paid more attentions, FTL mode is the first choice, while if environment performance is more valuable, FEL mode is the good operation strategy. The integrated performance of BCHP system in FEL operation strategy with gas engine capacity 770 kW is the best alternative among the five candidate BCHP system models and can be stable for a wide interval of different combinations of criteria weights. Acknowledgment This research has been supported by the Fundamental Research Funds for the Central Universities (10MG12) and the Key Laboratory of Condition Monitoring and Control for Power Plant Equipment of Ministry of Education, China. References [1] Badami M, Portoraro A. Performance analysis of an innovative small-scale trigeneration plant with liquid desiccant cooling system. Energy and Buildings 2009;41(11):1195e204. [2] Hofman K, Li X. Canada’s energy perspectives and policies for sustainable development. Applied Energy 2009;86(4):407e15. [3] Chwieduk D. Towards sustainable-energy buildings. Applied Energy 2003; 76(1e3):211e7. [4] Cai WG, Wu Y, Zhong T, Ren H. China building energy consumption: situation, challenges and corresponding measures. Energy Policy 2009;37(6):2054e9. [5] Wang Y. The analysis of the impacts of energy consumption on environment and public health in China. Energy 2010;35(11):4473e9. [6] Wang JJ, Zhai ZQ, Zhang CF, Jing YY. Environmental impact analysis of BCHP system in different climate zones in China. Energy 2010;35(10):4208e16. [7] He J, Deng J, Su M. CO2 emission from China’s energy sector and strategy for its control. Energy 2010;35(11):4494e8. [8] Leggett JA, Logan J, Mackey A. China’s greenhouse gas emissions and mitigation policies. Congressional research service (CRS) reports and issue briefs (Report). Available from: http://www.fas.org/sgp/crs/row/RL34659.pdf; 2008 [accessed 20.11.2009]. [9] Wu DW, Wang RZ. Combined cooling, heating and power: a review. Progress in Energy Combustion Science 2006;32:459e95. [10] Chicco G, Mancarella P. Distributed multi-generation: a comprehensive view. Renewable and Sustainable Energy Reviews 2009;13(3):535e51. [11] Joel HS, Augusto SC. Trigeneration: an alternative for energy savings. Applied Energy 2003;76(1e3):219e27. [12] Wang JJ, Jing YY, Zhang CF, Zhang XT, Shi GH. Integrated evaluation of distributed triple-generation systems using improved grey incidence approach. Energy 2008;33(9):1427e37. [13] Wang JJ, Jing YY, Zhang CF, Shi GH, Zhang XT. A fuzzy multi-criteria decisionmaking model for trigeneration system. Energy Policy 2008;36(10):3823e32. [14] Medrano M, Brouwer J, McDonell V, Mauzey J, Samuelsen S. Integration of distributed generation systems into generic types of commercial buildings in California. Energy and Buildings 2008;40(4):537e48. [15] Hao X, Zhang G, Chen Y. Role of BCHP in energy and environmental sustainable development and its prospects in China. Renewable and Sustainable Energy Reviews 2007;11(8):1827e42. [16] Huang FY, Wu JY, Wang RZ, Xia ZZ. Experimental investigation of adsorption chiller for micro-scale BCHP system application. Energy and Buildings 2007;39(2):120e7. [17] Wang JJ, Jing YY, Zhang CF, Zhang B. Distributed combined cooling heating and power system and its development situation in China. In: Proceeding of the ASME 2nd international conference on energy sustainability, Jacksonville, Florida, USA; 2008. p. 1e8. [18] Xu JZ, Sui J, Li BY, Yang ML. Research, development and the prospect of combined cooling, heating, and power systems. Energy 2010;35(11):4361e7. [19] Wang JJ, Zhai ZQ, Jing YY, Zhang CF. Optimization design of BCHP system to maximize to save energy and reduce environmental impact. Energy 2010; 35(8):3388e98. [20] Mago PJ, Hueffed AK. Evaluation of a turbine driven CCHP system for large office buildings under different operating strategies. Energy and Buildings 2010;42(10):1628e36. [21] Ruan YJ, Liu QR, Zhou WG, Firestone R, Gao WJ, Watanabe T. Optimal option of distributed generation technologies for various commercial buildings. Applied Energy 2009;86(9):1641e53. [22] Carvalho M, Serra LM, Lozano MA. Optimal synthesis of trigeneration systems subject to environmental constraints. Energy 2011;36(6):3779e90. [23] Fumo N, Mago PJ, Chamra MA. Emission operational strategy for combined cooling, heating, and power systems. Applied Energy 2009;86(11):2344e50.

[24] Mago PJ, Chamra LM. Analysis and optimization of CCHP systems based on energy, economical, and environmental considerations. Energy and Buildings 2009;41(10):1099e106. [25] Wang JJ, Zhang CF, Jing YY. Multi-criteria analysis of combined cooling, heating and power systems in different climate zones in China. Applied Energy 2010;87(4):1247e59. [26] Smith A, Luck R, Mago PJ. Analysis of a combined cooling, heating, and power system model under different operating strategies with input and model data uncertainty. Energy and Buildings 2010;42(11):2231e40. [27] Etienne B, Francois M, Rejean S. Multi-objective design optimization of a natural gas-combined cycle with carbon dioxide capture in a life cycle perspective. Energy 2010;35(2):1121e8. [28] Martínez E, Jiménez E, Blanco J, Sanz F. LCA sensitivity analysis of a multimegawatt wind turbine. Applied Energy 2010;87(11):2293e303. [29] ISO. Environmental management-life cycle assessment-principles and framework. Final draft, March, ISO/FDIS 14040. Geneva, Switzerland: International Organization for Standardization; 2006. [30] ISO. Environmental management-life cycle assessment-requirements and guidelines. Commitee draft, October, ISO/CD 14044. Geneva, Switzerland: International Organization for Standardization; 2006. [31] UdodeHaes HA, Heijungs R. Life-cycle assessment for energy analysis and management. Applied Energy 2007;84(7e8):817e27. [32] Babusiaux D, Pierru A. Modelling and allocation of CO2 emissions in a multiproduct industry: the case of oil refining. Applied Energy 2007;84(7e8): 828e41. [33] Lenzen M, Wachsmann U. Wind turbines in Brazil and Germany: an example of geographical variability in life-cycle assessment. Applied Energy 2004; 77(2):119e30. [34] Góralczyk M. Life-cycle assessment in the renewable energy sector. Applied Energy 2003;75(3e4):205e11. [35] Kuckshinrichs W, Zapp P, Poganietz WR. CO2 emissions of global metalindustries: the case of copper. Applied Energy 2007;84(7e8):842e52. [36] Veronica BM, Amy EL, Laura AS. A benchmark for life cycle air emissions and life cycle impact assessment of hydrokinetic energy extraction using life cycle assessment. Renewable Energy 2011;36(3):1040e6. [37] Berhane HG, Gonzalo GG, Laureano J, Dieter B. A systematic tool for the minimization of the life cycle impact of solar assisted. Energy 2010;35(9): 3849e62. [38] National environmental protection agency of China. Production and emission of industrial pollutants manual. Beijing: China Environmental Science Press; 1996 [in Chinese]. [39] Pre B.V. Consultants. The eco-indicator 99: a damage oriented method for life cycle impact assessment; 2000. [40] Ou XM, Zhang XL, Chang SY. Scenario analysis on alternative fuel/vehicle for China’s future road transport: life-cycle energy demand and GHG emissions. Energy Policy 2010;38(8):3943e56. [41] Ou XM, Zhang XL, Chang SY. Alternative fuel buses currently in use in China: life-cycle fossil energy use, GHG emissions and policy recommendations. Energy Policy 2010;38(1):406e18. [42] Ou XM, Zhang XL, Chang SY, Guo QF. Energy consumption and GHG emissions of six biofuel pathways by LCA in (the) People’s Republic of China. Applied Energy 2009;86(S1):5197e208. [43] Gasol MC, Gabarrell X, Anton A, Rigola M. LCA of poplar bioenergy system compared with Brassica carinata energy crop and natural gas in regional scenario. Biomass and Bioenergy 2009;33(1):119e29. [44] Varun Bhat IK, Prakash R. LCA of renewable energy for electricity generation systems-a review. Renewable and Sustainable Energy Reviews 2009;13(5): 1067e73. [45] Sebastián F, Royo J, Gómez M. Cofiring versus biomass-fired power plants: GHG (Greenhouse gases) emissions savings comparison by means of LCA (Life cycle assessment) methodology. Energy 2011;36(4):2029e37. [46] Federici M, Ulgiati S, Basosi R. Air versus terrestrial transport modalities: an energy and environmental comparison. Energy 2009;34(10):1493e503. [47] China statistical yearbook. State statistics bureau. Beijing: China Statistical Press; 2004 [in Chinese]. [48] Zhao ZY, Zuo J, Fan LL, Zillante G. Impacts of renewable energy regulations on the structure of power generation in China-a critical analysis. Renewable Energy 2011;36(1):24e30. [49] Dincer I. Environmental impacts of energy. Energy Policy 1999;27(14): 845e54. [50] Miao YQ. Effects of air pollution on health in Linfen city: method of health production function, China population. Resources Environment 2008;18(5): 205e9 [in Chinese]. [51] Wu GP, Hu W, Teng EJ, Wei FS. Analysis of the effect of air pollution on the adult’s respiratory health. Environment Monitoring in China 2001;17(7):33e8 [in Chinese]. [52] GBC, green building challenge. Stokholm: the Swedish council for building research; 2000; 2000. [53] Staffell I, Ingram A. Life cycle assessment of an alkaline fuel cell CHP system. Hydrogen Energy 2010;35(6):2491e505. [54] University Ddgi T. Building environmental system simulation and analysisDeST. Beijing: China Architecture & Building Press; 2006 [in Chinese].