Automation in Construction 17 (2008) 984–987
Contents lists available at ScienceDirect
Automation in Construction j o u r n a l h o m e p a g e : w w w. e l s ev i e r. c o m / l o c a t e / a u t c o n
Author Index Volume 17 Akinci, B., see Boukamp, F. 90 Akinci, B., see Gordon, C. 705 Ako, S., see Shaban, E.M. 645 Al-Kaisy, A., see Nassar, K. 799 An, S.-H., see Shin, Y. 831 Andersen, M., see Cutler, B. 809 Anumba, C.J., see Behzadan, A.H. 737 Anumba, C.J., see Udeaja, C.E. 839 Anumba, C.J., see Ren, Z. 930 ˜ ez, C. 517 Arias, P., see Ordo´n Armada, M., see Gonzalez de Santos, P. 459 Arslan, G., S. Kivrak, M.T. Birgonul and I. Dikmen, Improving sub-contractor selection process in construction projects: Web-based sub-contractor evaluation system (WEBSES) 480 Augenbroe, G., see Ren, Z. 930 Austin, S.A., see Baldwin, A.N. 333 Aziz, Z., see Behzadan, A.H. 737 Baldwin, A., see Li, H. 915 Baldwin, A.N., L.Y. Shen, C.S. Poon, S.A. Austin and I. Wong, Modelling design information to evaluate pre-fabricated and pre-cast design solutions for reducing construction waste in high rise residential buildings 333 Barak, R., see Sacks, R. 439 Behzadan, A.H., Z. Aziz, C.J. Anumba and V.R. Kamat, Ubiquitous location tracking for context-specific information delivery on construction sites 737 Bernold, L.E., see Kim, K.-T. 322 Birgonul, M.T., see Dikmen, I. 30 Birgonul, M.T., see Arslan, G. 480 Blumenstein, M., see Lee, J. 758 Bosche, F. and C.T. Haas, Automated retrieval of 3D CAD model objects in construction range images 499 Bosscher, P., R.L. Williams II, L.S. Bryson and D. Castro-Lacouture, Cable-suspended robotic contour crafting system 45 Bosscher, P., R.L. Williams II, L.S. Bryson and D. Castro-Lacouture, Erratum to ‘Cable-suspended robotic contour crafting system’ [Automation in Construction 17 (2007) 45–55] 513 Bouchlaghem, N.(Dino), see Udeaja, C.E. 839 Boukamp, F. and B. Akinci, Automated processing of construction specifications to support inspection and quality control 90 Bryson, L.S., see Bosscher, P. 45 Bryson, L.S., see Bosscher, P. 513 Buswell, R.A., A. Thorpe, R.C. Soar and A.G.F. Gibb, Design, data and process issues for mega-scale rapid manufacturing machines used for construction 923 Caldas, C.H., see Gong, J. 526 Carrillo, P.M., see Udeaja, C.E. 839 Castro-Lacouture, D., see Bosscher, P. 45 Castro-Lacouture, D., see Bosscher, P. 513 Cekus, D., see Posiadala, B. 245 Chan, N., see Li, H. 915
doi:10.1016/S0926-5805(08)00092-7
Chang, T.-P., see Lin, Y.-H. 792 Chao, W.C., see Liang, L.Y. 657 Chen, J.-H., KNN based knowledge-sharing model for severe change order disputes in construction 773 Chen, J.-H. and S.C. Hsu, Hybrid ANN-CBR model for disputed change orders in construction projects 56 Chen, K.-Y., see Pan, N.-H. 592 Cheng, C.L., K.C. He and C.J. Yen, Decision-making and assessment tool for design and construction of high-rise building drainage systems 897 Cheng, M.-Y. and M.-H. Tsai, Cross-organization process integration in design– build team 151 Cheng, Y.-M. and S.-S. Leu, Constraint-based clustering model for determining contract packages of bridge maintenance inspection 682 Cheung, Y.K., see Thomas Ng, S. 22 Chiu, T.-C., see Pan, N.-H. 592 Cho, H.-H., see Shin, Y. 831 Cho, Y.K., see Kim, Y.S. 163 Choi, J.W., see Lertlakkhanakul, J. 948 Chou, J.-S. and J.T. O’Connor, Internet-based preliminary highway construction cost estimating database 65 Chu, B., D. Kim, D. Hong, J. Park, J.T. Chung, J.-H. Chung and T.-H. Kim, GA-based fuzzy controller design for tunnel ventilation systems 130 Chung, J.-H., see Woo, S. 122 Chung, J.-H., see Chu, B. 130 Chung, J.T., see Chu, B. 130 Coping, A., see Lo, S.M. 852 ˇ usˇ-Babicˇ, N., see Rebolj, D. 719 C Cutler, B., Y. Sheng, S. Martin, D. Glaser and M. Andersen, Interactive selection of optimal fenestration materials for schematic architectural daylighting design 809 Czmochowski, J., see Rusin´ski, E. 271 Dai, F., see Lu, M. 670 de Vries, B. and R.J. Steins, Assessing working conditions using Fuzzy Logic 584 Deligiannis, V. and S. Manesis, Concrete batching and mixing plants: A new modeling and control approach based on global automata 368 Derlukiewicz, D., see Smolnicki, T. 218 Derlukiewicz, D. and G. Przybyl/lek, Chosen aspects of FEM strength analysis of telescopic jib mounted on mobile platform 278 ˜ o, J. 413 Diego, I., see Toran Dikmen, I., see Arslan, G. 480 Dikmen, I., M.T. Birgonul and A.K. Gur, A case-based decision support tool for bid mark-up estimation of international construction projects 30 Dunston, P.S., see Wang, X. 399 Dunston, P.S., see Shin, D.H. 882 East, E.W., J.G. Kirby and L.Y. Liu, Verification and validation of a project collaboration tool 201 Egemen, M. and A. Mohamed, SCBMD: A knowledge-based system software for strategically correct bid/no bid and mark-up size decisions 864 El-Hamalawi, A., see Moses, S. 824 Estremera, J., see Gonzalez de Santos, P. 459
Author Index Volume 17
985
Fischer, M., see Koo, B. 75 Fischer, M., see Jongeling, R. 780
Kim, T.-H., see Woo, S. 122 Kim, T.-H., see Chu, B. 130 Kim, Y.S., S.W. Oh, Y.K. Cho and J.W. Seo, A PDA and wireless web-integrated
Garcia, E., see Gonzalez de Santos, P. 459 Garrett Jr., J.H., see Gordon, C. 705 ˜ o, J. 413 Gent, M., see Toran Georgy, M.E., Evolutionary resource scheduler for linear projects 573 Gibb, A.G.F., see Buswell, R.A. 923 Glaser, D., see Cutler, B. 809 Gong, J. and C.H. Caldas, Data processing for real-time construction site spatial modeling 526 Gonzalez de Santos, P., J. Estremera, E. Garcia and M. Armada, Power assist devices for installing plaster panels in construction 459 Gordon, C., B. Akinci and J.H. Garrett Jr., Automated planning support for on-site construction inspection 705 Grobler, F., see Kim, H. 550 Gronowicz, A., M. Prucnal-Wiesztort and M. Uberna, Type synthesis of a
system for quality inspection and defect management of apartment housing projects 163 Kirby, J.G., see East, E.W. 201 Kivrak, S., see Arslan, G. 480 Kong, C.W., see Li, H. 915 Koo, B., M. Fischer and J. Kunz, A formal identification and re-sequencing process
mobile underbridge platform 257 Guo, H.L., see Li, H. 915 Gur, A.K., see Dikmen, I. 30 Haas, C.T., see Bosche, F. 499 Hamel, T., see Metni, N. 3 Han, S.H., D.Y. Kim, H. Kim and W.-S. Jang, A web-based integrated system for international project risk management 342 ˜ ones-Rozo, C.A. 608 Hashash, Y.M.A., see Quin Hassan, T.M., see Moses, S. 824 Hassan, T.M., see Ren, Z. 930 He, K.C., see Cheng, C.L. 897 Healy, W.M., see Jang, W.-S. 729 ˜ ez, C. 517 Herra´ez, J., see Ordo´n Hewage, K.N., J.Y. Ruwanpura and G.F. Jergeas, IT usage in Alberta’s building construction projects: Current status and challenges 940 Hong, D., see Woo, S. 122 Hong, D., see Chu, B. 130 Hsu, S.C., see Chen, J.-H. 56 Huang, T., see Li, H. 915 Jang, W.-S., see Han, S.H. 342 Jang, W.-S., W.M. Healy and M.J. Skibniewski, Wireless sensor networks as part of a web-based building environmental monitoring system 729 Jergeas, G.F., see Hewage, K.N. 940 Jongeling, R., J. Kim, M. Fischer, C. Mourgues and T. Olofsson, Quantitative analysis of workflow, temporary structure usage, and productivity using 4D models 780 Kamara, J.M., see Udeaja, C.E. 839 Kamat, V.R., see Behzadan, A.H. 737 Kamat, V.R. and J.C. Martinez, Generic representation of 3D motion paths in dynamic animations of simulated construction processes 188 Kang, K.-I., see Shin, Y. 831 Kano, N., see Kim, H. 137 Karlin´ski, J., E. Rusin´ski and T. Lewandowski, New generation automated drilling machine for tunnelling and underground mining work 224 Karlin´ski, J., E. Rusin´ski and T. Smolnicki, Protective structures for construction and mining machine operators 232 Kawashima, K., see Sasaki, T. 907 Kim, D., see Chu, B. 130 Kim, D.Y., see Han, S.H. 342 Kim, G.-H., see Shin, Y. 831 Kim, H., see Han, S.H. 342 Kim, H. and N. Kano, Comparison of construction photograph and VR image in construction progress 137 Kim, H., L. Soibelman and F. Grobler, Factor selection for delay analysis using Knowledge Discovery in Databases 550 Kim, J., see Jongeling, R. 780 Kim, K.-T. and L.E. Bernold, A comparison of two innovative technologies for safe pipe installation — bPipemanQ and the Stewart–Gough platform-based pipe manipulator 322 Kim, M.Y., see Lertlakkhanakul, J. 948
for developing sequencing alternatives in CPM schedules 75 Kumaraswamy, M.M., see Palaneeswaran, E. 425 Kunz, J., see Koo, B. 75 Kuruku, E., see Shi, J.J. 633 Lai, J., see Wong, J. 284 Lai, J., see Wong, J. 303 Lai, Y.-T., W.-C. Wang and H.-H. Wang, AHP- and simulation-based budget determination procedure for public building construction projects 623 Lam, H.-C., see Lu, M. 670 Laudan´ski, M., see Wrobel, J. 265 Lee, B.L.P., see Leung, S.-w. 749 Lee, D.-E., see Shi, J.J. 633 Lee, J., K. Sanmugarasa, M. Blumenstein and Y.-C. Loo, Improving the reliability of a Bridge Management System (BMS) using an ANN-based Backward Prediction Model (BPM) 758 Lee, P.-C., see Lin, Y.-H. 792 Lee, W.-C., see Woo, S. 122 Lertlakkhanakul, J., J.W. Choi and M.Y. Kim, Building data model and simulation platform for spatial interaction management in smart home 948 Leu, S.-S., see Cheng, Y.-M. 682 Leung, S.-w., S. Mak and B.L.P. Lee, Using a real-time integrated communication system to monitor the progress and quality of construction works 749 Lewandowski, T., see Karlin´ski, J. 224 Li, C., Y.-G. Zhao, H. Liu, Z. Wan, C. Zhang and N. Rong, Monitoring second lining of tunnel with mounted fiber Bragg grating strain sensors 641 Li, H., see Wong, J. 284 Li, H., see Wong, J. 303 Li, H., T. Huang, C.W. Kong, H.L. Guo, A. Baldwin, N. Chan and J. Wong, Integrating design and construction through virtual prototyping 915 Liang, L.Y. and W.C. Chao, The strategies of tabu search technique for facility layout optimization 657 Lin, C.-C., W.-C. Wang and W.-D. Yu, Improving AHP for construction with an adaptive AHP approach (A3) 180 Lin, Y.-C., Developing construction assistant experience management system using people-based maps 975 Lin, Y.-H., P.-C. Lee, T.-P. Chang and H.-I. Ting, Multi-attribute group decision making model under the condition of uncertain information 792 Liu, H., see Li, C. 641 Liu, L.Y., see East, E.W. 201 ˜ ones-Rozo, C.A. 608 Liu, L.Y., see Quin Liu, M., see Lo, S.M. 852 Liu, S.-S. and C.-J. Wang, Resource-constrained construction project scheduling model for profit maximization considering cash flow 966 Lo, S.M., C.M. Zhao, M. Liu and A. Coping, A simulation model for studying the implementation of performance-based fire safety design in buildings 852 Loo, Y.-C., see Lee, J. 758 Lu, M., H.-C. Lam and F. Dai, Resource-constrained critical path analysis based on discrete event simulation and particle swarm optimization 670 Luu, C.D.T., see Ng, S.-t.T. 873 Magdicˇ, A., see Rebolj, D. 719 Mak, S., see Leung, S.-w. 749 Malaguti, F., Automation and robotic in construction: A new challenge for old and new industrialized countries 109 Malkawi, A., see Pelechano, N. 377 Manesis, S., see Deligiannis, V. 368 ˜ ez, C. 517 Martı´n, M.T., see Ordo´n Martin, S., see Cutler, B. 809 Martinez, J.C., see Kamat, V.R. 188 ˜ o, J. 413 Mene´ndez, M., see Toran
986
Author Index Volume 17
Metni, N. and T. Hamel, A UAV for bridge inspection: Visual servoing control
Sasaki, T. and K. Kawashima, Remote control of backhoe at construction site
law with orientation limits 3 Me˛z˙yk, A., see S´witon´ski, E. 251 Moczko, P., see Rusin´ski, E. 271 Mohamed, A., see Egemen, M. 864 Molfino, R.M., R.P. Razzoli and M. Zoppi, Autonomous drilling robot for
with a pneumatic robot system 907 Sass, L., A physical design grammar: A production system for layered
landslide monitoring and consolidation 111 Mooney, M.A., see Rinehart, R.V. 144 Moses, S., A. El-Hamalawi and T.M. Hassan, The practicalities of transferring data between project collaboration systems used by the construction industry 824 Mourgues, C., see Jongeling, R. 780 Nassar, K., Integrating discrete event and lighting simulation for analyzing construction work zones lighting plans 561 Nassar, K. and A. Al-Kaisy, Assessing sign occlusion in buildings using discrete event simulation 799 Nepal, M.P., see Staub-French, S. 11 Ng, S.-t.T. and C.D.T. Luu, Modeling subcontractor registration decisions through case-based reasoning approach 873 O’Connor, J.T., see Chou, J.-S. 65 Oh, S.W., see Kim, Y.S. 163 Olofsson, T., see Jongeling, R. 780 ˜ ez, C., P. Arias, J. Herra´ ez, J. Rodrı´guez and M.T. Martı´n, Two Ordo´n photogrammetric methods for measuring flat elements in buildings under construction 517 Palaneeswaran, E. and M.M. Kumaraswamy, An integrated decision support system for dealing with time extension entitlements 425 Pan, N.-F., Fuzzy AHP approach for selecting the suitable bridge construction method 958 Pan, N.-H., T.-C. Chiu and K.-Y. Chen, Full-span Pre-cast Launching Method (FPLM) analysis with Dynamic Simulation — Case studies of Taiwan HighSpeed Rail (THSR) Project 592 Park, J., see Chu, B. 130 Pelechano, N. and A. Malkawi, Evacuation simulation models: Challenges in modeling high rise building evacuation with cellular automata approaches 377 Podbreznik, P., see Rebolj, D. 719 Poon, C.S., see Baldwin, A.N. 333 Posiadala, B. and D. Cekus, Discrete model of vibration of truck crane telescopic boom with consideration of the hydraulic cylinder of crane radius change in the rotary plane 245 Prucnal-Wiesztort, M., see Gronowicz, A. 257 Przybyl/lek, G., see Derlukiewicz, D. 278 ˜ ones-Rozo, C.A., Y.M.A. Hashash and L.Y. Liu, Digital image reasoning for Quin tracking excavation activities 608 Razzoli, R.P., see Molfino, R.M. 111 Rebolj, D., A. Tibaut, N. Cˇusˇ-Babicˇ, A. Magdicˇ and P. Podbreznik, Development and application of a road product model 719 Ren, Z., C.J. Anumba, G. Augenbroe and T.M. Hassan, A functional architecture for an e-Engineering hub 930 Rinehart, R.V. and M.A. Mooney, Instrumentation of a roller compactor to monitor vibration behavior during earthwork compaction 144 ˜ ez, C. 517 Rodrı´guez, J., see Ordo´n Rong, N., see Li, C. 641 Rusin´ski, E., Editorial 217 Rusin´ski, E., see Karlin´ski, J. 224 Rusin´ski, E., see Karlin´ski, J. 232 Rusin´ski, E., P. Moczko and J. Czmochowski, Numerical and experimental analysis of a mine’s loader boom crack 271 Ruwanpura, J.Y., see Hewage, K.N. 940 Sacks, R. and R. Barak, Impact of three-dimensional parametric modeling of buildings on productivity in structural engineering practice 439 Sanmugarasa, K., see Lee, J. 758
manufacturing machines 691 Seo, J.W., see Kim, Y.S. 163 Seward, D.W., see Shaban, E.M. 645 Shaban, E.M., S. Ako, C.J. Taylor and D.W. Seward, Development of an automated verticality alignment system for a vibro-lance 645 Shen, L.Y., see Baldwin, A.N. 333 Sheng, Y., see Cutler, B. 809 Shi, J.J., D.-E. Lee and E. Kuruku, Task-based modeling method for construction business process modeling and automation 633 Shin, D.H. and P.S. Dunston, Identification of application areas for Augmented Reality in industrial construction based on technology suitability 882 Shin, Y., S.-H. An, H.-H. Cho, G.-H. Kim and K.-I. Kang, Application of information technology for mass customization in the housing construction industry in Korea 831 Skibniewski, M.J., see Jang, W.-S. 729 Skitmore, M., see Thomas Ng, S. 22 Smolnicki, T., see Karlin´ski, J. 232 Smolnicki, T., D. Derlukiewicz and M. Stan´co, Evaluation of load distribution in the superstructure rotation joint of single-bucket caterpillar excavators 218 Soar, R.C., see Buswell, R.A. 923 Soibelman, L., see Kim, H. 550 Stan´co, M., see Smolnicki, T. 218 Staub-French, S. and M.P. Nepal, Reasoning about component similarity in building product models from the construction perspective 11 Steins, R.J., see de Vries, B. 584 S´witon´ski, E. and A. Me˛z˙yk, Selection of optimum dynamic features for mechatronic drive systems 251 Tan, H.C., see Udeaja, C.E. 839 Taylor, C.J., see Shaban, E.M. 645 Thomas Ng, S., J. Xie, M. Skitmore and Y.K. Cheung, A fuzzy simulation model for evaluating the concession items of public–private partnership schemes 22 Thorpe, A., see Buswell, R.A. 923 Tibaut, A., see Rebolj, D. 719 Ting, H.-I., see Lin, Y.-H. 792 ˜ o, J., I. Diego, M. Mene´ndez and M. Gent, A finite element method (FEM) – Toran Fuzzy logic (Soft Computing) – virtual reality model approach in a coalface longwall mining simulation 413 Tsai, M.D., see Yin, S.Y.L. 536 Tsai, M.-H., see Cheng, M.-Y. 151 Tserng, H.P., see Yin, S.Y.L. 536 Uberna, M., see Gronowicz, A. 257 Udeaja, C.E., J.M. Kamara, P.M. Carrillo, C.J. Anumba, N.(Dino) Bouchlaghem and H.C. Tan, A web-based prototype for live capture and reuse of construction project knowledge 839 Wan, Z., see Li, C. 641 Wang, C.-J., see Liu, S.-S. 966 Wang, H.-H., see Lai, Y.-T. 623 Wang, L. and N.H. Wong, Coupled simulations for naturally ventilated residential buildings 386 Wang, L.-C., Enhancing construction quality inspection and management using RFID technology 467 Wang, Q., see Xiao, Q. 361 Wang, W.-C., see Lin, C.-C. 180 Wang, W.-C., see Lai, Y.-T. 623 Wang, X. and P.S. Dunston, User perspectives on mixed reality tabletop visualization for face-to-face collaborative design review 399 Williams II, R.L., see Bosscher, P. 45 Williams II, R.L., see Bosscher, P. 513 Wong, I., see Baldwin, A.N. 333 Wong, J., see Li, H. 915 Wong, J., H. Li and J. Lai, Evaluating the system intelligence of the intelligent building systems: Part 1: Development of key intelligent indicators and conceptual analytical framework 284
Author Index Volume 17
Wong, J., H. Li and J. Lai, Evaluating the system intelligence of the intelligent building systems: Part 2: Construction and validation of analytical models 303 Wong, N.H., see Wang, L. 386 Woo, S., D. Hong, W.-C. Lee, J.-H. Chung and T.-H. Kim, A robotic system for road lane painting 122 Wrobel, J. and M. Laudan´ski, Cost assessment in design of low volume manufacture machines 265 Xiao, Q., Q. Wang and Y. Zhang, Control strategies of power system in hybrid hydraulic excavator 361 Xie, J., see Thomas Ng, S. 22 Yakar, M., see Yilmaz, H.M. 489 Yang, L.-R., Exploring the links between task-level automation usage and project satisfaction 450
987
Yen, C.J., see Cheng, C.L. 897 Yildiz, F., see Yilmaz, H.M. 489 Yilmaz, H.M., M. Yakar and F. Yildiz, Documentation of historical caravansaries by digital close range photogrammetry 489 Yin, S.Y.L., H.P. Tserng and M.D. Tsai, A model of integrating the cycle of construction knowledge flows: Lessons learned in Taiwan 536 Yu, W.-D., see Lin, C.-C. 180 Zhang, C., see Li, C. 641 Zhang, Y., see Xiao, Q. 361 Zhao, C.M., see Lo, S.M. 852 Zhao, Y.-G., see Li, C. 641 Zoppi, M., see Molfino, R.M. 111