Corrigendum to “Evaluation and comparison of estimation methods for failure rates and probabilities”

Corrigendum to “Evaluation and comparison of estimation methods for failure rates and probabilities”

ARTICLE IN PRESS Reliability Engineering and System Safety 92 (2007) 131 www.elsevier.com/locate/ress Corrigendum Corrigendum to ‘‘Evaluation and c...

68KB Sizes 0 Downloads 25 Views

ARTICLE IN PRESS

Reliability Engineering and System Safety 92 (2007) 131 www.elsevier.com/locate/ress

Corrigendum

Corrigendum to ‘‘Evaluation and comparison of estimation methods for failure rates and probabilities’’ [Reliability Engineering & System Safety 91(2) (2006) 209–221] Jussi K. Vaurioa,, Kalle E. Ja¨nka¨la¨b a

Fortum Power and Heat Oy, P.O. Box 23, 07901 Loviisa, Finland b Fortum Nuclear Services, P.O. Box 10, 00048 Fortum, Finland Available online 3 March 2006

There are two typographical errors in Section 2.4. PREB procedure, in article: The correct step 4 should be as follows:  2 n X 1 Ki m Pn 2 wi m þ . 4v¼ T Ti 1  i¼1 wi i¼1

DOI of original article: 10.1016/j.ress.2005.01.001

Corresponding author. Tel.: +358 40 4139949; fax:+358 10 4554435.

E-mail address: [email protected] (J.K. Vaurio). 0951-8320/$ - see front matter r 2006 Elsevier Ltd. All rights reserved. doi:10.1016/j.ress.2006.01.001

Step 11 should read as follows: 11 Prior moments: M c ¼ m þ d=T  , V c ¼ v þ d=ðy0 T  Þ.