Journal Pre-proof

Experimental demonstration of data predictive control for energy optimization and thermal comfort in buildings Felix Bunning, Benjamin Huber, Philipp Heer, Ahmed Aboudonia, ¨ John Lygeros PII: DOI: Reference:

S0378-7788(19)32063-8 https://doi.org/10.1016/j.enbuild.2020.109792 ENB 109792

To appear in:

Energy & Buildings

Received date: Revised date: Accepted date:

2 July 2019 2 December 2019 16 January 2020

Please cite this article as: Felix Bunning, Benjamin Huber, Philipp Heer, Ahmed Aboudonia, ¨ John Lygeros, Experimental demonstration of data predictive control for energy optimization and thermal comfort in buildings, Energy & Buildings (2020), doi: https://doi.org/10.1016/j.enbuild.2020.109792

This is a PDF file of an article that has undergone enhancements after acceptance, such as the addition of a cover page and metadata, and formatting for readability, but it is not yet the definitive version of record. This version will undergo additional copyediting, typesetting and review before it is published in its final form, but we are providing this version to give early visibility of the article. Please note that, during the production process, errors may be discovered which could affect the content, and all legal disclaimers that apply to the journal pertain. © 2020 Published by Elsevier B.V.

Experimental demonstration of data predictive control for energy optimization and thermal comfort in buildings Felix B¨unning1,2,∗ , Benjamin Huber1,2,∗ , Philipp Heer1 , Ahmed Aboudonia2 , John Lygeros2 1 Urban

Energy Systems Laboratory, Swiss Federal Laboratories for Materials Science and Technology, Empa, D¨ubendorf, Switzerland

2 Automatic

Control Laboratory, Department of Electrical Engineering and Information Technology, ETH Z¨urich, Switzerland ∗ These

authors contributed equally to this work

Abstract Model Predictive Control for room temperature control in buildings is an effective approach to energy management in buildings. However, the development and maintenance of physical models may be a bottleneck for widespread real life application, especially for residential buildings. Data Predictive Control is an attempt to address this problem by learning the behaviour of the building from historical data and thus reducing the modelling effort. Here, we present an application of a Data Predictive Control approach, based on Random Forests with affine functions and convex optimization, to control the room temperature in a real life apartment. When compared to a conventional hysteresis controller, the applied approach saves 24.9 % of cooling energy while reducing the integral of comfort constraint violations by 72.0 % in a six-day experiment. A second experiment shows limitations when longer prediction horizons are needed. They are discussed together with directions of future work. Keywords: Data Predictive Control, Model Predictive Control, building energy, Random Forests, Machine Learning 1. Introduction Predictive control has the potential to reduce the energy consumption for heating and cooling in the building domain. Model Predictive Control (MPC) has been demonstrated many times successfully for temperature control in buildings (see for example (Oldewurtel ˇ et al., 2010; Sirok´ y et al., 2011; Oldewurtel et al., 2012; Huang et al., 2015) or the articles reviewed in (Hameed Shaikh et al., 2014)). However, there is to the best of the authors’ knowledge, no widespread industrial application of MPC in residential buildings. Some authors ˇ acˇ ekov´a et al., 2014; Sturzenegger et al., 2016; Jain (Z´ et al., 2018) argue that the effort to develop and maintain first principle models of buildings might in many cases be prohibitive for real life deployment of MPC to building energy management. The increasing availability of monitoring data in the building domain gives rise to the possibility of using data-driven modelling approaches for buildings. Here, the challenge lies in finding methods that show good prediction performance for temperatures in buildings and at the same time allow online real-time optimizaPreprint submitted to Elsevier

tion over the control inputs. Despite their non-convex nature, Artificial Neural Networks in combination with black-box optimization have been used for MPC in buildings (Costanzo et al., 2016; Macarulla et al., 2017; Ferreira et al., 2012; Finck et al., 2019). However, convex models might be beneficial as they allow guarantees on optimality and can be solved faster. They can therefore also be used for more computationally intensive online optimization problems, for example mixed integer optimization or demand response problems that require robust optimization and recourse (Warrington et al., 2012). Regression trees approximate a function y = f (x) by splitting x into partitions and approximating y with constant values within these partitions (more detail in Section 2). In contrast to the already mentioned Artificial Neural Networks for example, regression trees in combination with affine models of the control inputs are linear in these inputs. Jain et al. (2018) use a combination of regression trees and linear regression for peak power reduction in buildings to optimally trade-off peak power reduction against thermal comfort, under the name of Data PreJanuary 20, 2020

dictive Control (DPC). The regression trees are built with the help of historical building measurement data to model the input-output relation of the current state of the system and future disturbances as inputs to the future state of the system as output. The regression tree is combined with an affine model that relates the control inputs to the future states of the system. This yields a model that can be used for receding horizon MPC with convex optimization in the same way as a state-space building model. In (Smarra et al., 2018a) the method is extended by using random forests, which are ensembles of regression trees, instead of single regression trees to reduce the variance in prediction. In (Smarra et al., 2018b) the approach is further developed by replacing the affine control input - state relation by a switched state-space model. This allows the analysis of system properties such as stability. All these regression tree related studies use simulation for validation, where all disturbances are perfectly known and undesired disturbances and uncertainties can be excluded. There are a limited amount of studies (Costanzo et al., 2016; Macarulla et al., 2017; Ferreira et al., 2012; Finck et al., 2019) that use datadriven modelling techniques for control in the building domain in real life application case studies. However, to the best of the authors’ knowledge, there exists no real life demonstration of DPC for room temperature control in buildings to minimize energy consumption, as ˇ shown for MPC in (Oldewurtel et al., 2010; Sirok´ y et al., 2011; Oldewurtel et al., 2012; Huang et al., 2015). In these studies, control inputs are minimized while keeping room temperatures within comfort constraints. Here, we apply a variation of the DPC approach introduced in (Smarra et al., 2018a) to a real life residential apartment. The apartment features two identical bedrooms, one of which is DPC-controlled and the other one controlled with a standard hysteresis controller. Our results in a six-day experiment show that the room controlled with DPC consumes significantly less cooling energy than the conventionally controlled room, as well as showing fewer comfort constraint violations. In a second experiment we demonstrate the limitations of the approach in terms of the length of the prediction horizon. The trade-off between ease of model generation and maintenance in the case of DPC and the increased accuracy, interpretability and theoretical guarantees offered by first principles models remains to be analysed. The same holds for a detailed comparison of the modelling effort for DPC versus MPC. Such comparisons are out of scope of this short communication article and part of ongoing research.

The remaining article is structured as follows. In Section 2, the DPC approach by Smarra et al. (2018a) is explained and adapted to our setting. In Section 3, the residential apartment for the experiment is introduced and the particular DPC controller is specified. In Section 4, the performance of the DPC controller is compared to the hysteresis controller in terms of constraint violations and energy usage. Moreover, some limitations which need further investigation to be overcome are presented. Conclusions and future directions are provided in Section 5. 2. Methodology 2.1. Splitting of historical data We assume given a historical data set (X, Y) of measurements of a building. Y = {x(k + 1), ..., x(k + N)} consists of measurements of room temperatures x. X = {u(k), ..., u(k + N − 1), d(k − δ), ..., d(k + N − 1), x(k − δ), ..., x(k)} consists of measurements of data that potentially has an influence on Y. These are control inputs u (e.g. cooling energy), disturbances d (e.g. ambient temperature and solar radiation forecasts, but also time of day variables) and autoregressive terms of the room temperature x. N denotes the prediction horizon for the predictive controller, δ denotes the number of autoregressive terms. We further split X in two separate sets Xu = {u(k), ..., u(k + N − 1)}, which includes all measured control inputs (all variables that can be influenced by the controller), and Xd = {d(k − δ), ..., d(k + N − 1), x(k − δ), ..., x(k)}, which includes all measured disturbances and autoregressive terms of x (all variables that cannot be influenced by the controller). 2.2. Training of random forests We train N random forests to approximate the functions Xd → Y j , in which j ∈ 1, ..., N denotes the columns of Y.1 Random forests are ensembles of regression trees - a form of decision tree to approximate continuous functions. A decision tree is built by splitting the input data Xd into partitions p, yielding Xdp , in each of which the output data Y jp is approximated with a constant value y¯ pj (which is the mean of all elements of Y jp ). The splitting variable and splitting point is obtained with the help of a greedy heuristic: Consider a splitting variable v ∈ Xdp and a splitting point s, the pair of half planes R defined by these are 1 j ∈ 1, ..., N also denotes the steps in the prediction horizon as there is one forest for each step.

2

of j > 3. This can be explained by the high dimensionality of the fitting process for bigger prediction steps in combination with a limited amount of samples of pairs (xu , y j ) in each leaf li . We therefore model the predicted temperature in the jth step as

R1 (v, s) = {x ∈ Xdp |v ≤ s} and R2 (v, s) = {x ∈ Xdp |v > s}. (1) We seek the splitting variable v and splitting point s that solve  X  2 wi ( yi (xi ) − y¯ R1 min min j ) v,s y¯ R1 j xi ∈R1 (v,s)  (2) X  2  wi ( yi (xi ) − y¯ R2 + min j )   y¯ R2 j

x(k + j) = β ji,0 + β ji,1

n=1

by iterating over v and s. The variable wi can be used to apply sample-weighting techniques. If no sample weighting is applied its value is 1 for all xi . A random forest of T trees is built by bootstrapping (Efron, 1992) T subsets from (Xd , Y j ) and building a tree based on each subset. The function evaluation of the forest for one element (row) xd of Xd is then done by evaluating each tree, giving rise to T different y¯ j (xd ), and taking the average of these, giving rise to yˆ j (xd ). T is independent of N and needs to be chosen heuristically. For more details on the training process please refer to the original source (Smarra et al., 2018a) and to general literature on random forests (e.g. (Louppe, 2014)).

x(k + j) = β ji [1, u(k), ..., u(k + j − 1)]T + e,

Each tree has a number of leaves li , each based on a partition Xdp of Xd to approximate Y jp with a constant value y¯ pj (as discussed before). For each set Xdp there exists a corresponding set of measured control inputs Xup that has not been used in the model until here. (Smarra et al., 2018a) fit an affine model to approximate Y jp with Xup (to relate the response of the room temperature to the control inputs) with least squares in each leaf li . For the prediction of the future temperature of a single room x(k + j) (which corresponds to y j ) in one leaf, this gives

n=1

(5)

2.4. MPC-like use of DPC model The learned β j can be used to perform conventional receding horizon MPC. The corresponding convex optimization scheme follows

minimize u,

β ji,n u(k + n − 1) + e

(4)

with β ji being a row vector of dimension j + 1.2 In the case where random forests are used instead of regression trees, the average of all relevant β ji is taken, giving rise to β j . We note in passing that the variables y¯ j (xd ) and yˆ j (xd ) are discarded after the training process. They only serve as a heuristic to find good splits in the regression trees as it is computationally intractable to do the splitting based on equation (4).

2.3. Fitting of affine functions for control inputs

x(k + j) = β ji,0 +

u(k + n − 1) + e,

in which the dimension of β ji is reduced to 2 for all j. This approach is less realistic than eq. (3), as u(k) will have the same effect on x(k + j) as u(k + j − 1) has, whereas one would expect the effect of earlier time steps to be weaker. However, preliminary experiments suggested that the advantage of better model fits outweighs the disadvantage of a less realistic model. Moreover, the approach can still capture fast and slow dynamics, as fast dynamics will lead to non-zero β for small j whereas slow dynamics or lags will lead to β being zero. We can rewrite eq. (4) as

xi ∈R2 (v,s)

j X

j X

(3)

subject to

N−1 X

uTk+ j Ruk+ j + λk+ j+1

j=0

xk+ j = β j [1, u(k), ..., u(k + j − 1)]T xmin − k+ j ≤ xk+ j ≤ xmax + k+ j

in which β ji,0 and β ji,n denote the fitted coefficients and e the model error. The temperature is therefore an affine function of all control inputs from the time instant k, when the forecast is made, to the forecasted time instant k+j. As each leaf li is based on a different partition of Xd , β ji,0 and β ji,n are also different for each leaf. Preliminary results suggested that the proposed approach leads to weak prediction performance in the case

(6)

u∈U ≥0

j = 1, ..., N

2 The dimensions of β and u(k), ..., u(k + j − 1) of course change ji if multiple rooms are considered because in that case also x(k + j) becomes a vector.

3

DPC

N

On/Off

Figure 1: NEST building with controlled residential unit UMAR c Zooey Braun, Stuttgart marked in white

Figure 2: Layout of the controlled building unit

in which R and λ denote costs for control inputs and constraint violations,  is a slack variable for the comfort constraint, xmin and xmax denote the comfort constraints and U defines the set of allowed control inputs. The algorithm for the online phase of the DPC controller is shown in 1. Note that formulation (6) would also allow the incorporation of variable COP of a chiller by adjusting R based on the weather forecast for example, or the inclusion of electrical reserve provision through robust optimization and affine policies as presented by Warrington et al. (2012). In general, the model can be coupled to first-principles models of HVAC components.

front that faces east-southeast. The unit is constructed with materials that are either recycled or can be completely recycled after the lifetime of the building. For more details on the hull we refer to (Heisel et al., 2019; Kakkos et al., 2019; Heisel and Rau-Oberhuber, 2020). The whole apartment is equipped with combined heating and cooling ceiling panels that are operated with water. The panels are connected in parallel to two central heat exchangers that connect the unit to the central heating and cooling system of the NEST building. In the cooling case (present in this experiment) the water in the unit has a constant supply temperature of 18 ◦ C. The amount of transferred heat is controlled by an individual open/closed valve in each room. Here, the cooling energy of one room is approximated by the total cooling energy consumption of the apartment, the design mass flows to each room at a fully open valve and the valve opening time during one sample period. A similar approximation would have to be made in most residential buildings as measurements of heating/cooling energy for individual rooms are usually not available. The right room is controlled by the DPC controller presented in this study, the left room is controlled by a hysteresis controller. The hysteresis-controlled room was occupied during the experiment, the DPC-controlled room was unoccupied. (This was switched in the validation experiments in Appendix A.)

Algorithm 1 1: procedure DPC controller (online) 2: for k in runtime do 3: for j in 1, .., N do 4: find all leaves li in forest j based on current state and predicted disturbances xd (k) 5: construct β j by averaging over all β ji in all found li 6: solve optimization problem (6) 7: apply u(k) to the system

3. Case study 3.2. Controller set-up

3.1. General description The controlled apartment is the “Urban Mining and Recycling” residential unit in the NEST demonstrator building at Empa in Switzerland (Richner et al., 2018) and is marked in Figure 1. A schematic of the layout is shown in Figure 2. On the left and right side, the apartment features two nearly identical bedrooms that both have a floor area of 17.6 m2 and a large window

The applied DPC algorithm uses as inputs autoregressive terms and the forecast ambient temperature and solar radiation from the Federal Office of Meteorology and Climatology (MeteoSwiss), the time of the day encoded in a sinus and cosinus function and autoregressive terms of the room temperature and neighbouring rooms with 4

δ = 16.3 We use a forest of T=200 trees with a minimum amount of 200 historical samples in each leaf. The forest is trained on 10 months of historical measurement data, sampled in a 10-minute interval. Instead of absolute room temperatures x, we use the approach to model and predict temperature changes ∆x. This does not fundamentally change the algorithm but led to better prediction performance in preliminary experiments. Moreover, we use sample weighting in the historical measurement data set to train the forests in order to adjust the importance of individual samples based on their location in the input space.4 The prediction horizon is N=6 with a sampling time of one hour, the cost per squared unit of cooling is R=1 and the cost per unit of comfort constraint violation is λ=100. The comfort constraints are 22-23 ◦ C during the night (8.00 pm to 8.00 am) and 22-25 ◦ C during the day (8.00 am to 8.00 pm).5 Measurements of the autoregressive terms and weather forecasts are queried via a Python-SQL-client from a database, the DPC algorithm is implemented in Python 3 using Scikit-learn (Pedregosa et al., 2011), communication with the actuators in the building is established via a Python-OPC UA client. The hysteresis controller works in the following way: It switches on when the upper DPC constraint is reached, it switches off when the temperature is 1 ◦ C below the upper constraint. We do not force the hysteresis controller to cool down until the lower DPC constraint as this would result in a much higher energy consumption for the hysteresis controller and non-comparable average room temperatures. We chose 1 ◦ C, as this configuration is equal to the standard controller of the apartment and therefore provides a realistic comparison with the ”state of the art”. Moreover, it provides a reasonable balance between energy consumption and comfort constraint violation. The connection to the database and actuators is established the same way as for the DPC controller.

4. Results and Discussion 4.1. Comparison between DPC and hysteresis controller Figure 3 shows the results for a six-day experiment from 2019-06-20 2.00 pm until 2019-06-26 2.00 pm in the apartment with a cooling demand. The bottom two graphs show the ambient conditions measured at the roof-top of the building. It can be seen that ambient temperatures between 13.7 and 39.5 ◦ C and solar radiations between 0 and 1310 W/m2 (which is unrealistic due to the use of a non-calibrated sensor, but irrelevant as the used approach is data-driven) are present during the time of the experiment. The conditions allow a good estimation of the controller performance as the experiment covers the range from mild cooling on 0622 with a maximum daily temperature of 22.7 ◦ C and heavy cooling (to the cooling system’s limit) at the end of the experiment with a maximum daily temperature of 39.5 ◦ C. The top graph of Figure 3 shows the trajectory of the room temperatures (with a quantisation of 0.15 ◦ C) for the DPC-controlled room in blue, and the hysteresiscontrolled room in dashed orange. The DPC comfort constraints are plotted in grey. First, it should be noted that the rooms indeed show very similar dynamics. For example, in the middle of day 06-24 (marked by the grey period 2 in the figure), where cooling is switched off in both rooms and the constraint jumps to 25 ◦ C, the temperatures follow the same upwards trend. This observation is confirmed by the validation experiments in Appendix A. It can be seen that the DPC controller shows much less constraint violations than the hysteresis controller. More specifically, the integral of the constraint violations is 72.0 % smaller in the DPC case. This is to be expected as the hysteresis controller has no predictive capabilities and only starts cooling once it hits a constraint. But it also shows that the prediction accuracy of the DPC-model is accurate enough to start cooling early during the day in order to not violate the upper comfort constraint during the night: The temperature trajectory in the DPC controlled room exactly meets the lowered temperature constraint at 8.00 pm on all days except 0625. On the evening of 06-25 the constraint is not met because the cooling system operated at it’s maximum capacity with a maximum ambient temperature of 39.5 ◦ C on that particular day and an ambient temperature of still 34.6 ◦ C at 8.00 pm (grey period 4 in the figure). This issue could possibly addressed with a longer prediction horizon to allow pre-cooling. During night time, the temperature in the DPC-controlled room stays

3 This number might seem excessive, however, additional inputs do

not affect the fitting process of regression trees negatively, as unimportant inputs do not get chosen as splitting/partitioning variables. 4 More precisely, for the training of the regression trees, each sample is projected to a discretized three-dimensional space spanned by the response variable Y (i.e. the temperature change in the room), the ambient temperature at time k + j and the solar radiation at time k + j. The weight wi of each sample is the reciprocal of the sum of samples in its discretized area. The sample weight is then considered by multiplying (yi − y¯ Rj )2 with wi for each sample in equation (2). A corresponding approach is taken in the fitting of equation (4) depending on Y and the control inputs u(k), ..., u(k + j). 5 This is done to allow a better assessment of the predictive capabilities of the controller and to simulate a situation where the occupants are out-of house (e.g. at work) during the day.

5

Solar radiation in W/m2

25 24 23 22

1.0 0.5 0.0 1.0 0.5 0.0 40

Ambient temperature in °C

Relative integrated control input

Relative control input

Room temperature in °C

- numbered.pdf

constraints DPC OnOFF

 





2019-06-21 DPC OnOFF

2019-06-22

2019-06-23

2019-06-24

2019-06-25

2019-06-26

2019-06-21 DPC OnOFF

2019-06-22

2019-06-23

2019-06-24

2019-06-25

2019-06-26

2019-06-21

2019-06-22

2019-06-23

2019-06-24

2019-06-25

2019-06-26

2019-06-21

2019-06-22

2019-06-23

2019-06-24

2019-06-25

2019-06-26

2019-06-21

2019-06-22

2019-06-23 2019-06-24 Timestamp

2019-06-25

2019-06-26

30 20

1000 500 0

Figure 3: DPC cooling experiment results

close to the upper constraint most of the time. This is desirable for a predictive controller in the cooling case because it minimizes the control input.

ings are not due to a higher average room temperature. Of course, a lower hysteresis band would decrease the energy consumption of the hysteresis-controlled room. However, it would most likely also increase the comfort constraint violations and the frequency at which the valve opens and closes. Over the course of the whole experiment, the DPC-controller saved 24.9 % cooling energy compared to the hysteresis controlled room, as can be seen in the middle graph that shows the relative integral of the control input.

The second graph of Figure 3 shows the control input (relative between minimum cooling capacity of 0 and maximum of -0.6 kWh/h) during the experiment. It can be seen that the hysteresis controller uses much more cooling energy than the DPC-controller. This is partly due to always cooling until the room temperature is one degree below the upper comfort constraint. However, the average temperature in the DPC-controlled room is only 0.1 ◦ C above the hysteresis-controlled room, which is in the range of the quantisation error of the temperature sensor. This shows that the cooling energy sav-

Both top graphs show two more areas with grey background. In the first period between 06-22 and 06-23 (marked by grey period ) 1 the controllers lost connection to the actuators multiple times, which caused the 6

valves in the cooling system to open and close multiple times - thus the part load in the hysteresis controlled room. In the third period on 06-26 (marked by grey period ), 3 the windows were opened in both rooms for a period of 10 minutes. This automatically switches off cooling and together with an ambient temperature higher than the room temperature resulted in a slight increase in room temperature.

xa (k + j) =

β ji,0 + β ji,1

j X n=1

+

X

b∈Ba

β ji,b

ua (k + n − 1) j X n=1

(7)

ub (k + n − 1) + e

However, the trade-off between computational complexity and the model prediction performance needs to be analysed. We therefore conclude that DPC as implemented here might not yet be suitable for commercial buildings or for other problems where long prediction horizons (in relation to the time constants of the dynamics of the system) are needed. To further investigate potentials and limitations of the approach, experiments with a heating case and control of the whole apartment as well as further comparisons to other types of controllers such as linear state space MPC, hysteresis with other bands, PI, and other data-driven approaches, are part of current and future research. This also includes an analysis of the modeling effort, computational scalability and CPU and memory footprint of DPC versus MPC for which we cannot make an informed statement at the current state of research.

4.2. Limitations The presented results have shown that DPC has advantages in terms of energy consumption and comfort compared to a standard hysteresis controller commonly used in buildings. However, the approach also has limitations that need to be overcome in future research to make it competitive with advanced control methods, such as those based on first principles models and MPC. For example, Figure B.6 in Appendix B shows the results of an experiment where DPC controllers with a sampling time of 1h and a horizon of 6 h and 9 h (N=6 and N=9) respectively were compared. The controller with a 9 h horizon uses significantly more cooling energy than the controller with the 6 h horizon, because it starts cooling much earlier to meet the 8.00 pm constraint. This phenomenon is due to the dimensionality reduction performed from equation (3) to (4), which causes the controller to overestimate the effect of early control inputs for large j. Longer prediction horizons for the same building dynamics might therefore not be feasible with the current DPC approach, as one would either have to base the training on equation (3), leading to high dimensionality with limited amount of training data, or equation (4), leading to overestimation of the effect of early control inputs. One can think of heuristics for overcoming this problem, for example using (4) but multiplying control input u( j) with an increasing function such as (1 − e− j ) to “devalue” early control inputs, but the effectiveness of these remains to be investigated. As a comparison: Sturzenegger et al. (2016) use a prediction horizon of 58 h with a sampling time of 15 minutes, leading to N=232, to control a 6000 m2 office building. Related difficulties arise if many different control inputs are coupled to single states, as this again increases the number of fitting variables in equation (3) or (4). A coupling of rooms a and all neighbouring rooms b ∈ Ba can in principled be established easily by replacing equation (4) by

5. Conclusion Data Predictive Control in buildings constitutes an attempt to lower the effort for model development and maintenance for predictive thermal building control. Despite good simulation results there is no practical experience in real life cases for room temperature control between comfort constraints and minimization of cooling or heating input with such methods so far. Here, we apply a DPC approach based on Random Forests with affine functions and convex optimization to temperature control in a real life residential apartment and compare the controller to a conventional hysteresis controller. The temperature in the room controlled by DPC shows 72.0 % less integrated comfort constraint violations than in the room controlled with hysteresis-control. Moreover, the DPC controller saves 24.9 % of cooling energy. The experiment constitutes a promising first real life application of the algorithm and demonstrates that DPC might be well suited for the control of residential buildings. Experiments with a longer control horizons suggested that the applicability for commercial buildings might be limited at the current state. A comparison 7

to other control approaches such as linear state space MPC as well as experiments regarding heating and control of the whole apartment are part of ongoing and future research.

% and in validation experiment 2 to 29.7 %, both compared to the respective hysteresis controller. The difference in average room temperature was less than 0.05 ◦ C in both experiments. The integrated constraint violation was reduced by 74.8 % and 79.7 % respectively.

Acknowledgements Appendix B. Experiment with 9-hour horizon

We would like to thank Kristina Orehounig, Viktor Dorer and Roy S. Smith for their valuable help and support. We are also grateful to Annika Eichler, Benjamin Flamm, Andrea Iannelli, Mohammad Khosravi, Jeffrey Lungthok, Anil Parsi, Nicolas Schmid, Bratislav Svetozarevic, Christoph Waibel, Joseph Warrington and Suli Zou for fruitful discussions. Moreover, we would like to thank Reto Fricker, Ralf Knechtle and Sascha Stoller for sharing their expertise and help with the implementation, and Spyros Georgakos for showing patience and engagement with our experiments. This research project is financially supported by the Swiss Innovation Agency Innosuisse and is part of the Swiss Competence Center for Energy Research SCCER FEEB&D.

To show the limitations of the DPC approach, an experiment with a 9 h horizon was performed. The results are shown in Figure B.6 and discussed in Section 4.2.

References Costanzo, G., Iacovella, S., Ruelens, F., Leurs, T., Claessens, B., jun 2016. Experimental analysis of data-driven control for a building heating system. Sustainable Energy, Grids and Networks 6, 81–90. URL https://linkinghub.elsevier.com/retrieve/pii/ S2352467716000138 Efron, B., 1992. Bootstrap Methods: Another Look at the Jackknife. Springer, New York, NY, pp. 569–593. URL http://link.springer.com/10.1007/978-1-46124380-9{_}41 Ferreira, P., Ruano, A., Silva, S., Conceic¸a˜ o, E., dec 2012. Neural networks based predictive control for thermal comfort and energy savings in public buildings. Energy and Buildings 55, 238–251. URL https://linkinghub.elsevier.com/retrieve/pii/ S037877881200388X Finck, C., Li, R., Zeiler, W., 2019. Economic model predictive control for demand flexibility of a residential building. Energy 176, 365– 379. Hameed Shaikh, P., Bin Mohd Nor, N., Nallagownden, P., Elamvazuthi, I., Ibrahim, T., 2014. A review on optimized control systems for building energy and comfort management of smart sustainable buildings. Renewable and Sustainable Energy Reviews 34, 409–429. URL http://dx.doi.org/10.1016/j.rser.2014.03.027 Heisel, F., Hebel, D. E., Sobek, W., feb 2019. Resource-respectful construction the case of the Urban Mining and Recycling unit (UMAR). IOP Conference Series: Earth and Environmental Science 225 (1), 012049. URL http://stacks.iop.org/17551315/225/i=1/a=012049?key=crossref. 0cf4af0855aeb67212d563b2a2d69f49 Heisel, F., Rau-Oberhuber, S., jan 2020. Calculation and evaluation of circularity indicators for the built environment using the case studies of UMAR and Madaster. Journal of Cleaner Production 243, 118482. URL https://www.sciencedirect.com/science/ article/pii/S0959652619333529 Huang, H., Chen, L., Hu, E., 2015. A new model predictive control scheme for energy and cost savings in commercial buildings: An airport terminal building case study. Building and Environment 89, 203–216. URL http://dx.doi.org/10.1016/j.buildenv.2015.01. 037 Jain, A., Smarra, F., Behl, M., Mangharam, R., jan 2018. Data-Driven Model Predictive Control with Regression TreesAn Application

Conflict of interest None. Appendix A. Validation experiments We have conducted two experiments from 2019-0531 0.00 am to 2019-06-06 0.00 am (validation experiment 1) and 2019-06-15 0.00 pm to 2019-06-20 0.00 pm (validation experiment 2) before the experiment described in the main body of this article. The results, shown in Figure A.4 and Figure A.5 respectively, were not used as the main result for this study because both DPC and hysteresis controller were not yet operating totally correct: The DPC controller sometimes saw the lowered upper constraint at 8.00 pm too late because the optimization was performed at 1.59 pm instead of 2.00 pm, resulting in increased constraint violations. The hysteresis controller sometimes started cooling before hitting the upper constraint. However, these results are suitable to confirm 1. that the thermal dynamics of both rooms are indeed very similar: validation experiment 1 and 2 were performed with the DPC controller operating in the left room and the hysteresis controller operating in the right room in contrast to the main experiment; and 2. that the order of magnitude of energy savings is realistic and the presented main result is not a best-case example. In validation experiment 1 the energy saving amounted to 31.9 8

Room temperature in °C Relative control input Relative integrated control input

24 23 22

1.0

bounds DPC DPC OnOFF 2019-05-31

2019-06-01

2019-06-02

2019-06-03

2019-06-04

2019-06-05

0.5 0.0 1.0 0.5 0.0

Ambient temperature in °C Solar radiation in W/m2

25

2019-06-06

DPC OnOFF 2019-05-31 DPC OnOFF

2019-06-01

2019-06-02

2019-06-03

2019-06-04

2019-06-05

2019-06-06

2019-05-31

2019-06-01

2019-06-02

2019-06-03

2019-06-04

2019-06-05

2019-06-06

2019-05-31

2019-06-01

2019-06-02

2019-06-03

2019-06-04

2019-06-05

2019-06-06

2019-05-31

2019-06-01

2019-06-02

2019-06-03 Timestamp

2019-06-04

2019-06-05

2019-06-06

30 20

10 1000 500 0

Solar radiation in W/m2

25 24 23 22

bounds DPC DPC OnOFF 2019-06-16

1.0

2019-06-17

2019-06-18

2019-06-19

2019-06-20 DPC OnOFF

0.5 0.0 1.0 0.5 0.0

Ambient temperature in °C

Relative integrated control input

Relative control input

Room temperature in °C

Figure A.4: DPC cooling validation experiment 1

2019-06-16

2019-06-17

2019-06-18

2019-06-19

2019-06-20

2019-06-16

2019-06-17

2019-06-18

2019-06-19

2019-06-20

2019-06-16

2019-06-17

2019-06-18

2019-06-19

2019-06-20

2019-06-16

2019-06-17

2019-06-18 Timestamp

2019-06-19

2019-06-20

DPC OnOFF

30 20

1000 500 0

Figure A.5: DPC cooling validation experiment 2

9

Room temperature in °C Relative control input Relative integrated control input

25

bounds DPC DPC 6h DPC 9h

24 23

22 07-16 05 1.0 DPC 6h DPC 9h 0.5 0.0 07-16 05 1.0 DPC 6h DPC 9h 0.5

07-17 05

07-17 17

07-18 05

07-18 17

07-19 05

07-19 17

07-20 05

07-16 17

07-17 05

07-17 17

07-18 05

07-18 17

07-19 05

07-19 17

07-20 05

07-16 17

07-17 05

07-17 17

07-18 05

07-18 17

07-19 05

07-19 17

07-20 05

07-16 17

07-17 05

07-17 17

07-18 05

07-18 17

07-19 05

07-19 17

07-20 05

07-16 17

07-17 05

07-17 17

07-18 05 Timestamp

07-18 17

07-19 05

07-19 17

07-20 05

Solar radiation in W/m2

Ambient temperature in °C

0.0 07-16 05 30 25 20 15 07-16 05 1000

07-16 17

500 0 07-16 05

Figure B.6: DPC cooling 6h and 9h horizon

URL https://www.sciencedirect.com/science/ article/pii/S0378778811004105 Pedregosa, F., Varoquaux, G., Gramfort, A., Michel, V., Thirion, B., Grisel, O., Blondel, M., Prettenhofer, P., Weiss, R., Dubourg, V., Vanderplas, J., Passos, A., Cournapeau, D., Brucher, M., ´ 2011. Scikit-learn: Machine Learning Perrot, M., Duchesnay, E., in Python. Journal of Machine Learning Research 12 (Oct), 2825–2830. URL http://www.jmlr.org/papers/v12/pedregosa11a. html Richner, P., Heer, P., Largo, R., Marchesi, E., Zimmermann, M., Zimmermann, M., jan 2018. NEST una plataforma para acelerar la innovaci´on en edificios. Informes de la Construcci´on 69 (548), 222. URL http://informesdelaconstruccion.revistas. csic.es/index.php/informesdelaconstruccion/ article/view/5879 ˇ Sirok´ y, J., Oldewurtel, F., Cigler, J., Pr´ıvara, S., sep 2011. Experimental analysis of model predictive control for an energy efficient building heating system. Applied Energy 88 (9), 3079–3087. URL https://www.sciencedirect.com/science/ article/pii/S0306261911001668 Smarra, F., Jain, A., de Rubeis, T., Ambrosini, D., D’Innocenzo, A., Mangharam, R., 2018a. Data-driven model predictive control using random forests for building energy optimization and climate control. Applied Energy 226, 1252–1272. Smarra, F., Jain, A., Mangharam, R., D’Innocenzo, A., jan 2018b. Data-driven Switched Affine Modeling for Model Predictive Control. IFAC-PapersOnLine 51 (16), 199–204. URL https://www.sciencedirect.com/science/ article/pii/S2405896318311509 Sturzenegger, D., Gyalistras, D., Morari, M., Smith, R. S., jan 2016.

to Building Energy Management. ACM Transactions on CyberPhysical Systems 2 (1), 1–21. URL http://dl.acm.org/citation.cfm?doid=3174275. 3127023 Kakkos, E., Heisel, F., Hebel, D. E., Hischier, R., feb 2019. Environmental assessment of the Urban Mining and Recycling (UMAR) unit by applying the LCA framework. IOP Conference Series: Earth and Environmental Science 225 (1), 012043. URL http://stacks.iop.org/17551315/225/i=1/a=012043?key=crossref. 942b104deeaf0373ef421e5565c9530e Louppe, G., jul 2014. Understanding Random Forests: From Theory to Practice. URL http://arxiv.org/abs/1407.7502 Macarulla, M., Casals, M., Forcada, N., Gangolells, M., sep 2017. Implementation of predictive control in a commercial building energy management system using neural networks. Energy and Buildings 151, 511–519. URL https://www.sciencedirect.com/science/ article/pii/S0378778817300907 Oldewurtel, F., Parisio, A., Jones, C., Morari, M., Gyalistras, D., Gwerder, M., Stauch, V., Lehmann, B., Wirth, K., 2010. Energy Efficient Building Climate Control using Stochastic Model Predictive Control and Weather Predictions. In: Proceedings of the 2010 American Control Conference. Ieee Service Center, 445 Hoes Lane, Po Box 1331, Piscataway, Nj 08855-1331 Usa, pp. 5100– 5105. URL https://infoscience.epfl.ch/record/169733 Oldewurtel, F., Parisio, A., Jones, C. N., Gyalistras, D., Gwerder, M., Stauch, V., Lehmann, B., Morari, M., feb 2012. Use of model predictive control and weather forecasts for energy efficient building climate control. Energy and Buildings 45, 15–27.

10

Model Predictive Climate Control of a Swiss Office Building: Implementation, Results, and CostBenefit Analysis. IEEE Transactions on Control Systems Technology 24 (1), 1–12. URL http://ieeexplore.ieee.org/document/7087366/ Warrington, J., Goulart, P. J., Mariethoz, S., Morari, M., dec 2012. Robust reserve operation in power systems using affine policies. In: 2012 IEEE 51st IEEE Conference on Decision and Control (CDC). IEEE, pp. 1111–1117. URL http://ieeexplore.ieee.org/document/6425913/ ˇ acˇ ekov´a, E., V´aÅa, Z., Cigler, J., dec 2014. Towards the real-life Z´ implementation of MPC for an office building: Identification issues. Applied Energy 135, 53–62. URL https://www.sciencedirect.com/science/ article/pii/S0306261914008071

11

Felix Bünning: Conceptualization, Methodology, Writing - Original Draft, Visualization, Project administration Benjamin Huber: Methodology, Software, Validation, Investigation, Writing - Review & Editing Philipp Heer: Conceptualization, Resources, Writing - Review & Editing, Supervision, Project administration Ahmed Aboudonia: Methodology, Writing - Review & Editing, Supervision John Lygeros: Conceptualization, Resources, Writing - Review & Editing, Supervision, Project administration