The
funding,
if granted,
would
be used
support
20 research
projects
biomass,
geothermal
and solar thermal
production.
Germany
wind-generated 8,000
is a leading
electricity
MW installed
of 18,000
MW.
for offshore
capacity
energy
offshore
wind
country’s
electricity
to cover
demand
mix, with
But Germany double
making
of the
is expected
to reach
its target
by 2005,
account
consumption.
to
ahead of
for
The
the 2005 deadline
8.5%
target
of
SonnenStrom
two joint project
European Commission Framework
in
called for by the
Diiectorate-GeneraJ
Transport and Energy (DG TRE@ 5th
programme
for
within the
for
research,
projects
were approved
have been running
($13.7m).
The
integrate urban
projects
renewable
activities,
Spain,
project
energy
environment
other
systems
and Germany
to
into
the
1.15 MW photovoltaic
partners
solar electricity
from a
plant on
will be one of
Phijnix
SonnenStrom design,
monitoring
output.
competence plant
and planning.
Forum
presented April
This
by the millions
Universal
concept calls
for
The
demands
dedicated
2004.
to many
‘Sustainable
which
The
themes
on
will be
will be
in
Energies
in
EU project.
This initiative
SonnenStrom
in the region
develop
April 2002
official has said. The Minister
MW
to generate
and will be implemented
own and operate (BOO) ‘In iine with government
of
Centre,
the Higher
sources
of Aqaba,
linked and
standardised
plans
to the electric
Ministry
at
a
detailed before
The demand
plant
capacity for energy
least
100
35 kilometres with
job north
the national
The Jordanian
grids
future,
grid is
of Syria and Egypt,
will be connected
Turkey and several North
assessment
by gas or
African
to
countries.
has formed
a committee aspects
of the
The developer will
environmental
impact
construction.
Jordan’s
amounts
to 1,500 MW.
is expected
to grow at
3% yearly in the next decade.
of of the
energy
Saudi solar panels on water pipeline
by 2030.
a 50 kWh
service packages
for
has set itself
of Fiirstenfeldbruck
create
and will be linked
The Energy
of
electricity.
m Quwairah,
in the near
Research
the umbrella
will be assisted
will
.
Energy
under
for Science and Technology.
heavy fuel to generate project
the
said Malek Kabariti,
National
Council
opportun~tles
on a build,
implementation,
functions
Solar energy
100-150
no risk, as it will not share
the
which
project
basis.
the BOO
assumes
&
of Energy
between
provide
of
Urban
District
district
a senior government
area in southern Jordan,
that
100% renewable
in Fiirstenfeldbruck
piant in the Quwairah
build a solar hybrid
proposal.
is the local coordinator
the aim of guaranteeing
Ph6nix
A German firm has submitted a proposal to to
company’s
near Munich
the
sites in other
of photovoltaic
German
the
to
plants
regions.
wili be
‘Ziel (Aim) 21 - the Centre
Fiirstenfeldbruck’
plant
the spread
European
will
know-how
of jointly-owned
and financial
forum
of Fiirstenfeldbruck
and its initiative
supplies
and
and Huelva
European
the concept
total generating
The district
RENET
promote
required
their
with the
Close cooperation of Barcelona
to
owners
and produce
technical
Environment’.
Innovatory
the
plant
to study
between
including
Development
ensure
as a joint
non-home
electric grid, said Kabariti.
to the ‘2004
for the first time in Barcelona
and September
for
technical
result
of visitors
of Cultures,’
for
plans
and makes the highest
design
judged
AG is responsible and
provinces
The
the largest solar plants in Spain.
planning,
Spanish
Fiirstenfeld-
conceived
invest in a solar power
President
in the Barcelona
of Be&s. The MW project
been
in the cost of construction,’
will be installing
the 2 1,000 mz roof of a pergola suburb
aims
on a large scale. Amongst
the seven project
Sweden
The
is +?15,730,000
EUPRES
has
site, enabling
is scheduled
and contracts
since the start of 2002.
total brtdget for both
plant
investment
The
Mineral Resources said that a $200m
technological development and demonstration. These
information.
Jordan’s solar cogen
AG has participated
proposals
bruck
to ensure
output
For further ifl~~ation contact: Andrea Zepf, PhGnix SonnenStrom AG, ~irschbergstrasse 8, D-85254 Sulzemoos, Germany. Tel: +49 8135 938000, Email:
[email protected]
is 12%,
easily attainable.
Phiinix SonnenStrom wins e15.7m contracts Ph6nix
public
performance
output
of electricity
the
and
It will be
plants.
for controlling
and visualisation optimal
administration
of photovoltaic
own solar electricity.
to wind energy
a time lag of 10 years.
Renewables
elecrricity
and
by 2030.
its share of renewables
schedule.
total
on-
25%
Biomass has a similar potential in the power
for over
wants
planning,
responsible
of
in the global
of finance, maintenance
electricity
producer
- it accounts
Government
to
wind,
solar and to
in the area
Unitec has received its second order for the Qurayat
water
pipeline
project
in
the
Kingdom of Saudi Arabia. The order is valued
Photovoltaics Bulletin 0