Large multistage axial turbines

Large multistage axial turbines

Available online at www.sciencedirect.com ScienceDirect ScienceDirect Energy Procedia 00 (2017) 000–000 Availableonline onlineatatwww.sciencedirect...

814KB Sizes 56 Downloads 146 Views

Available online at www.sciencedirect.com

ScienceDirect ScienceDirect

Energy Procedia 00 (2017) 000–000

Availableonline onlineatatwww.sciencedirect.com www.sciencedirect.com Available Energy Procedia 00 (2017) 000–000

www.elsevier.com/locate/procedia

ScienceDirect ScienceDirect

www.elsevier.com/locate/procedia

Energy Procedia 129 Energy Procedia 00(2017) (2017)1078–1084 000–000 www.elsevier.com/locate/procedia

IV International Seminar on ORC Power Systems, ORC2017 13-15 September 2017,Power Milano, Italy ORC2017 IV International Seminar on ORC Systems, 13-15 September 2017, Milano, Italy

Large multistage axial turbines

The 15th International Symposiumaxial on District Heating and Cooling Large multistage turbines

Roberto Binia, Davide Colomboa,* a a Roberto Biniof , Davide ,* demand-outdoor feasibility usingColombo the heat Turboden S.p.A., via Cernaia 10, 25124 Brescia, Italy

Assessing the Turboden via Cernaia 10, 25124 Brescia, Italyheat demand forecast temperature function forS.p.A., a long-term district a a

Abstract

a,b,c

a

a

b

c

c

*, A. Pina , P. Ferrão , J. Fournier ., B. Lacarrière , O. Le Corre Abstract I. Andrić 1. Though multistage axial turbines are being widely used since many decades for water steam expansion or in gas turbines, their a Center Innovation,found Technology and Policy - Instituto Superior Av. Rovisco Paiswith 1, 1049-001 Lisbon, Portugal useThough inIN+ ORCs has for traditionally limitations as a Research consequence of the choiceTécnico, of turbines cantilever 1. multistage axial turbines are being widely used since many decades fordesigning water steam expansion or in gas arrangements. turbines, their b Veolia Rechercheis&mainly Innovation, 291 to Avenue Dreyfous Daniel, 78520simple Limay, France 2. The choice of the cantilever arrangement related the advantages of having shaft bearings design, only one use in ORCs has traditionally found limitations as a consequence of the choice of designing turbines with cantilever arrangements. c Département Systèmes Énergétiques et Environnement - IMT Atlantique, 4turbine rue Alfred Kastler, 44300 Nantes, France rotating seal system in contact with the working fluid, a lighter and more compact casing, only one side of the turbine casing 2. The choice of the cantilever arrangement is mainly related to the advantages of having simple shaft bearings design, only one occupiedseal with the bearing and sealing other side freecompact to host the outlet duct for working fluid expanded rotating system in contact with thesystems working(leaving fluid, a the lighter and more turbine casing, only one side of the turbinevapour casing which often veryand large volumetric rates), offree access for the ordinary maintenance. Hence occupied withfeatures the bearing sealing systemsflow (leaving theeasiness other side to host outlet and duct extraordinary for working fluid expanded vapour cantilever arrangement involves definitely lower turbine costs, both in terms of Capex and Opex and is practically the only solution which often features very large volumetric flow rates), easiness of access for ordinary and extraordinary maintenance. Hence Abstract adopted byarrangement the industrial suppliers of ORClower turbines. cantilever involves definitely turbine costs, both in terms of Capex and Opex and is practically the only solution 3. By adopting the cantilever arrangement the installation of several turbine discs hosting expansion stages, traditionally adopted by the industrial suppliers of ORC District heating networks are commonly turbines. addressed in the literature as one of the mostseveral effective solutions for decreasing the installed one close to the other, would increase the overhang mass of require the turbine and decrease the frequencies of the 3.greenhouse By adopting theemissions cantilever arrangement the sector. installation several turbine discsrotor hosting several expansion stages, traditionally gas from the building Theseofsystems high investments which arenatural returned through the heat system, some mechanical problems and, the building end, limiting of heat installing, practically, more than 2-3decrease, stages installed one close tochanged the other,climate would increase theatand overhang mass ofthe thepossibility turbine rotor and decrease the natural frequencies of the sales. yielding Due to the conditions renovation policies, demand in the future could with this kind of arrangement. system, yielding some mechanical prolonging the investment return problems period. and, at the end, limiting the possibility of installing, practically, more than 2-3 stages 4.The Onthis thekind other however, modern ORC require to increase of–stages to better exploitfunction the expansion enthalpy with ofhand, arrangement. main scope of this paper is to assess theturbines feasibility of using the heatnumber demand outdoor temperature for heat demand drop, increase efficiency to allow toto adopt awas lownumber rotating 1,500 rpm) for expansion aisdirect connection 4. On in theorder other however, modern ORCand/or turbines require increase to better exploit the enthalpy forecast. Thetohand, district ofturbine Alvalade, located in Lisbon (Portugal), used asofspeed astages case(even study. The district consisted of 665 with synchronous generator. drop, in order to vary increase turbine efficiency period and/or and to allow to adopt a lowweather rotatingscenarios speed (even 1,500 rpm) for a direct connection buildings that in both construction typology. Three (low, medium, high) and three district 5. The paper scenarios will describe andeveloped innovative(shallow, solution that has allowed to increase the number of stages fromheat the traditional 2-3 towere at with synchronous generator. renovation were intermediate, deep). To estimate the error, obtained demand values least 5 without leaving the effective cantilever arrangement, keeping the concept of ‘rigid’ rotor (i.e. operating below the first 5. The paper will describe an innovative solution that has allowed to increase the number of stages from the traditional 2-3 to at compared with results from a dynamic heat demand model, previously developed and validated by the authors. flexional natural frequency), with very low measured vibrations. least 5 without leaving the effective cantilever arrangement, keeping the concept of ‘rigid’ rotor (i.e. operating below the first The results showed that when only weather change is considered, the margin of error could be acceptable for some applications 6. Operating of a 9demand MW with 5 was stage ORC turbine putfor in all operation 2016 will considered). also be presented. flexional natural frequency), very lowthan measured vibrations. (the error indata annual lower 20% weatherinscenarios However, after introducing renovation

6.scenarios, Operatingthe dataerror of a value 9 MWincreased 5 stage ORC in operation will also be presented. up toturbine 59.5%put (depending on in the2016 weather and renovation scenarios combination considered). ©The 2017value The Authors. Elsevier Ltd. of slope Published coefficientbyincreased on average within the range of 3.8% up to 8% per decade, that corresponds to the © 2017 2017 The The under Authors. Published by by Elsevier Ltd. committee of the IV International Seminar on ORC Power Systems. Peer-review responsibility of Elsevier the scientific © Published Ltd. decrease inAuthors. the number of heating hours of 22-139h during the heating season (depending on the combination of weather and Peer-review under responsibility of the scientific committee of the IV International Seminar on ORC Power Systems. Peer-review responsibility of the of theintercept IV International Seminar on ORC per Power Systems. renovation under scenarios considered). Onscientific the othercommittee hand, function increased for 7.8-12.7% decade (depending on the coupled scenarios). The values suggested could be used to modify the function parameters for the scenarios considered, and improve the accuracy of heat demand estimations. © 2017 The Authors. by355 Elsevier * Corresponding author. Published Tel.: +39 030 2001. Ltd. Peer-review under responsibility of the Scientific Committee of The 15th International Symposium on District Heating and E-mail address: [email protected] * Corresponding author. Tel.: +39 030 355 2001. Cooling.

E-mail address: [email protected] 1876-6102 © 2017 The Authors. Published by Elsevier Ltd. Keywords:under Heat demand; Forecast; Climate change Peer-review responsibility of the scientific committee of the IV International Seminar on ORC Power Systems. 1876-6102 © 2017 The Authors. Published by Elsevier Ltd. Peer-review under responsibility of the scientific committee of the IV International Seminar on ORC Power Systems.

1876-6102 © 2017 The Authors. Published by Elsevier Ltd. Peer-review under responsibility of the Scientific Committee of The 15th International Symposium on District Heating and Cooling.

1876-6102 © 2017 The Authors. Published by Elsevier Ltd. Peer-review under responsibility of the scientific committee of the IV International Seminar on ORC Power Systems. 10.1016/j.egypro.2017.09.138

2

Roberto Bini et al. / Energy Procedia 129 (2017) 1078–1084 Roberto Bini, Davide Colombo / Energy Procedia 00 (2017) 000–000

1079

Keywords: ORC, ORC Turbine, multistage turbine, axial turbine, cantilever turbine

1. Introduction Traditionally, large ORC turbines, in which the rated output is typically exceeding 5MW, have been developed and mainly applied in Geothermal ORC applications where simplicity and long-term reliability have been the typical turbo-expander design drivers rather than the research of a remarkably high turbine efficiency at any cost. Stating this situation, it is known that a typical ORC axial turbine for a geothermal application with organic fluid evaporation temperature in the range of 150°C is normally equipped with 2, 3 or, more rarely, 4 expansion stages. Most of the times these turbine are impulse type, with an average mean diameter in the range of 1 to 1.5 meters and a nominal speed of 1,500/1,800 rpm suitable for a four poles electric generator direct drive. Such a design, due to the limited rotating mass, is typically arranged in a cantilever way, having the turbine shaft supported on one side and the rotating wheels attached on the other side, with evident advantages in terms of cost, serviceability, discharge flow arrangement, single rotating seal, turbine casing design and so on. More recently, the ORC technology has been effectively applied in different applications such as industrial heat recovery, internal combustion engine and gas turbine heat recovery, solar, biomass and others. In this kind of applications, the size of the ORC cycle approaches the size of geothermal ORCs but the temperature of the heat source is often higher than the typical temperature of a geothermal source and thus the enthalpy drop across the expander, which is a function of the thermodynamic cycle temperatures, is generally 2 to 5 times higher than what it is found in geothermal ORC, depending on the actual case. As an example, a geothermal ORC in which Isopentane is utilized as process fluid having an evaporation temperature of 130°C, no superheating and a condensation temperature of 40°C will show across the turbine an isentropic enthalpy drop of 81.5 kJ whereas a heat recovery ORC with Cyclopentane as process fluid, evaporation at 220°C , a superheating of 100°C and the same condensing temperature will show some 230 kJ enthalpy drop. Clearly in the second scenario, the use of a 2 or 3 stages axial expander can adversely affect the efficiency, even when a higher revolution speed is adopted (i.e. 3,000 rpm unit if required in conjunction with a speed reduction gear), due to the possible enthalpy drop overload of each stage and the largely supersonic flow within the turbine blading. In this case, a design with a larger number of stages could result in a better efficiency of the expander. On the other hand, a cantilever design with more than 4 stages can be problematic, for a number of reasons that will be explained; a more complicated and, in turn, more expensive design with double side shaft support and split casing may be considered the only practical solution, with a significant adverse effect in the ORC application profitability. 2. Engineering of a cantilever 5 stage ORC axial expander Normally, in a cantilever axial flow turbine, each subsequent expansion stage is attached to the shaft after the previous one and so not only the rotating mass is increased but also its Center of Gravity (CoG) becomes further and further distant from the shaft bearings and the polar moment of inertia is increasing as well. See Fig. 1. Such a trend results in a progressive reduction of the flexional and torsional frequencies of the shaft with the evident and well known risk of system resonance with high vibration operation and, possibly, mechanical failures. Even with proper selection of the bearings, whether they are oil film type or roller, and shaft diameter, which indeed plays a crucial role in the design, it is really difficult (or even impossible) to shift the natural frequency of the system safely above the rotational frequency and keep the concept of a ‘rigid’ rotor (i.e. with rotating speed below the first flexional natural frequency of the rotor). This situation represents the most common obstacle in increasing the number of expansion stages in a cantilever turbine for ORC applications with a mean diameter in the range of 1.0 to 1.5 meters and a rotational speed of 1,500 to

Roberto Bini et al. / Energy Procedia 129 (2017) 1078–1084 Author name / Energy Procedia 00 (2017) 000–000

1080

3

3,000 rpm which is typically the case of 5 to 10MW high temperature ORC and consequentially represent a serious limitation in the efficiency of the expander in such kind of applications. Rotors assembly

Rotor bearings

CoG

Shaft

d Fig. 1 Typical multi stage cantilever rotor assembly. The rotating mass and the distance “d” of its CoG from the bearing is proportionally increased by the number of expansion stages. Such a design is very prone to resonance problems if the number of stages exceeds 4.

A different and innovative approach in designing the rotor assembly, which is patent pending by Turboden, can limit the negative effect of the large number of stages on the natural frequencies of the shaft, by reducing the amount of rotating mass (and so its polar moment) and the distance of the rotor assembly CoG from the bearing. With this new design, the rotor assembly is attached only once to the shaft, typically at the last or at the secondlast stage level and the rotor discs are connected each other at a large diameter. The amount of rotating mass can be reduced by almost 50% compared to a traditional design with great benefit for the dynamic behavior of the system. The rotor assembly is also shifted toward the shaft bearing so that the CoG distance to the bearing can be considerably reduced, resulting in a further enhancement of the dynamic of the system. Five stages design of this type has been already adopted and tested successfully in a biomass ORC application and the concept will be easily extended to six or more stages in a near future. See Fig. 2. This design can introduce remarkable benefit in the efficiency of high temperature ORCs due to a better expander fluid dynamic compared to 3 or 4 stages turbine of similar size, while keeping all the effectiveness of a cantilever layout. In example, considering the same heat recovery application with the expansion enthalpy drop of 230 kJ mentioned before, a 3 stages turbine will have an average drop of 76.6 kJ per stage, while the 5 stages expander will show an average drop of 46 kJ per stage. If both the turbines are designed with a commonly adopted reaction degree of 0.3 the

4

Roberto Bini et al. / Energy Procedia 129 (2017) 1078–1084 Roberto Bini, Davide Colombo / Energy Procedia 00 (2017) 000–000

1081

average Mach number at the stator nozzles outlet of the first turbine will be approximatively 1.4 while the second turbine will have a Mach number around 1 which evidently represents a benefit in terms of expansion efficiency. Also the rotor cascades will show reduced profile losses due to the lower angular deflection required and the less aggressive volumetric expansion ratios. The new design appears particularly attractive also in terms of Capex since it is relying on the same manufacturing technology as the previous design. Off course, any additional expansion stage introduces its own cost (disc, rings, blades, seals, etc.) but this happens with practical no impact on the cost of the turbine casing and of the spindle assembly. This technology recently received the Mitsubishi Heavy Industry (MHI) “Best Innovations Award 2016”, a Corporate level competition aimed to develop valuable technology within the MHI group. Rotors assembly

Rotor bearings CoG

Shaft

d Fig. 2 Turboden patented design. The rotating mass and the distance “d” of its CoG from the bearing remains under control while increasing the number of expansion stages. Such a design is safe in relations to resonance problems even when the number of stages exceeds 4.

3. A 9MW five stages high temperature example The first unit of a series of turbines adopting this new rotor design is installed on a 9MW biomass fired ORC plant in operation since 2016 in the USA. The actual Campbell diagram of this high temperature turbine (5 stages with nominal speed of 3,000 rpm) is presented in Fig. 3. It can be observed the evident margin against resonance: not only the turbine is normally operated below the first natural frequency but also at 20% overspeed (3,600 rpm) the unit is far from resonance. For comparison, Fig. 4 shows the Campbell diagram of the same 5 stages turbine if the previous design was adopted: resonance occurs around the nominal speed of 3000 rpm which is considered a weak and unsafe design.

1082

Roberto Bini et al. / Energy Procedia 129 (2017) 1078–1084 Author name / Energy Procedia 00 (2017) 000–000

5

Fig. 3 Campbell diagram of a 5 stages 9MW turbine adopting the new design. Resonance occurs well above 3600 rpm while the nominal operation speed is 3000 rpm.

Fig. 4 Campbell diagram of a 5 stages 9MW turbine adopting the traditional design. Resonance occurs around the nominal speed of 3000 rpm.

This unit has been compared in terms of performance efficiency to a 6MW 3 stages unit in operation since 2012 expanding the same fluid at similar thermodynamic conditions. The two turbines share the same mean diameter and the same rotational speed while the blades height differs proportionally to the different power size of the turbines. The total to static efficiency has been calculated at a frequency of 5 minutes over a period of approximatively 2 months of normal operation and it is plotted versus the volumetric expansion ratio. See Fig. 5.

6

Roberto et al. / /Energy Roberto Bini, DavideBini Colombo EnergyProcedia Procedia129 00 (2017) 1078–1084 000–000

1083

Fig. 5 Total to static efficiency vs. Volumetric expansion ratio of a 3 stages turbine (blue dots) and a 5 stages turbine (orange dots) expanding the same fluid. The black lines represents the average efficiency over the considered time period (2 month).

At comparable expansion ratios, the measured efficiency of the 5 stages turbine has been increased by more than 5 percentage points compared to the efficiency of the 3 stages expander. In Fig. 6 a picture of the five stages rotor assembly during machining is also presented.

Fig. 6 Five stage rotor during machining.

1084

Roberto Bini et al. / Energy Procedia 129 (2017) 1078–1084 Author name / Energy Procedia 00 (2017) 000–000

7

4. Technology application to the geothermal ORCs This technology can be effectively applied also to geothermal ORC expanders. Although geothermal sources are typically characterized by lower temperatures compared to heat recovery applications, by employing more than four stages it is sometimes possible to achieve a better fluid dynamic design of the turbine, especially when 1,500 rpm direct drive configuration is adopted. Turboden applied the innovative rotor design to a five stage 16MW axial turbine for a geothermal application with the same expected efficiency improvement of about 5 percentage points compared to similar size 4 stage solution. See Fig 7.

Fig. 7 Five stage 16MW geothermal turbine adopting the new Turboden rotor design.

5. Conclusion Typical cantilever layout is a convenient and effective turbine design widely adopted in ORC powerplants, representing the vast majority of the installed unit worldwide. This kind of design was limiting the number of expansion stages to 3 or 4, mainly due to the rotor-dynamic stability of the system that is adversely affected by the overhung mass proportionally increased by the number of the stages. Large sized heat recovery ORCs and possibly geothermal ORCs could benefit by a larger number of expansion stages in the turbine (i.e. 5 or 6), improving their efficiency. The new Turboden rotor design overcomes this limitation, introducing to the market a new 5 stages axial expanders family targeting both the heat recovery and the high efficiency geothermal ORC market. The first unit of this kind is operation since 2016 showing an efficiency improvement of 5 and more percentage points compared to similar size previous generation units.