Accepted Manuscript Title: Short-term Electricity Load Forecasting of Buildings in Microgrids Author: Hamed Chitsaz Hamid Shaker Hamidreza Zareipour David Wood Nima Amjady PII: DOI: Reference:
S0378-7788(15)00310-2 http://dx.doi.org/doi:10.1016/j.enbuild.2015.04.011 ENB 5803
To appear in:
ENB
Received date: Revised date: Accepted date:
19-12-2014 17-2-2015 10-4-2015
Please cite this article as: Hamed Chitsaz, Hamid Shaker, Hamidreza Zareipour, David Wood, Nima Amjady, Short-term Electricity Load Forecasting of Buildings in Microgrids, Energy & Buildings (2015), http://dx.doi.org/10.1016/j.enbuild.2015.04.011 This is a PDF file of an unedited manuscript that has been accepted for publication. As a service to our customers we are providing this early version of the manuscript. The manuscript will undergo copyediting, typesetting, and review of the resulting proof before it is published in its final form. Please note that during the production process errors may be discovered which could affect the content, and all legal disclaimers that apply to the journal pertain.
*Manuscript
ip t
Short-term Electricity Load Forecasting of Buildings in Microgrids
Schulich School of Engineering, University of Calgary, Alberta, Canada b Electrical Engineering Department, Semnan University, Semnan, Iran
us
a
cr
Hamed Chitsaza,∗, Hamid Shakera , Hamidreza Zareipoura , David Wooda , Nima Amjadyb
an
Abstract
Electricity load forecasting plays a key role in operation of power systems.
M
Since the penetration of distributed and renewable generation is increasingly growing in many countries, Short-Term Load Forecast (STLF) of micro-grids is also
d
becoming an important task. A precise STLF of the micro-grid can enhance the
te
management of its renewable and conventional resources and improve the economics of energy trade with electricity markets. As a consequence of the highly
Ac ce p
non-smooth and volatile behavior of the load time series in a micro-grid, its STLF is even a more complex process than that of a power system. For this purpose, a new prediction method is proposed in this paper, in which a Self-Recurrent Wavelet Neural Network (SRWNN) is applied as the forecast engine. Moreover, the Levenberg-Marquardt (LM) learning algorithm is implemented and adapted to train the SRWNN. In order to demonstrate the efficiency of the proposed method, it is examined on real-world hourly data of an educational building within a microCorresponding Author: Hamed Chitsaz; Email:
[email protected]; Phone: +1 (587) 896-8388; Fax:+1 (403) 282-6855 ∗
Preprint submitted to Elsevier
February 17, 2015
Page 1 of 42
grid. Comparisons with other load prediction methods are provided.
ip t
Keywords: Micro-grids, buildings, electricity load forecasting, self-recurrent wavelet neural network.
cr
1. Introduction
us
Micro-grids are integrated energy systems composed of distributed energy resources and multiple electrical loads operating as an autonomous grid, which can
5
an
be either in parallel to or islanded from the existing power grid. A micro-grid can be considered as a small-scale version of the traditional power grid that its
M
small scale results in far fewer line losses and lower demand on transmission infrastructure. All of these advantages are consequently motivating an increased
d
demand for micro-grids in a variety of application areas such as campus envi-
10
industrial markets [1].
te
ronments, military operations, community/utility systems, and commercial and
Ac ce p
Considering the fast and worldwide development of micro-grids, their optimal
operation requires advanced tools and techniques. In particular, Short-Term Load Forecast (STLF) is an indispensable task for the operation of a micro-grid. In conventional power systems, STLF is an important tool for reliable and economic op-
15
eration of power systems, as many operating decisions, such as dispatch scheduling of generating capacity, demand side management, security assessment and maintenance scheduling of generators, are based on load forecast [2, 3, 4, 5, 6, 7]. Load forecasts also have significant roles in energy transactions, market shares and profits in competitive electricity markets [7, 8]. Different prediction strate-
2
Page 2 of 42
20
gies have already been presented for the STLF of traditional power systems over
ip t
the years. These methodologies are generally divided into two main groups: classical statistical techniques and computational intelligent techniques. Reviews on
cr
some of these strategies can be found in [2, 4, 5, 6, 7, 8].
In a similar way, STLF is a key factor in operation of micro-grids such as energy management for optimal utilization of available resources in order to min-
us
25
imize the operation cost or any environmental impact of a micro-grid [9]. More-
an
over, STLF for a micro-grid can be used for profitable trade of electric energy within the grid. In other words, it is important for the operator of a micro-grid
30
M
to determine the amount of exchanged power with a wholesale energy market so as to maximize the total benefit [10]. It has also been discussed that the fore-
d
casted loads as well as forecasted generation of renewable resources are the main
micro-grids.
te
inputs for optimal energy management [11, 12] and generation scheduling [13] in
35
Ac ce p
However, modeling and forecasting of micro-grids’ loads can be more com-
plex tasks than those usually applied for conventional power systems, as the load
time series of micro-grids is more volatile in comparison with the load of power systems, as demonstrated later in the present paper. Since the size of a micro-grid is considerably small compared to a traditional power system, the load of a microgrid includes more fluctuations. In other words, the inertia in small-scale systems
40
is low and therefore, the smoothness of load time series in such systems degrades. Using a criterion to measure the volatility of a time series, it will be shown in this paper that the volatility of load time series for a micro-grid is considerably 3
Page 3 of 42
higher than that for a conventional power system. As a result, there is a need to
45
ip t
adapt a suitable STLF model to volatile behavior of micro-grids load time series. Despite the importance of STLF for micro-grids there are a few works presented
cr
in this area. Authors in [14] present an on-line learning model based on Multiple Classifier Systems (MCSs) for short-term load forecasting of micro-grids, and the
us
model was tested on real data of a micro-grid. A bi-level prediction strategy is proposed in [15] for STLF in micro-grids. This strategy is composed of a forecaster including neural network and evolutionary algorithm in the lower level and
an
50
an enhanced differential evolution algorithm in the upper level for optimizing the
M
performance of the forecaster. The proposed models in [15] is designed having the aggregated micro-grid load in mind. However, the present paper focuses on
significantly higher volatility compared to the aggregated micro-grid load. Fore-
te
55
d
forecasting the load of the individual loads within a micro-grid, with potentially
casting individual micro-grid load components is important for operation schedul-
Ac ce p
ing and determining load serving priorities at the feeder level [16]. Some research works have also been presented regarding electricity load pre-
diction for residential areas and buildings [17, 18, 19]. The proper consumption
60
of electricity in buildings leads to lower operational costs. If the facility manager could predict the electricity demand of the building, actions could consequently be taken to reduce the amount of energy and therefore, reduce the operational cost of the building [19]. A few works have been published very recently in the area of energy prediction of buildings. For instance, long-term energy consumption of a
65
residential area in South West China has been studied in [20]. In this reference, an 4
Page 4 of 42
Artificial Neural Network (ANN) model is compared with some other prediction
ip t
models, including Grey model, regression model, polynomial model and polynomial regression model, to forecast the total energy consumption of the residential
70
cr
area, and it is shown that ANN model outperforms the other models. Having ac-
cess to detailed data of a six-story multi-family residential building located on
us
the Columbia University campus in New York City, the authors in [21] were able to conduct a comparative spatial analysis to forecast the energy consumptions of
an
units, floors and the whole building for different temporal intervals (e.g., 10-min, hourly and daily). The results indicate that the most effective models are built with hourly consumption at the floor level providing that high resolution and granular
M
75
data is available via advanced smart metering devices. In [22], a Case-Based
d
Reasoning (CBR) model, categorized as a machine-learning artificial intelligence
te
technique, is proposed to forecast energy demand in an office building located in Verennes, Quebec, Canada. Three forecasting horizons of 3-hour, 6-hour and 24-hour ahead have been simulated with hourly prediction resolution, and the re-
Ac ce p
80
sults demonstrate that the prediction capability of the model is improved when the horizon is reduced to 3-hour ahead. Authors in [23] have proposed a new methodology for electrical consumption forecasting based on end-use decomposition and similar days. Total consumption forecast is also obtained from end-use consump-
85
tions and the data of selected days. In [24], a building-level neural network-based
ensemble model is presented for day-ahead electricity load forecasting, and it is shown that the presented model outperforms SARIMA (Seasonal Auto Regressive Moving Average) by up to 50%. However, the comparisons are made only with 5
Page 5 of 42
SARIMA model, which is a linear statistical model, which may not be capable of capturing high nonlinearity of the building-level electricity load.
ip t
90
To summarize the main points, micro-grids can bring considerable benefits to
cr
power systems, such as supplying loads in remote areas, reducing total system expansion planning cost, reducing carbon emission through coordinated utiliza-
95
us
tion of Renewable Energy Sources (RESs), providing cheaper electricity through proper energy management of available resources and energy trade with the main
an
grid, and improving system reliability resiliency by providing dispatchable power for use during peak power conditions or emergency situations. Moreover, it was
M
discussed that short-term load forecasting tool is of high importance in optimal energy management and secure operation of micro-grids. In this way, some research works have been conducted to develop load forecasting models with higher ac-
d
100
te
curacy. However, as discussed above, a few works have focused on day-ahead load consumption prediction of buildings in micro-grids and consequently, im-
Ac ce p
provement of forecast accuracy is still needed in this area. In the present paper, a forecast method is proposed for the STLF of micro-grids with the focus of elec-
105
tricity load prediction for individual buildings. The main contribution of this paper is applying a Self-Recurrent Wavelet Neural Network (SRWNN) forecasting engine for electricity load prediction of micro-grids. Moreover, the LevenbergMarquardt (LM) learning algorithm is implemented to train the SRWNN. The proposed method improves the forecast accuracy for highly volatile and non-smooth
110
time series of micro-grid electricity load. The higher the forecast accuracy of electricity load, the more efficient energy management can be achieved in a micro6
Page 6 of 42
grid.
ip t
The remaining parts of the paper are organized as follows. Section 2 provides a data analysis on different electricity load time series to draw a distinction be-
tween the load of a micro-grid and a power system. The proposed forecasting
cr
115
method consists of the SRWNN as the forecasting engine and LM as the training
us
algorithm, and is presented in Section 3. The proposed load forecasting method is tested on real-world test cases and the results are compared with the results of
paper.
M
120
an
some other prediction approaches in Section 4. Finally, Section 5 concludes the
2. Data analysis
d
A data analysis is presented in this section so as to compare the characteristics
te
of a micro-grid load time series and electricity load in power systems. The British
125
Ac ce p
Columbia Institute of Technology (BCIT) in Vancouver, the Province of British Columbia (BC), Canada, is considered as the micro-grid test case studied in this paper. BCIT’s Burnaby campus is Canada’s first Smart Power Micro-grid comprised of power plants (including renewable resources of wind and photovoltaic modules), campus loads, command and control (including substation automation, micro-grid control center and distributed energy management), and communica-
130
tion network [25]. The load data used in this work is from one building with a peak value of 694 kW from March 2012 to March 2013, within the BCIT microgrid. Hereafter, we refer to this load as BCIT. To draw a comparison between the characteristics of a micro-grid load and power system load level, the load time 7
Page 7 of 42
Table 1: Comparison of electricity load time series in terms of volatility.
Daily volatility (%) Weekly volatility (%)
8.34 7.09
British Columbia’s California’s System Load System Load 2.66 3.18 2.28 3.15
ip t
BCIT
cr
Volatility index
series of two power systems, i.e., British Columbia where BCIT micro-grid is located, and California, are analyzed.
us
135
Electricity load follows daily and weekly periodicities. In this way, we con-
an
sider two measures for volatility analysis, i.e., daily volatility and weekly volatility. These measures are based on the standard deviation of logarithmic returns
140
M
over a time window. In general, daily volatility quantifies the overall change in hourly electricity load from one day to another, and weekly volatility measures
te
volatility indices, see [26].
d
the load changes in subsequent weeks. For more details regarding aforementioned
One year hourly load data has been considered for British Columbia’s and
145
Ac ce p
California’s power systems for the same period, i.e., from March 2012 to March 2013. Observe from Table 1 that both daily and weekly volatility indices for a micro-grid are considerably higher than those for power systems, which demonstrate low smoothness of micro-grid load time series. For instance, daily volatility related to the micro-grid is 8.34%, while it is respectively 2.66% and 3.18% for British Columbia’s and California’s power systems. It means that electricity
150
load of the micro-grid fluctuates more severely from one day to another compared with that of power systems. Likewise, weekly fluctuations are more severe in the micro-grid than those in a power system. As a result, daily and weekly periodic8
Page 8 of 42
ip t cr us
(a) BC’s power system electricity load
(b) Building electricity load in BCIT
an
Figure 1: One-year hourly load data of BC’s power system and the building in BCIT
M
ities of electricity load in a micro-grid are noticeably low, and consequently, the predictability of such load time series decreases. Fig. 1 illustrates one-year hourly load data of British Columbia’s power sys-
d
155
te
tem and that of the building in BCIT. It is noted that the data is normalized to the maximum value. As seen, the aggregated electricity load in a large area (e.g.,
Ac ce p
the province of British Columbia) is noticeably different from the aggregated load in a building. For instance, British Columbia’s load follows a common seasonal
160
pattern, as the load decreases in the spring in April and starts to increase in the fall
in October. The building’s load follows a fairly similar seasonal pattern. From the beginning of the academic year in september, electricity load starts increasing, and it starts decreasing in February. Moreover, it is evidently shown that fluctuations of load are more severe for a building compared with those for a power system.
165
These variations in load time series of the micro-grid graphically demonstrate its volatility previously shown in Table 1 by volatility indices.
9
Page 9 of 42
BC power system Building in BCIT
ip t
1500
500 0 −20
−15
−10
0 5 % of the peak load
−5
10
cr
1000
15
us
Number of occurrences
(a) 1−hour ramp distribution 2000
20
25
an
900
M
600 300 0 −20
−15
−10
−5
0 5 % of the peak load
10
15
BC power system Building in BCIT
20
25
d
Number of occurrences
(b) 2−hour ramp distribution 1200
te
Figure 2: Distribution of 1-hour and 2-hour ramps
Ac ce p
To have a better understanding of such severe load fluctuations for a build-
ing, hourly changes of load, i.e., the difference between the two observations at subsequent hours so-called 1-hour ramps, can be taken into consideration. Fig. 2
170
(a) shows the distribution (with equally spaced bins of 1% of the peak load) of 1-hour ramps for both the building in BCIT and BC’s power system loads. Note that the negative values show downward ramps. As seen, more frequent hourly upward and downward ramps have been occurred in the building in BCIT with the amplitude of more than 5% of the peak load. The most severe ramp happened
175
in BC’s power system load is a ramp up with the amplitude of almost 9% of the
10
Page 10 of 42
Table 2: Ramp events in electricity load time series
1-hour 2-hour Building BC power Building BC power (% of the peak load) in BCIT system in BCIT system 5% ≤ RU < 10% 556 504 818 971 10% ≤ RU < 15% 84 0 362 352 Ramp Up 15% ≤ RU < 20% 12 0 121 55 (RU) RU > 20% 4 0 21 0 5% ≤ RD < 10% 520 259 1003 1272 10% ≤ RD < 15% 48 0 283 141 Ramp Down 15% ≤ RD < 20% 9 0 57 0 (RD) RD > 20% 0 0 11 0
an
us
cr
ip t
Interval
peak load, while it is a ramp up with more than 20% of the peak load for the
M
building. Similarly, Fig. 2 (b) illustrates the distribution for 2-hour ramps, i.e., load variations in two-hour durations. As the longer time is considered for ramps,
180
d
the larger ramps will be detected. Obviously, sharp upward and downward ramps have more frequently happened in BCIT building load than in BC system load.
te
To provide more detailed statistics of ramps, table 2 shows the number of
Ac ce p
upward and downward ramps for 1-hour and 2-hour durations. For instance, there have been 100 upward ramps more than 10% of the peak load in BCIT building load, while no 1-hour ramp up has occurred with the amplitude of more than 10%
185
of the peak load in BC system load. With regard to 2-hour ramp up, there have
been 55 2-hour ramp ups more than 15% of the peak load occurred in BC, while it has been 142 ones for BCIT load. This table also demonstrates that the number of downward ramps are fewer than the number of upward ramps when large ramps are concerned.
190
Based on the above descriptions, prediction of electricity load time series of a
11
Page 11 of 42
building seems to be more difficult than that of a power system since high volatil-
ip t
ity lowers the predictability. Consequently, it is required to adapt a forecasting model so as to cope with the challenging characteristics of such time series. In the
behaviour of micro-grid time series.
us
195
cr
next section, a forecasting model is proposed to capture the dynamic and volatile
3. The forecasting model
an
The discussion in section 2 showed that dealing with micro-grid load time series is a more challenging task compared with a power system, and therefore,
200
M
traditional STLF will not result in satisfactory accuracy in micro-grid load prediction. In this way, the SRWNN forecasting engine is firstly presented in this
te
of the SRWNN.
d
section and the training algorithm is then implemented to set the free parameters
Ac ce p
3.1. Self-Recurrent Wavelet Neural Network The wavelet theory has been applied through two different approaches for
205
forecast processes. The first one is using the wavelet transform as a preprocessor to compose the load time series into its low and high frequency components. Each component is separately processed by a forecast engine [27]. The other approach is constructing the wavelet neural network (WNN) in which a wavelet function is used as the activation function of the hidden neurons of a Feed-Forward Neu-
210
ral Network (FFNN). The WNN was first introduced in [28] for approximating nonlinear functions. Due to the local properties of wavelets and the concept of
12
Page 12 of 42
adapting the wavelet shape according to training data set instead of adapting the
ip t
parameters of the fixed shape basis function, WNNs have better generalization property compared to the classical FFNNs, and therefore, these are more appropriate for the modelling of time series [29].
cr
215
The SRWNN is a modified model of WNN including the properties of the dy-
us
namics of Recurrent Neural Networks (RNNs) [30] and the fast convergence of WNNs, which has successfully been applied to estimating and controlling nonlin-
220
an
ear systems [31]. Since the SRWNN has a self-recurrent mother wavelet layer, it can store the past information of wavelets and well attract the complex nonlinear
M
systems [32]. Having self-feedback loops and input direct terms, SRWNN has improved capabilities compared to WNN, such as its dynamic response and infor-
d
mation storing ability. Therefore, SRWNN has been applied as a forecast engine
225
te
in this paper to overcome the volatile and non-smooth behavior of the load time series in a micro-grid. Moreover, SRWNN does not include limitations, such as
Ac ce p
dependency on appropriate tuning of parameters and complex optimization process, which are likely to be found in models such as Support Vector Machines (SVMs) [33].
The architecture of the SRWNN is shown in Fig. 3, which is a feed forward
230
network with four layers. As seen, X = [x1 , ..., xM ] is the input vector of the forecast engine and y is the target variable. The inputs x1 , ..., xM of the forecast
engine can be from the past values of the target variable and past and forecast values of the related exogenous variables. For instance, past values of electricity load along with the past and forecast values of temperature can be considered for 13
Page 13 of 42
235
electricity load prediction, provided that their data is available.
ip t
A feature selection technique can be used to refine these candidate features and select the most effective inputs for the forecast process. In this research work,
cr
we use the feature selection method of [34]. This method is based on the infor-
mation theoretic criterion of mutual information and selects the most informative inputs for the forecast process by filtering out the irrelevant and redundant can-
us
240
didate features through two stages. In the first stage, which is called irrelevancy
an
filter, mutual information between each candidate input, i.e. xi (t), and the target variable is calculated. The higher value of mutual information for xi (t) means
245
M
the more common information content of this feature with the target variable. The candidate inputs with computed mutual information value greater than a relevancy
d
threshold, denoted by T H1 , are considered as the relevant features of the forecast
te
process, which are retained for the next stage. However, other candidate inputs with mutual information value lower than T H1 are considered as irrelevant fea-
250
Ac ce p
tures, which are filtered out. In the second stage, which is called redundancy filter, redundant features among the candidate inputs secected by the relevancy filter are found and filtered out. Two selected candidates, e.g., xk (t) and xl (t), with high value of mutual information have more common information, i.e., high level of redundancy. Thus, the redundancy of each selected feature xk (t) with the other
candidate inputs is calculated. Then, if the measured redundancy becomes greater
255
than a redundancy threshold, denoted by T H2 , xk (t) is considered as a redundant candidate input. Hence, between this candidate and its rival, which has the maximum redundancy with xk (t), one with lower relevancy should be filtered out [34]. 14
Page 14 of 42
ip t cr us an
M
Figure 3: Architecture of the SRWNN.
The selected candidate features in relevancy filter are considered as the inputs of
T H1 and T H2 is performed by cross validation technique. Since this method is
te
260
d
the load forecasting engine. Moreover, fine-tuning the values of the thresholds
Ac ce p
not the focus of this paper, it is not further discussed here. The interested reader can refer to [34] for details of this feature selection method. Therefore, the target variable is the electricity load of the next time interval
that the forecasting engine presents a prediction for it using the past values of
265
electricity load and calendar effects. Moreover, Multi-period forecast, e.g. load
prediction for the next 24 hours, is reached via recursion, i.e. by feeding input variables with the forecaster’s outputs. For instance, forecasted load for the first hour is used as y(t−1) for load prediction of the second hour provided that y(t−1) is among the selected candidate inputs of the feature selection technique.
270
The input layer of the forecast engine transmits M input variables, which are 15
Page 15 of 42
selected by the feature selection technique, to the next layer without any changes.
ip t
The second layer, which is called the wavelet layer, consists of N × M neurons that each has a self-feedback loop. In this paper, Morlet wavelet function has
which is defined as follows: 2
us
275
cr
been considered as the activation function of neurons in the mother-wavelet layer,
an
ψ(x) = e−0.5x cos(5x)
(1)
In SRWNN, a wavelet of each node is derived from its mother wavelet as below: ui,j − bi ), ai
M
ψi,j (ri,j ) = ψ(
ri,j =
ui,j − bi ai
(2)
d
where ψi,j is the scaled and shifted version of Morlet mother wavelet with ai and
te
bi as the scale and shift parameters, respectively. In addition, the inputs of the
Ac ce p
wavelets in (2) are as follows:
ui,j = xj + ψi,j z −1 · θi,j
280
(3)
where z −1 is the time delay; thus, the input of this layer contains the memory term ψi,j z −1 which can store the past information of networks, and θi,j denotes the weight of the self-feedback loop, which represents the rate of information storage. This feature is the main difference between a SRWNN and a WNN. In
fact, the SRWNN is the same as WNN when all θi,j are equal to zero. However, 285
it is noted that the initial values for θi,j are usually considered zero, which means 16
Page 16 of 42
there are no feedback units initially.
ip t
M-dimensional wavelet functions are constructed by the tensor product of one-
Ψi =
M Y
cr
dimensional Morlet wavelets in the third layer as follows:
ψi,j ,
i = 1, 2, ..., N
us
j=1
(4)
y=
N X
w i · Ψi +
290
M X
vj · xj + g
(5)
j=1
M
i=1
an
The output of the SRWNN, denoted by y, is finally computed as below:
where, wi is the weight between ith neuron of the product layer and the output
d
node, vj is the direct input weight between j th input and the output node, and
te
g is the bias of the output node. Therefore, the output of SRWNN is obtained by a combination of multi-dimensional wavelet functions, i.e. Ψi , as well as a
295
Ac ce p
combination of inputs, i.e. xj . In other words, the proposed model not only can benefit from the capabilities of wavelet functions, such as their ability to capture cyclical behaviors, but also can capture trends of the signal. In addition, SRWNN can benefit from its dynamic response by storing the past information of wavelets in self-feedback loops (equation 3) to capture complex nonlinearities. Based on the aforementioned formulation, the vector of the free parameters of the SRWNN
300
is denoted by P as follows:
P = [vj , wi , ai , bi , θi,j , g], i = 1, ..., N, j = 1, ..., M
(6)
17
Page 17 of 42
Therefore, the SRWNN has NP = M + 3N + M × N + 1 free parameters
ip t
which are determined by the training method. It should also be noted that the SRWNN model presented in this paper differs from the SRWNN proposed in [32].
305
cr
There are two differences between these two models. First, there is an additional external bias (e.g., g) to the output layer of the presented SRWNN in this work.
us
A bias can increase or lower the net input of the activation function, depending on whether it is positive or negative, respectively [35]. Consequently, biases can
an
enhance the input/output mapping function by adding another feature to neural networks. Second, Morlet wavelet functions have been used as the activation functions in Wavelet layer of SRWNN in this paper, while the second derivative
M
310
of Gaussian functions, i.e., Mexican hat wavelet function, in reference [32] of
d
the previous version. Although Mexican hat wavelet function has successfully
te
been used in WNN model for forecasting applications due to its superiorities over Daubechies wavelets [29], it has been shown that Morlet wavelets outperform Mexican hat wavelets for prediction applications [36, 37]. Therefore, we applied
Ac ce p
315
Morlet mother wavelets as the activation functions in SRWNN in our paper. 3.2. The training algorithm
In this subsection, a training algorithm is implemented to set the free parame-
ters of the SRWNN denoted by P in (6). Since the mother wavelet function used
320
in the SRWNN, i.e. Morlet wavelet function, is differentiable with respect to all free parameters, the Levenberg-Marquardt (LM) learning algorithm can be used in this regards. This learning algorithm was applied to train the neural networks
18
Page 18 of 42
by Hagan and Menhaj in [38]. Due to the advantages of the LM algorithm, such as
325
ip t
accurate training and fast convergence, it has been recommended in many research works, and therefore, it is implemented for training the SRWNN in this paper. The
cr
LM algorithm is briefly described in the Appendix and its implementation on the SRWNN is then presented.
us
Moreover, the termination criterion used for the training of the SRWNN is based on early-stopping technique. Accordingly, the whole available data is divided into training and validation samples. The SRWNN is trained using the train-
an
330
ing samples and the error for validation samples is monitored in each iteration. As
M
the validation error begins to rise during some number of iterations, usually five, the training phase is stopped and the values of the free parameters relating to the
ing algorithm.
Ac ce p
4. Numerical results
te
335
d
iteration with the least validation error are stored as the final solution of the train-
In this paper, we mainly focus on 24-hour ahead load prediction with hourly
forecast steps. Day-ahead load forecasting can bring significant operational advantages for energy management of micro-grids. For instance, BCIT micro-grid
340
consists of different types of generating units (e.g., thermal, wind and PV units),
and day-ahead load predictions are used for energy management purposes. In other words, optimal utilization of available resources is achieved using load forecasting in order to minimize the operation cost for BCIT campus micro-grid. Moreover, as this micro-grid can operate in both stand alone and grid-connected 19
Page 19 of 42
345
modes, accurate load forecast can be used for profitable trade of electric energy
ip t
within the British Columbia power system. The same load time series data of the building in BCIT and two power systems
cr
are used for numerical experiments of this section. Based on the data analyses
presented in section 2, electricity load not only depends on the load profile of the previous day, i.e., daily periodicity, but also the load pattern of the previous week,
us
350
i.e., weekly periodicity. To capture such patterns, 192 candidate inputs has been
an
considered as lagged hourly load data, i.e., {Lt−192 , ..., Lt−1 } where Lt indicates the electricity load at time t. The feature selection technique selects the most in-
355
M
formative lagged load values from these candidate inputs. Calendar information is also highly important for a load forecasting model so as to capture weekly and
d
seasonal patterns. For instance, either considering the day of the week or differ-
te
entiating weekends and weekdays is a common way presented in the literature [5, 9, 39]. Thus, weekends and holidays are considered in this work using a bi-
360
Ac ce p
nary variable for detecting weekends and holidays from weekdays. The month of the year is also used in some cases [39]; however, it is not considered in this
paper since the seasonality factor is already captured, as the model is re-trained
every day. Furthermore, temperature data as an exogenous variable has been used to improve load forecasting prediction since temperature time series usually has high relevancy to electricity consumption time series [5, 7, 8, 40]. Accordingly,
365
based on publicly available data, seven daily values of temperature for the previous week (e.g., Td−7 , ..., Td−1 ), and the daily forecast value of the temperature for the prediction day (e.g., Td ) were first considered for the model, where Td repre20
Page 20 of 42
sents the average daily temperature for day d. However, numerical experiments
370
ip t
for BCIT test case revealed that low resolution temperature data, i.e. daily data, cannot improve the accuracy for hourly load forecast. Therefore, we tested histor-
cr
ical hourly temperature data (located in Vancouver) and also used the same time series for temperature forecasts, i.e., perfect forecasts, in order to observe if hourly
us
temperature data can enhance the forecast results for BCIT test case. For this purpose, lagged hourly temperature data, i.e., {Tt−192 , ..., Tt−1 }, are considered as 192 candidate inputs that feed the feature selection stage along with 192 candi-
an
375
date inputs for load data. The feature selection technique then selects the most
M
informative candidates among all candidates of load and temperature and transfer them to the model. Considering the selected inputs, few temperature inputs are
series and load time series of BCIT. The low correlation results from the fact that
te
380
d
among all selected inputs that shows the low correlation of the temperature time
the electric load of this building is mainly lighting load. Considering the mild
Ac ce p
temperatures in Vancouver, the heating load is not as significant. The numerical results also supported this low correlation, as hourly temperature data with even perfect forecasts could not improve the forecast accuracy of the model. Therefore,
385
temperature inputs are not considered for the numerical results in this paper. To show the effectiveness of different forecasting engines, SRWNN is com-
pared with two other efficient neural network-based forecasting models, i.e., WNN and Multi-Layer Perceptron (MLP). It is noted that statistical models (e.g., Autoregressive Integrated Moving Average (ARIMA) model) are not considered in
390
this paper since such techniques are basically linear methods and have limited ca21
Page 21 of 42
pability to capture nonlinearities in the load series [41, 42]. Therefore, we chose
ip t
two efficient Computational Intelligence (CI) based models, e.g., MLP as an efficient Feed Forward Neural Network (FFNN) and WNN as an effective model
395
cr
combining nonlinear mapping merits of FNNNs and wavelet functions, as benchmarks in our comparative results.
us
Hence, 10 test months of hourly load data from the building in BCIT from May 2012 to February 2013 are considered for 24-hour ahead load prediction.
an
It is noted that the first two months of the historical data is used for training of the forecast engine and so the results of the first two months cannot be presented here. Two error criteria are used in this paper to evaluate forecast errors: (i)
M
400
normalized Root Mean Square Error (nRMSE) and (ii) normalized Mean Absolute
d
Error (nMAE), defined as follows:
Ac ce p
te
v u N u 1 X LACT(t) − LFOR(t) nRMSE = t ( )2 × 100 N t=1 LPeak
(7)
N
1 X LACT(t) − LFOR(t) | | × 100 nMAE = N t=1 LPeak
(8)
where LACT(t) and LFOR(t) indicate the actual and forecast values of electricity
405
load for hour t. Moreover, N indicates number of hours for each month, and LPeak is the peak value of the electricity load over the year, which is 694 kW for this test case. Observe from Table 3 that SRWNN outperforms the other forecasting models in all test months and in terms of both nRMSE and nMAE. For instance, the 22
Page 22 of 42
Table 3: Forecasting errors, in %, of SRWNN, WNN and MLP for 10 test months.
ip t
cr
us
an
M
Month May Jun. Jul. Aug. Sep. Oct. Nov. Dec. Jan. Feb. Average
MLP WNN SRWNN nRMSE nMAE nRMSE nMAE nRMSE nMAE 8.44 6.22 5.96 4.05 5.23 3.80 9.92 7.55 5.44 4.27 4.86 3.80 10.41 7.92 7.04 5.26 5.43 4.01 10.40 8.14 6.57 4.95 6.46 4.80 11.88 8.40 7.83 6.01 6.28 4.82 10.45 7.68 4.81 3.83 4.24 3.28 6.34 4.89 4.62 3.56 4.30 3.21 6.21 4.58 4.54 3.35 4.22 3.05 6.93 4.74 4.86 3.40 4.25 3.11 6.85 5.29 5.06 3.94 4.58 3.50 8.78% 6.54% 5.67% 4.26% 4.98% 3.74%
average nRMSE and average nMAE of SRWNN are (5.67-4.98)/5.67=12.1% and 410
(4.26-3.74)/4.26=12.2% lower than those of WNN, and (8.78-4.98)/8.78=43.2%
d
and (6.54-3.74)/6.54=42.8% lower than those for MLP, respectively. This table
te
demonstrates that for a highly volatile time series, i.e. micro-grid electricity load,
Ac ce p
a SRWNN forecasting model can more efficiently cope with the variations and non-smooth behavior of the time series.
415
Moreover, Fig. 4 illustrates the carpet charts of monthly mean absolute errors
for different hours of the day for SRWNN and WNN on BCIT test case. This figure clearly shows that large errors for both models usually occur between 12:00 PM and 16:00 PM when the load peaks. However, this colormap shows lower errors during the peak hours for SRWNN in comparison with the WNN. More
420
importantly, the superiority of SRWNN over WNN is revealed during the upward ramps in the morning. As analyzed in section 2, sharp upward ramps occur more
23
Page 23 of 42
ip t cr us (b) WNN
an
(a) SRWNN
Figure 4: Mean absolute error (kW) of different hours of the day in different months 45
M
35
30
25
d
20
15
10
2
3
4
5
6
7
8
9
10
11
12
SRWNN WNN
13
14
15
16
17
18
19
20
21
22
23
24
Hour
Ac ce p
5 1
te
Mean Absolute Error (kW)
40
Figure 5: 10-month mean absolute error for different hours of the day
than downward ramps for BCIT test case, and consequently, any improvements in forecasting ramp up events can considerably enhance the forecast accuracy of this load time series. Fig. 5 demonstrates the average of mean absolute errors for all
425
10 months. According to these two curves, SRWNN shows lower yearly errors during the morning ramp, which usually occurs from 7:00 AM to 12:00 PM. In addition, there is an improvement in ramp down forecasting from 16:00 PM to 18:00 PM. 24
Page 24 of 42
Curves of generated forecasts and real data for a good forecasting day, i.e. November 15, and a bad forecasting day, i.e. September 7, is demonstrated in
ip t
430
Fig. 6. Fig. 6(a) shows that there are sharp changes and variations on Septem-
cr
ber 7. Sharp spikes could result from the high temperatures during specific days,
which increase the electricity consumption of the buildings for air conditioning.
435
us
As a consequence of such severe ramps, the forecasting model faces difficulties to capture this high sudden variations in electricity load. The major error is the
an
magnitude error occurred during the peak load. On the contrary, there has been smoother variations on November 15 shown in Fig. 6(b), so the forecasting model
M
could perfectly capture the upward ramp. As a result, the challenge of high volatility and sharp ramps in micro-grid time series is evidently distinct from power system loads, and makes such time series more unpredictable.
d
440
te
In the next experiment, forecasting errors of different days of the week for the same 10-month period are separately considered to observe the users’ behavior.
Ac ce p
It is noted that the electricity consumption of the building is mainly from lightings as mentioned earlier in this section. Here, users’ behavior is represented by
445
considering the calendar effect as the inputs of the model. A binary variable for differentiating weekends and holidays from weekdays is used, i.e., zero represents
weekends and holidays, while one represents weekdays. Fig. 7 demonstrates the forecasting errors with and without the calendar effects. First, observe that the average of nRMSE considering the calendar effect, i.e., 4.78%, is lower than that
450
when the calendar effect is not included, i.e., 5.32%. Moreover, according to the figure, the highest error occurs on Mondays, which is the first working day at the 25
Page 25 of 42
ip t cr us an M
(a) Bad forecasting day
(b) Good forecasting day
d
Figure 6: Samples for bad (a) and good (b) forecasting days
te
university. Calendar inputs can efficiently capture such behaviors of the users. For instance, the forecasting error in terms of nRMSE corresponds to Monday has
455
Ac ce p
considerably decreased from 7.32% to 5.83% when the calendar effect is taken into account. In addition, the standard deviation of the error associated with different days of week has decreased from 0.97% to 0.57% using the calendar effect. In other words, the model performs in a more robust way for predicting different days of the week. According to Fig. 7, the difference between the maximum and the minimum errors with calendar, i.e., 1.85%, and without calendar, i.e., 2.83%,
460
can also show the better performance of the model including the calendar effect. As a result, users’ behavior can efficiently be captured by considering calendar effects in order to improve the forecast accuracy.
26
Page 26 of 42
ip t cr us an
M
Figure 7: Forecasting errors for different days of the week
In the last experiment, the proposed forecasting model is applied to predict two
how forecast accuracy of SRWNN improves, compared with WNN, as the volatil-
te
465
d
power system time series. The main goal of this numerical experiment is to show
Ac ce p
ity of the time series increases. Hence, from a power system with low volatility to one with higher volatility, forecast accuracy improvements increase for SRWNN. In this way, the same test cases for British Columbia’s and California’s power systems are considered. Table 4 shows the obtained forecast error results (based on
470
the average of 10-month error) for both SRWNN and WNN models. Firstly, this table demonstrates noticeable lower forecast errors of both models for prediction of power systems’ load data compared with those for a micro-grid illustrated in Table 3. For instance, 4.98% compared with 2.29% in terms of nRMSE for the micro-grid and British Columbia’s power system, respectively. Besides, observed
475
from Table 1, the volatility for British Columbia’s power system time series is 27
Page 27 of 42
Table 4: Forecasting errors of SRWNN and WNN for two power systems.
cr
ip t
WNN SRWNN Improvements(%) Power System nRMSE nMAE nRMSE nMAE nRMSE nMAE British Columbia 2.46 1.81 2.29 1.69 6.9 6.6 California 3.67 2.57 3.38 2.37 7.9 7.8
the lowest in terms of both daily and weekly volatility indices. Consequently,
us
it is expected to have higher predictability for British Columbia’s power system compared to the micro-grid and California’s power system. Table 4 statistically
480
an
supports that the forecasting errors for British Columbia is lower than those for California, e.g., 2.46% compared to 3.67% in terms of nRMSE for WNN.
M
Secondly, Table 4 shows how effective the SRWNN becomes as the volatility of a time series increases. As seen from the last column of Table 4, the forecast ac-
d
curacy improvements obtained from SRWNN in terms of nRMSE and nMAE are
485
te
respectively (2.46-2.29)/2.46=6.9% and (1.81-1.69)/1.81=6.6% for BC’s power system. Similarly, there are 7.9% and 7.8% forecast accuracy improvements in
Ac ce p
terms of nRMSE and nMAE for California’s power system, respectively. Therefore, since the volatility of California’s power system is higher than that for British Columbia’s, SRWNN obtained higher improvement of forecast accuracy compared with WNN for California’s power system. In other words, California’s load
490
contains higher daily and weekly volatilities, and consequently, the SRWNN can capture these variations and present more accurate forecast results compared with WNN. To have a better sense of these percentage errors, forecast accuracy improvement in terms of mean absolute error is around 93 MW, which is almost twice as big as the capacity of Kumeyaay wind farm, i.e. 50 MW, located in San
28
Page 28 of 42
495
Diego, California [43]. As a result, it shows as the volatility of the time series
ip t
increases, the performance of SRWNN improves in comparison with WNN. As mentioned earlier in this section, load forecast accuracy can be improved using
cr
weather forecast data as exogenous inputs to the forecasting model. For instance, load forecasting models utilized in California ISO (CAISO) include weather fore-
casts, such as temperature, dew point, wind speed and cloud cover, for next 9 days
us
500
for 24 weather stations [44]. It is noted that including such exogenous inputs to
an
the model depends on the availability of the public data.
The computation time of the SRWNN model for the training phase is less
505
M
than 35 seconds for one day prediction for the test cases of this paper, which is measured on a hardware set of Mac Intel Core i5 2.7 GHz with 12 GB RAM.
d
Although this computation time is larger than that for WNN, i.e., less than 11
te
seconds, it is completely acceptable within a 24-hour decision making framework,
Ac ce p
and shows fast forecasting performance of the proposed method.
5. Conclusions
510
STLF is an important tool for reliable and economic operation of power sys-
tems as many operating decisions are based on load forecast, e.g., dispatch schedul-
ing of generating units, security assessment and demand side management. Likewise, precise STLF for a micro-grid can enhance the management of its renewable and conventional resources and improve the economics of energy trade with elec-
515
tricity markets. Considering volatile and non-smooth characteristics of load time series of micro-grids compared with power systems’ electricity load, a new fore29
Page 29 of 42
casting method is proposed to deal with such challenges in this paper. The pro-
ip t
posed method has the structure of a SRWNN as the forecasting engine, in which feedback loops have been added to a WNN so as to better capture nonlinear complexities of volatile time series. LM learning algorithm is implemented to train
cr
520
the SRWNN, i.e., adjusting the free parameters of the SRWNN. High volatility of
us
a micro-grid load was shown by defining a volatility criterion and comparing with the volatility of two power systems’ load data. The effectiveness of the proposed
525
an
forecasting method was demonstrated by real-world load data of a micro-grid and power systems. The results show that the proposed SRWNN model leads to more
M
accurate forecasts when a volatile time series prediction is of interest.
d
Appendix: Formulation of the training algorithm
te
The task of the forecasting engines is to learn the mapping function between
530
Ac ce p
a specified set of input/output pairs {(X1 , t1 ), (X2 , t2 ), ..., (XQ , tQ )}, known as training samples. Q indicates the number of training samples. Xq and tq are the q th input vector and the corresponding target output of the forecasting model, respectively. Mean squared error (MSE) is usually considered to be the performance index for the network. The MSE is calculated by Q
1 X 2 MSE = e, Q q=1 q
(eq = tq − yq )
(A.1)
where, yq is the output of the forecasting engine when Xq is fed as the input of the 535
forecasting engine. eq is the forecast error of the q th sample. 30
Page 30 of 42
The LM algorithm is an approximation of Newton’s method, in which the
(A.2)
cr
Pk+1 = Pk − (J ⊺ J + µI)−1 J ⊺ e
ip t
solution is updated as follows:
us
where P is the vector of the free parameters according to (6). k represents the iteration number, and I is the identity matrix. J is the Jacobian matrix composed of the first derivatives of the network errors with respect to all its free parameters
an
540
and J ⊺ J is the Hessian matrix. Considering (A.1) as the performance function
M
that should be minimized, the gradient of (A.1) can be shown as J ⊺ e. The main modification of the LM algorithm with respect to Newton’s method
zero in (A.2). When µ is large, the LM algorithm tends to gradient descent with a
te
545
d
is the parameter µ, such that the algorithm becomes the Newton’s method if µ is
small step size, i.e., (1/µ), while for small µ the LM algorithm tends to Newton’s
Ac ce p
method. Since the Newton’s method is faster and more accurate than the gradient descent, the aim is to shift toward Newton’s method as quickly as possible. Thus, µ is divided by a factor β (β > 1) after each successful step, i.e. reduction in
550
the MSE given in (A.1). On the contrary, µ is multiplied by the factor β when a tentative step increases the MSE. Therefore, the MSE is always reduced at each iteration of the algorithm [38]. The initial value for µ is usually considered 0.01
and β is usually set as 10. For further details regarding the LM training algorithm, the interested reader can refer to [38]. The implementation of the LM learning 555
algorithm on the SRWNN is proposed in the following.
31
Page 31 of 42
Since computation of the Jacobian matrix is the most important part of the LM
ip t
algorithm, it is required to determine the first derivative of the network errors with respect to each free parameter of (6) in the SRWNN, i.e., vj , wi , ai , bi , θi,j , and g.
(A.3)
i = 1, 2, ..., N
(A.4)
us
j = 1, 2, ..., M
an
∂(t − y) ∂e = = −xj , ∂vj ∂vj ∂e ∂(t − y) = = −Ψi , ∂wi ∂wi ∂(t − y) ∂Ψi ∂e = = −wi · , ∂ai ∂ai ∂ai
cr
The elements in the Jacobian matrix are calculated by the following equations.
M
560
i = 1, 2, ..., N
" # M M ∂Ψi X dψi,j Y ψ(ri,l ) , = · ∂ai dai j=1
(A.5)
(A.6)
d
l=1,l6=j
−ri,j dψi,j = · ψ ′ (ri,j ), dai ai
te
(A.7)
Ac ce p
where ψ ′ (.) is the derivative of the Morlet mother wavelet function. ∂e ∂(t − y) ∂Ψi = = −wi · , ∂bi ∂bi ∂bi
" # M M ∂Ψi X dψi,j Y = · ψ(ri,l ) , ∂bi dbi l=1,l6=j j=1
−1 dψi,j = · ψ ′ (ri,j ), dbi ai
i = 1, 2, ..., N
(A.8)
(A.9) (A.10)
32
Page 32 of 42
i = 1, ..., N , j = 1, ..., M
M Y ψi,j z −1 ∂Ψi ψ(ri,l ) = · ψ ′ (ri,j ) · ∂θi,j ai
us
∂(t − y) ∂e = = −1 ∂g ∂g
(A.13)
Therefore, the Jacobian matrix with the size of Q × NP can be computed using
an
565
(A.12)
cr
l=1,l6=j
(A.11)
ip t
∂e ∂Ψi = −wi · , ∂θi,j ∂θi,j
(A.3) to (A.13) and all free parameters of the SRWNN are updated using (A.2).
M
The procedure of the LM learning algorithm for training the SRWNN is summarized as follows:
parameters vj , wi , ai , bi , θi,j and g of the forecasting engine within their
te
570
d
1. Set the iteration number to 1, i.e., (k = 1). Randomly initialize the free
Ac ce p
allowable ranges for the first iteration P1 . 2. Present all xq s and compute the corresponding SRWNN outputs yq using (5). Moreover, compute the corresponding errors eq and the performance
index MSE using (A.1).
575
3. Compute the Jacobian matrix 4. Update the free parameters of the forecasting engine using (A.2) to obtain Pk+1.
5. Compute the performance index MSE using Pk+1. If the new MSE is smaller than the one computed in step 2, reduce the parameter µ by the 33
Page 33 of 42
580
factor β, and save Pk+1 . Otherwise, increase the parameter µ by multiply-
ip t
ing it to β and go back to step 3. 6. Increment k, i.e., (k = k+1). The training algorithm is terminated when the
cr
termination criterion is satisfied. Otherwise, go back to step 3. It is noted
585
us
that the termination criterion can be the maximum number of iterations. However, the early stopping technique, discussed in section 3.2, is used as
an
the termination criterion of the training algorithm in this paper as it can monitor the prediction ability of SRWNN forecast engine for the unseen
M
samples and terminate the training process in the best point with the least
Acknowledgements
te
590
d
validation error.
Partial support for this work came from the Canadian National Science and
Ac ce p
Engineering Research Council (NSERC) and the ENMAX Corporation under the Industrial Research Chairs program. Moreover, the authors would like to thank Dr. Hassan Farhangi and Dr. Ali Palizan of British Columbia Institute of Technology
595
(BCIT) for providing data and invaluable insight.
References
[1] Navigant research, 2013. URL: www.navigantresearch.com/research/microgrids. [2] J. Taylor, P. McSharry, Short-term load forecasting methods: An evaluation
34
Page 34 of 42
based on european data, IEEE Transactions on Power Systems 22 (2007) 2213–2219.
ip t
600
[3] T. Hong, M. Gui, M. Baran, H. Willis, Modeling and forecasting hourly elec-
us
Society General Meeting, 2010 IEEE (2010) 1–8.
cr
tric load by multiple linear regression with interactions, Power and Energy
[4] E. Paparoditis, T. Sapatinas, Short-term load forecasting: The similar shape functional time-series predictor, IEEE Transactions on Power Systems 28
an
605
(2013) 3818–3825.
M
[5] H. Hippert, C. Pedreira, R. Souza, Neural networks for short-term load
610
te
16 (2001) 44–55.
d
forecasting: a review and evaluation, IEEE Transactions on Power Systems
[6] Y. Wang, Q. Xia, C. Kang, Secondary forecasting based on deviation analy-
Ac ce p
sis for short-term load forecasting, IEEE Transactions on Power Systems 26 (2011) 500–507.
[7] E. Ceperic, V. Ceperic, A. Baric, A strategy for short-term load forecasting by support vector regression machines, IEEE Transactions on Power
615
Systems 28 (2013) 4356–4364.
[8] Y. Goude, R. Nedellec, N. Kong, Local short and middle term electricity load forecasting with semi-parametric additive models, IEEE Transactions on Smart Grid 5 (2014) 440–446.
35
Page 35 of 42
[9] A. Chaouachi, R. M. Kamel, R. Andoulsi, K. Nagasaka, Multiobjective intelligent energy management for a microgrid, IEEE Transactions on In-
ip t
620
dustrial Electronics 60 (2013) 1688–1699.
cr
[10] E. Mashhour, S. Moghaddas-Tafreshi, Integration of distributed energy re-
us
sources into low voltage grid: A market-based multiperiod optimization model, Electric Power Systems Research 80 (2010) 473–480.
[11] E. R. Sanseverino, M. L. D. Silvestre, M. G. Ippolito, A. D. Paola, G. L.
an
625
Re, An execution, monitoring and replanning approach for optimal energy
M
management in microgrids, Energy 36 (2011) 3429–3436. [12] A. Mohamed, V. Salehi, O. Mohammed, Real-time energy management
tions on Smart Grid 3 (2012) 1911–1922.
te
630
d
algorithm for mitigation of pulse loads in hybrid microgrids, IEEE Transac-
Ac ce p
[13] M. Eghbal, T. K. Saha, N. Mahmoudi-Kohan, Utilizing demand response programs in day ahead generation scheduling for micro-grids with renewable sources, 2011 IEEE PES Innovative Smart Grid Technologies Asia (ISGT) (2011) 1–6.
635
[14] P. Chan, W.-C. Chen, W. Ng, D. Yeung, Multiple classifier system for short term load forecast of microgrid, Proceedings of the 2011 International Conference on Machine Learning and Cybernetics (10-13 July, 2011) 1268– 1273.
36
Page 36 of 42
[15] N. Amjady, F. Keynia, H. Zareipour, Short-term load forecast of microgrids by a new bilevel prediction strategy, IEEE Transactions on Smart Grid 1
ip t
640
(2010) 286–294.
cr
[16] M. Shahidehpour, M. Khodayar, Cutting campus energy costs with hierar-
us
chical control, IEEE Electrification Magazine 1 (2013) 40– 56.
[17] A. Ahmad, M. Hassan, M. Abdullah, H. Rahman, F. Hussin, H. Abdullah, R. Saidur, A review on applications of ANN and SVM for building elec-
an
645
trical energy consumption forecasting, Renewable and Sustainable Energy
M
Reviews 33 (2014) 102 – 109.
[18] G. Escriva-Escriva, C. Alvarez-Bel, C. Roldan-Blay, M. Alcazar-Ortega,
forecasting based on building end-uses, Energy and Buildings 43 (2011)
Ac ce p
3112 – 3119.
te
650
d
New artificial neural network prediction method for electrical consumption
[19] A. H. Neto, F. A. S. Fiorelli, Comparison between detailed model simulation and artificial neural network for forecasting building energy consumption, Energy and Buildings 40 (2008) 2169 – 2176.
655
[20] S. Farzana, M. Liu, A. Baldwin, M. U. Hossain, Multi-model prediction and simulation of residential building energy in urban areas of chongqing, south west china, Energy and Buildings 81 (2014) 161 – 169. [21] R. K. Jain, K. M. Smith, P. J. Culligan, J. E. Taylor, Forecasting energy consumption of multi-family residential buildings using support vector regres37
Page 37 of 42
660
sion: Investigating the impact of temporal and spatial monitoring granularity
ip t
on performance accuracy, Applied Energy 123 (2014) 168 – 178. [22] D. Monfet, M. Corsi, D. Choiniere, E. Arkhipova, Development of an energy
cr
prediction tool for commercial buildings using case-based reasoning, Energy
665
us
and Buildings 81 (2014) 152 – 160.
[23] G. Escriva-Escriva, C. Roldan-Blay, C. Alvarez-Bel, Electrical consumption
an
forecast using actual data of building end-use decomposition, Energy and Buildings 82 (2014) 73 – 81.
M
[24] J. G. Jetcheva, M. Majidpour, W. P. Chen, Neural network model ensembles for building-level electricity load forecasts, Energy and Buildings 84 (2014)
[25] British
d
214 – 223.
te
670
Columbia
Institute
of
Technology,
2014.
URL:
Ac ce p
http://www.bcit.ca/microgrid/.
[26] H. Zareipour, K. Bhattacharya, C. A. Canizares, Electricity market price volatility: The case of Ontario, Energy Policy 35 (2007) 4739–4748.
675
[27] N. Amjady, F. Keynia, Short-term load forecasting of power systems by combination of wavelet transform and neuro-evolutionary algorithm, Energy 34 (2009) 46 – 57. [28] Q. Zhang, A. Benveniste, Wavelet networks, IEEE Transactions on Neural Networks 3 (1992) 889–898. 38
Page 38 of 42
680
[29] N. M. Pindoriya, S. N. Singh, S. K. Singh, An adaptive wavelet neural
ip t
network-based energy price forecasting in electricity markets, IEEE Transaction on Power System 23 (2008) 1423–1432.
cr
[30] J. Vermaak, E. Botha, Recurrent neural networks for short-term load fore-
685
us
casting, IEEE Transactions on Power Systems 13 (1998) 126–132.
[31] S. J. Yoo, J. B. Park, Y. H. Choi, Adaptive dynamic surface control of
an
flexible-joint robots using self-recurrent wavelet neural networks, IEEE Transactions on Systems, Man, and Cybernetics, Part B: Cybernetics 36
M
(2006) 1342–1355.
[32] S. J. Yoo, J. B. Park, Y. H. Choi, Indirect adaptive control of nonlinear dynamic systems using self recurrent wavelet neural networks via adaptive
d
690
te
learning rates, Information Sciences 177 (2007) 3074–3098.
Ac ce p
[33] A. Tascikaraoglu, M. Uzunoglu, A review of combined approaches for prediction of short-term wind speed and power, Renewable and Sustainable Energy Reviews 34 (2014) 243 – 254.
695
[34] N. Amjady, F. Keynia, H. Zareipour, Wind power prediction by a new forecast engine composed of modified hybrid neural network and enhanced particle swarm optimization, IEEE Transactions on Sustainable Energy 2 (2011) 265–276. [35] S. S. Haykin, Neural Networks: A Comprehensive Foundation, Prentice
700
Hall, 1999. 39
Page 39 of 42
[36] H. Chitsaz, N. Amjady, H. Zareipour, Wind power forecast using wavelet
ip t
neural network trained by improved clonal selection algorithm, Energy Conversion and Management 89 (2015) 588–598.
IEEE Transactions on Power Systems 25 (2010) 1519–1530.
us
705
cr
[37] L. Wu, M. Shahidehpour, A hybrid model for day-ahead price forecasting,
[38] M. T. Hagan, M. B. Menhaj, Training feedforward networks with the Mar-
an
quardt algorithm, IEEE Transactions on Neural Networks 5 (1994) 989–993. [39] L. Hernandez, C. Baladr´on, J. Aguiar, B. Carro, A. Sanchez-Esguevillas,
ral networks, Energies 6 (2013) 1385–1408.
d
710
M
J. Lloret, Short-term load forecasting for microgrids based on artificial neu-
te
[40] A. Pandey, D. Singh, S. Sinha, Intelligent hybrid wavelet models for shortterm load forecasting, IEEE Transactions on Power Systems 25 (2010)
Ac ce p
1266–1273.
[41] B.-L. Zhang, Z.-Y. Dong, An adaptive neural-wavelet model for short term
715
load forecasting, Electric Power Systems Research 59 (2001) 121–129.
[42] N. Amjady, A. Daraeepour, Mixed price and load forecasting of electricity markets by a new iterative prediction method, Electric Power Systems Research 79 (2009) 1329–1336. [43] Kumeyaay
720
wind
farm,
2014.
URL:
http://www.thewindpower.net/windfarm_en_2792_kumeyaay.php. 40
Page 40 of 42
[44] California
Independent
System
Operator,
2014.
URL:
Ac ce p
te
d
M
an
us
cr
ip t
http://www.caiso.com/1c57/1c578a8751b30.pdf.
41
Page 41 of 42
*Highlights (for review)
Ac ce p
te
d
M
an
us
cr
Load forecasting for micro-grids is more challenging than the conventional power system load forecasting. Electricity load of a building in a micro-grid is more volatile than that of a power system. The SRWNN model can efficiently capture non-smooth behavior of building load. The superiority of SRWNN forecasting model over WNN increments as the volatility increases.
ip t