Simulation test on mixed water and sand inrush disaster induced by mining under the thin bedrock

Simulation test on mixed water and sand inrush disaster induced by mining under the thin bedrock

Accepted Manuscript Simulation test on mixed water and sand inrush disaster induced by mining under the thin bedrock Weifeng Yang, Lu Jin, Xinquan Zha...

3MB Sizes 1 Downloads 13 Views

Accepted Manuscript Simulation test on mixed water and sand inrush disaster induced by mining under the thin bedrock Weifeng Yang, Lu Jin, Xinquan Zhang PII:

S0950-4230(18)30284-5

DOI:

https://doi.org/10.1016/j.jlp.2018.11.007

Reference:

JLPP 3804

To appear in:

Journal of Loss Prevention in the Process Industries

Received Date: 27 March 2018 Revised Date:

8 October 2018

Accepted Date: 4 November 2018

Please cite this article as: Yang, W., Jin, L., Zhang, X., Simulation test on mixed water and sand inrush disaster induced by mining under the thin bedrock, Journal of Loss Prevention in the Process Industries (2018), doi: https://doi.org/10.1016/j.jlp.2018.11.007. This is a PDF file of an unedited manuscript that has been accepted for publication. As a service to our customers we are providing this early version of the manuscript. The manuscript will undergo copyediting, typesetting, and review of the resulting proof before it is published in its final form. Please note that during the production process errors may be discovered which could affect the content, and all legal disclaimers that apply to the journal pertain.

ACCEPTED MANUSCRIPT

Simulation test on mixed water and sand inrush disaster

2

induced by mining under the thin bedrock

3

Weifeng Yang *, Lu Jin, Xinquan Zhang

4

School of Resources and Geosciences, China University of Mining and Technology,

5

Xuzhou, 221116, China

6 Weifeng Yang: [email protected]

8

Lu Jin: [email protected]

9

Xinquan Zhang: [email protected]

10

M AN U

7

SC

RI PT

1

*Corresponding author

12

Weifeng Yang

13

School of Resources and Geosciences, China University of Mining and Technology,

14

Xuzhou, 221116, Jiangsu, China

15

E-mail: [email protected]

EP

AC C

16

TE D

11

17

ABSTRACT: Coal seam mining under thin bedrock will make transmission fissure

18

zone go through to the water-rich aquifer under the covering layer, which will cause

19

water flooding and sand gushing in the working face. The test model of the mixed

20

water and sand inrush transfer and inrush was designed and manufactured to simulate

21

the startup, transfer and inrush process of the mixed water and sand inrush in the

ACCEPTED MANUSCRIPT overburden fracture channel. The characteristics of the mixed water and sand inrush in

23

the fracture channels were researched. The variation characteristics of water pressure

24

in different positions of the fracture channel were revealed through analyzing “\ /”

25

type fracture form which is wide at the top and goes narrower down to the base, of

26

various inclination angles under the water pressure of 0.06 MPa and 0.08 MPa. The

27

results show that the water and sand inrush took place instantly in the mined area.

28

Based on the characteristics of water pressure variations, changes in water pressure

29

are divided into two phases: rising phase and lowering to stable phase. Under the

30

other same conditions, when the fissure channel angle increases, the pore water

31

pressure and its sudden drop will increase too, and the inrushing process will get more

32

rapidly; the bigger the water pressure is, the pore water pressure increases more

33

rapidly and violently. From this, the transfer characteristics and dynamic mechanism

34

of the mixed water and sand inrush were explored.

TE D

M AN U

SC

RI PT

22

EP

35

Key words: thin bedrocks; inrush disaster; mixed water and sand inrush; transfer

37

characteristics

38

1 Introduction

AC C

36

39

Coal seam mining under thin bedrock will make transmission fissure zone go

40

through to the water-rich aquifer under the covering layer, which will cause water

41

flooding and sand gushing in the working face. Water filled in the mined-out area

42

under thin bedrock and thick unconsolidated layer actually contain dual water sources

ACCEPTED MANUSCRIPT under natural and artificial conditions. The channels of water inrush are also

44

composed of natural channels of water inrush, such as fracture and outcrop, and

45

artificial channels of water inrush, such as water flowing fractured zone. Zhang (2005)

46

introduced the hydrogeological conditions of coal mines and potential water inrush

47

disasters from aquifers under coal seams, and then presented the water inrush

48

mechanism. Sui et al. (2007) carried out the experimental study on the critical

49

hydraulic gradient and pore water pressure variation of water and sand inrush for

50

cracks in coal mining near unconsolidated soil layers. Yang et al. (2011, 2012, and

51

2016) explored the breaking mechanism of thin bedrock and the mechanism of water

52

and sand inrush in single uniform fracture through a similar material model test and

53

water sand mixing inrush migration and gushing simulation experiment. A fuzzy

54

comprehensive estimation model is developed to judge mine water and sand inrush

55

caused by underground mining. Through numerical models for the roof fracture and

56

seepage development rule, Yao et al. (2012) analyzed the changes in fracture zone,

57

stress, water pressure and seepage vector with the advancement of working face. The

58

case studies (Dash et al., 2016) on lessons learnt from Indian inundation disasters

59

required more attention to maintaining safety by analyzing the past three disasters due

60

to water inrush in coal mines in Indian including Chasnala coal mine disaster, the

61

greatest disaster in India’s mining industry. Gao and Sui (2017) presented an

62

experimental investigation on quicksand through an orifice and obtained the velocity

63

of the sand inrush and velocity distributions. In addition, some case studies on water

AC C

EP

TE D

M AN U

SC

RI PT

43

ACCEPTED MANUSCRIPT 64

and mud inrush from tunnels have also been carried out (Zhao et al., 2013; Li et al.,

65

2017; Jiang et al., 2017; Zhang et al., 2018). The influencing factors of transfer and inrush of the mixed water and sand inrush

67

include water and sand source, inrush channel and dynamic source. The interaction of

68

these three factors is the internal mechanism leading to the transfer and inrush of the

69

mixed water and sand inrush. With the advancing of the working face, the cracks in

70

the overburden strata are formed, but due to different force forms and positions in

71

different areas, the specific fracture shapes will be different. After coal mining, the

72

supporting force of the coal suddenly disappears, and the load on the overburden

73

strata completely acts on the roof. When rock formations collapse, the rock masses

74

near the unconsolidated layers are subjected to flexural tension, and the fracture is of

75

the type “\ /” wide at the top and narrow at the bottom.

TE D

M AN U

SC

RI PT

66

In this paper, the experiments were carried out through a self-designed and

77

manufactured model of mixed water and sand inrush process. In view of the “\ /”

78

shaped fracture, wide at the top and narrow at the bottom, we simulated the start,

79

transfer and inrush process of the mixed water and sand inrush in the inrush channel

80

of overburden strata during mining. By setting up the models of different water

81

pressure and different angles of fracture channel, the geological information of the

82

transfer and inrush of mixed water and sand inrush was quantitatively studied, and the

83

curves of water pressure were obtained at different locations in the inrush channels.

84

The inrush mechanism of the mixed water and sand inrush induced by coal mining

AC C

EP

76

ACCEPTED MANUSCRIPT under unconsolidated aquifer is instructive for preventing inrush of mixed water and

86

sand inrush and making decisions in mining under the thin bedrock and thick

87

unconsolidated layers.

88

2 Design and Monitoring of Experimental Model

89

2.1 Design of test equipment

RI PT

85

The test equipment mainly consists of a water pressure device, a storage device

91

of the mixed water and sand inrush, a channel device of mixed water and sand inrush

92

transfer, a pressure sensor system, an orifice device of water and sand inrush, an

93

automatic control and recording device, a computer control device and a voltage

94

overload protection device etc.

M AN U

SC

90

The geological prototype of test model design is based on a working face of thin

96

bedrock in Jining Taiping Coal Mine of Shandong province, China. The permeability

97

coefficient of Quaternary bottom aquifer is 0.428 m/d, considering the inrush channel,

98

20 ~ 30 cm wide and 5 ~ 20 m long, will cause a groundwater level falling funnel

99

with a diameter of not less than 120 m. The test is designed according to the

100

geometric proportion of n=200 and the influence radius can reach to about 0.3 m.

101

Therefore, a test tank with a diameter of 0.6m is used as the storage tank of a

102

simulated water-bearing sand reservoir. The fracture channel setup is based on a

103

cylindrical test barrel with a diameter of 0.3 m and a length of 1.5 m. The fractured

104

rock is set inside the barrel body, that is, the channel simulation fracture, and the

105

fracture width can be adjusted freely to simulate the channel with the width of

AC C

EP

TE D

95

ACCEPTED MANUSCRIPT different fractures. At the bottom, the valve is set for the outlet of the sand inrush. In

107

the experiment, the “\ /” type fracture form which is wide at the top and goes narrowly

108

down to the base with a length of 1.5 m is made by using concrete in the simulated

109

fracture. Three water head supply pipeline interfaces are installed on the side of the

110

test tank. The test equipment is shown in Fig. 1.

111 112

AC C

EP

TE D

M AN U

SC

RI PT

106

(a)

(b)

113

1—Collection box of water and sand; 2—Quick opening valve; 3—Plugging joint; 4—Sensor cable; 5—Pore

114

water pressure sensor; 6—Fractured rock; 7—Clay filling; 8—Fracture channel; 9—Water-bearing sand layer; 10

115

—Hydraulic recharge; W① ~W③—Test point of water pressure1~3

116

Fig. 1. Experimental equipment.

ACCEPTED MANUSCRIPT 117

2.2 Design and Monitoring of Model Scheme Considering the change of pore water pressure during the inrush of mixed water

119

and sand inrush under different initial water heads and angles of fracture channel, the

120

fracture shape adopts “\ /” type with a width of 3 cm at the top and 1 cm at the bottom.

121

The inner surface of the fracture channel is smooth. The specific model scheme is

122

shown in Table 1.

123

SC

RI PT

118

Table 1 Parameters of model test. Water pressure (MPa)

Fracture angle (°)

M AN U

Model 1 2

0.06

30, 60, and 90

0.08

30, 60, and 90

The inrush channel in the test barrel can be adjusted to different angles by the

125

hydraulic cylinder provided outside the barrel to achieve the inclination angle of the

126

channel. The test first laid an inrush channel in the barrel body, and the fracture

127

channel was made from two pieces of concrete plate, and adopted “\ /” type with a

128

width of 3 cm at the top and 1 cm width at the bottom. Then the bottom valve is

129

closed, the aquifer sand layer is laid directly in the test tank, and the short tube set is

130

used in the upper part of the test tank as the water supply channel. The positions of the

131

sensors are arranged in sequence according to the axial length of the channel. There

132

are 3 water pressure sensors in total, with a spacing of 0.5m. One of the water

133

pressure sensors is set at the position of the water inrush outlet to measure the change

134

of water pressure along the axial length of the channel. After the water pressure

AC C

EP

TE D

124

ACCEPTED MANUSCRIPT 135

sensors are installed and sand layers are laid, a layer of canvas and plastic cloth is laid

136

on the top to simulate the upper aquifuge, and then the load is applied to the

137

designated load by the pressure pump at the upper end of the soil. The aquifer at the bottom of the unconsolidated layer is composed of medium

139

sand, and contains a small amount of gravel. The grain composition of the medium

140

sand used in the model test is shown in Fig. 2.

M AN U

SC

RI PT

138

TE D

141 142

Fig. 2. Grading curve of medium sand.

The pore water pressure sensors for monitoring are selected as BSY2D type,

144

produced by Xi'an Lanhua Sensor Factory of China, 32 mm in diameter, 55 mm in

145

length, ranging from 0 to 100 kPa, with an accuracy grade of 0.5. Each pore water

146

pressure sensor is calibrated before the test. The sensor signal acquisition is collected

147

by the KSD series data display instrument into the computer, its parameters are shown

148

in Table 2. The hydraulic pressurizing device is mainly composed of a high pressure

149

pump device, the flow rate is 5 L/min, the power is 5.5 kW, and the maximum output

150

pressure is 5 MPa.

151

AC C

EP

143

Table 2 Parameters of Digital Display Instrument Parameters

Indicator values

ACCEPTED MANUSCRIPT 250 kHz

Voltage

0~5V DC

Measurement resolution

1/60000

Basic error

±0.2%F⋅S

Number of channels

12

Measurement control cycle

Number of channels ×0.2s

RI PT

Maximum channel speed

3 Variation of pore water pressure in the channel of mixed water and

153

sand inrush transfer

SC

152

The water pressure change of the model 1 is continuously monitored by the

155

sensors during the transfer process of the mixed water and sand inrush is shown in Fig.

156

3.

157 158 159

AC C

EP

TE D

M AN U

154

(a) Inclination angle 30°

SC

RI PT

ACCEPTED MANUSCRIPT

160 161

162 163 164

AC C

EP

TE D

M AN U

(b) Inclination angle 60°

(c) Inclination angle 90°

Fig. 3. Water pressure change curve of model 1.

165

In Fig. 3, during the whole process of the mixed water and sand inrush, the water

166

pressure generally shows a sharp decline after rising to an extreme value, and finally

167

tends to be stable. According to the pore water pressure monitoring curves in fracture

ACCEPTED MANUSCRIPT channel, the pore water pressure in overlying confined aquifer can be monitored

169

instantly when the water flowing fractured zone leads to the bottom aquifer after coal

170

seam mining. Before the opening of the fracture channel, the pore water pressure at

171

the monitoring point P3 increased fastest, and the extreme value was also the largest.

172

P1 was the minimum. Once there is a water and sand inrush, the water pressure in the

173

entire fracture channel decreases sharply and then stabilizes at a certain level over

174

time until the end of the inrush. Among them, the stability value of P3 is the largest,

175

and P1 is the smallest, which is mainly due to the narrow fracture in the location of P3,

176

and the water pressure is more easily accumulated and increased here. During the

177

inrush process, the flow of water is blocked because it is narrow here.

M AN U

SC

RI PT

168

In addition, during the stable stage of mixed water and sand inrush transfer, the

179

signal of water pressure fluctuates strongly. Mainly because the lower part of the

180

fracture channel is narrow and sand particles selected are not of the same size and

181

containing a small amount of silt, the silty sand will easily disintegrate, so a certain

182

amount of sand bodies will accumulate near the inrush opening, and the hydraulic

183

gradient will increase. Hydraulic gradient, when reaching its critical value, will cause

184

the disintegrated and accumulated sand particles to flow, and water and sand inrush

185

will continue. Besides, at the beginning of water and sand inrush, the amount of sand

186

inrush is greater than draining sand through the outlet. Some sand accumulates at the

187

outlet of inrush, and blocks the channel of inrush, resulting in poor drainage

188

conditions. At this time, the hydraulic gradient at the place where the sand

AC C

EP

TE D

178

ACCEPTED MANUSCRIPT accumulates is smaller than the critical hydraulic gradient of sand inrush but greater

190

than the critical value of the seepage, that is, no more inrush of sand, but seepage

191

failure occurs. It is because the seepage and the suffosion have taken away the sand at

192

the outlet of inrush, and drainage has begun to open. When the hydraulic gradient

193

reaches the critical hydraulic gradient of sand inrush, sand inrush will occur again,

194

followed by seepage destruction. It is just like this that the cyclical process of “sand

195

inrush — seepage — sand inrush again” occurs continuously. As a result, when the

196

fracture channel is opened, the water head pressure drops rapidly, and it will a long

197

time before the process of sand inrush stops, which corresponds to the violent

198

fluctuation of the water pressure signal in the stable phase during water and sand

199

inrush. This will lead to large-scale inrush damage of mixed water and sand flow

200

during mining.

TE D

M AN U

SC

RI PT

189

In mixed water and sand inrush process, each measuring point is different from

202

the position of the outlet of inrush. The water level near the inrush outlet is high,

203

while that far from the inrush outlet is low. The water pressure shows a certain

204

hydraulic gradient property. It is this kind of hydraulic gradient that causes the flow of

205

mixed water and sand to burst out along the fractured channel. The value of the water

206

pressure along the channel gradually increases, mainly because the increase of the

207

water pressure gradient in the aquifer overcomes part of the flow resistance loss.

208

Taking 90° as an example, point P1 is near the bottom aquifer, and the maximum

209

value of monitored water pressure is 61 kPa. Point P2 is located in the middle of the

AC C

EP

201

ACCEPTED MANUSCRIPT fracture channel, and the maximum value of the monitored water pressure is 64 kPa.

211

Point P3 is close to the outlet of water inrush, and the maximum value of the

212

monitored water pressure is 67 kPa. Taking into account that the initial water head is

213

60 kPa, the monitored water pressure basically conforms to the maximum value of the

214

water pressure at each measuring point and satisfies Darcy’s law.

RI PT

210

Model 1 compared the different angles of fracture channel, and took monitoring

216

points P1 and P3 as examples. The water pressure changes during the inrush of water

217

and sand are shown in Fig. 4-5.

219

AC C

218

EP

TE D

M AN U

SC

215

Fig. 4. Water pressure curve at different angles of model 1 (monitoring point P1).

SC

RI PT

ACCEPTED MANUSCRIPT

221

M AN U

220

Fig. 5. Water pressure curve at different angles of model 1 (monitoring point P3).

Point P1 is located at the top of the fracture channel, near the overlying loose

223

aquifer, and the monitored water pressure is closer to the change in water pressure in

224

the aquifer. As shown in Fig. 4, at 30°, the maximum of water pressure at the

225

measuring point P1 is 58 kPa, and then it is reduced to 39 kPa after the fracture

226

channel opens with a reduction of 19 kPa; in the case of 60°, the maximum value is

227

60 kPa, and then it drops to 38 kPa after the fracture channel is opened with a

228

decrease of 22 kPa; in the case of 90 °, there is a sharp drop from the maximum 63

229

kPa to 40 kPa with the largest decline of 23 kPa. This shows that in the same initial

230

head of the bottom aquifer, with the increase of the angle of the fracture channel, the

231

water pressure increases in the upper part of the fracture channel increases. The

232

maximum value of the water pressure also increases, and when the fracture channel is

233

opened, the sudden drop in the water pressure also increases.

234

AC C

EP

TE D

222

Point P3 is located at the end of the fracture channel near the outlet of water

ACCEPTED MANUSCRIPT inrush. Once the fracture channel is opened, P3 first detects the sudden drop in water

236

pressure. In Fig. 3, at different angles, the sudden drop in water pressure at point P3 is

237

the fastest, followed by that at P2, and that at P1 is the slowest, but the delay time is

238

shorter than 5 s. As shown in Fig. 5, with the increase of the angle of the fracture

239

channel, the increase in water pressure at the bottom of the fracture channel and near

240

the outlet of water inrush is greater than that in other locations, and the maximum of

241

water pressure is also increased. When the fracture channel is opened, the magnitude

242

of the sudden drop in water pressure also increases.

M AN U

SC

RI PT

235

In Fig. 3, the curve of the water pressure generally includes two stages: the rising

244

stage and dropping sharply to stable stage, changing the test pressure and increasing

245

the water pressure from 0.06 MPa to 0.08 MPa. The test angles are 30°, 60°, and 90°,

246

respectively. Other conditions are unchanged. The test results are shown in Fig. 6.

TE D

243

Comparing Fig. 3 and Fig. 6, it can be seen that when the angle of the fracture

248

channel is the same, the water pressure in each measuring point increases

249

correspondingly with the increase of the initial water head pressure and shows a

250

certain linear property. The 0.08 MPa increase of the water pressure at each measuring

251

point is also greater than the water pressure the 0.06 MPa increase in the curves.

252

When the fracture channel is opened, the magnitude of 0.08 MPa sudden drop in

253

water pressure at each measuring point is also greater than that of the water pressure,

254

which is 0.06 MPa. During the test, when the fracture channel is opened, more water

255

and sand mixture gush in the model 2, but taking less time. It can be seen that the

AC C

EP

247

ACCEPTED MANUSCRIPT greater the water pressure in the aquifer, the faster the increase of the water pressure

257

in the rising stage of the fracture channel, the sharper the drop in the water pressure

258

during inrush, the more violent the mixed water and sand inrush. Therefore, mine

259

drainage and water head pressure reduction of the aquifer can slow down the transfer

260

and inrush of the mixed water and sand inrush.

(a) Water pressure curve of model 2 (inclination angle 30°)

EP

262

AC C

261

TE D

M AN U

SC

RI PT

256

SC

RI PT

ACCEPTED MANUSCRIPT

(b) Water pressure curves at rising stage of model 2 (inclination angle 60°)

265 266 267

AC C

EP

TE D

264

M AN U

263

(c) Water pressure curves at inrush stage model 2 (inclination angle 90°) Fig. 6. Water pressure change curve of model 2.

268

At the same time, the relationship between sand inrush rate and time at the

269

overflow outlet of the channel obtained from the test observation shows that the sand

270

content of the gushing material decreases with time. At the beginning, there is a large

ACCEPTED MANUSCRIPT amount of sand in the gushing material, and the state with large sand content has a

272

short duration. With the passage of test time and continuous completion of the

273

seepage deformation and failure, the sand content of the gushing material gradually

274

decreases. Finally, after the collapse doline is formed, the sand content in the gushing

275

material gradually declines to zero, and the gushing process of mixed water and sand

276

inrush is completed.

277

4 Conclusions

SC

RI PT

271

The test model of the mixed water and sand inrush transfer is designed and

279

manufactured to simulate the transfer and inrush process of the mixed water and sand

280

inrush in the “\ /” type fracture channel which is wide at the top and goes narrower

281

down to the base. The variation characteristics of water pressure in different positions

282

of the fracture channel were revealed based on the variations of inclination angle of

283

the fracture channel under the water pressure of 0.06MPa and 0.08MPa. The

284

characteristics of the mixed water and sand inrush in the fracture channels were

285

researched.

TE D

EP

AC C

286

M AN U

278

(1) During the whole process of the mixed water and sand inrush, the water

287

pressure generally shows a sharp decline after rising to an extreme value, and finally

288

tends to be stable. The curve of the water pressure generally includes two stages: the

289

rising stage and dropping sharply to stable stage.

290

(2) Under the condition of initial water head pressure of 0.06 MPa, the water

291

pressure increases with the increase of the angle of the fracture channel, the amplitude

ACCEPTED MANUSCRIPT 292

of the sudden drop increases after it is opened, when the sudden inrush process is

293

rapid, and the amount of water and sand mixture is large. (3) In the case of the same angle of the fractured channel, when the initial water

295

pressure increases to 0.08 MPa, the water pressure increases rapidly, and the inrush

296

process becomes more violent. Therefore, mine drainage and water head pressure

297

decline of the aquifer can be used as a feasible method for alleviating sudden inrush

298

of mixed water and sand flow.

SC

RI PT

294

(4) In the inrush process of mixed water and sands flow, the water pressure

300

shows a certain hydraulic gradient property. It is this kind of hydraulic gradient that

301

causes the flow of mixed water and sand to burst out along the fractured channel. The

302

value of the water pressure along the channel gradually increases, mainly because the

303

increase of the water pressure gradient in the aquifer overcomes part of the flow

304

resistance loss.

307

Acknowledgments

AC C

306

EP

305

TE D

M AN U

299

Financial support for this work is provided by the National Key R&D Program

308

of China (2017YFC0804101), the Fundamental Research Funds for the Central

309

Universities (2017ZDPY11), the National Natural Science Foundation of China

310

(40802076), the Science and Technology Planning Project of Jiangxi Provincial

311

Education Department (GJJ150601) and the Doctoral Science Foundation of ECUT

312

(DHBK2015101), all of which are gratefully acknowledged. We also would like to

ACCEPTED MANUSCRIPT 313

express our acknowledgments to editors and the anonymous reviewers who had gave

314

us useful comments to help improved the earlier version of the manuscript.

315 References

RI PT

316 317

320 321

SC

319

Dash A.K., Bhattacharjee R.M., Paul P.S., 2016. Lessons learnt from Indian inundation disasters: An analysis of case studies. Int. J. Disast. Risk Re. 20, 93-102.

Gao B.L., Sui W.H., 2017. Experimental modeling of quicksand with transparent soil through an

M AN U

318

orifice. Geotech. Test. J. 40 (5), 798-809.

Jiang H.M., Li L., Rong X.L., Wang M.Y., 2017. Model test to investigate waterproof-resistant

323

slab minimum safety thickness for water inrush geohazards. Tunn. Undergr. Sp. Technol. 62,

324

35-42.

TE D

322

Li X.Z., Zhang P.X., He Z.C., Huang Z., 2017. Identification of geological structure which

326

induced heavy water and mud inrush in tunnel excavation: A case study on Lingjiao tunnel.

327

Tunn. Undergr. Sp. Technol. 69, 203-208.

AC C

EP

325

328

Sui, W.H., Cai G.T., Dong Q.H., 2007. Experimental research on critical percolation gradient of

329

quicksand across overburden fissures due to coal mining near unconsolidated soil layers.

330

Chin. J. Rock Mech. Eng. 26 (10), 2084-2091. (In Chinese)

331

Yang W.F., Ji Y.B., Zhao G.R., Shen D.Y., 2012. Experimental study on migration characteristics

332

of mixed water and sand flows induced by mining under thin bedrock and thick

333

unconsolidated formations. Chin. J. Geotech. Eng. 34 (4), 686-692. (In Chinese)

ACCEPTED MANUSCRIPT 334

Yang W.F., Xia X.H., Pan B.L., Gu C.S., Yue J.G., 2016. The fuzzy comprehensive evaluation of

335

water and sand inrush risk during underground mining. J. Intell. Fuzzy Syst. 30 (4),

336

2289-2295. Yang W.F., Xia X.H., Zhao G.R., Ji Y.B., Shen D.Y., 2011. Overburden failure and the prevention

338

of water and sand inrush during coal mining under thin bedrock. Min. Sci. Techno. 21 (5),

339

733-736.

SC

341

Yao B.H., Bai H.B., Zhang B.Y., 2012. Numerical simulation on the risk of roof water inrush in Wuyang Coal Mine. Int. J. Min. Sci. .Techno. 22 (2), 273-277.

M AN U

340

RI PT

337

342

Zhang G.H., Jiao Y.Y., Ma C.X., Wang H., 2018. Alteration characteristics of granite contact zone

343

and treatment measures for inrush hazards during tunnel construction – A case study. Eng.

344

Geol. 235, 64-80.

348 349

TE D

347

Mech. Min. 42 (3), 350-360.

Zhao Y., Li P.F., Tian S.M., 2013. Prevention and treatment technologies of railway tunnel water

EP

346

Zhang J.C., 2005. Investigations of water inrushes from aquifers under coal seams. Int. J. Rock

inrush and mud gushing in China. J. Rock Mech. Geotech. Eng. 5 (6), 468-477.

AC C

345

ACCEPTED MANUSCRIPT Topic: Simulation test on mixed water and sand inrush disaster induced by mining under the thin bedrock

RI PT

Highlights

(1) The test model of the mixed water and sand inrush process was designed and

SC

manufactured.

(2) The mixed water and sand inrush process in the “\ /” type fracture channel

M AN U

was simulated.

(3) The variation characteristics of water pressure in different position of the fracture channel were revealed through analyzing “\ /” type fracture form of various

TE D

inclination angles of the channel under the water pressure of 0.06 MPa and 0.08 MPa.

AC C

EP

(4) The measures to prevent water and sand inrush disasters were proposed.