Vertical pumps perform offshore oil skimming duties

Vertical pumps perform offshore oil skimming duties

H YDROCARBON PROCESSING these p u m p s a n d reduce our body e s t i m a t e s a p a y b a c k of two energy costs," says Run Cross, years for t h e...

91KB Sizes 2 Downloads 91 Views

H YDROCARBON PROCESSING

these p u m p s a n d reduce our body e s t i m a t e s a p a y b a c k of two energy costs," says Run Cross, years for t h e retrofit. However, if e n v i r o n m e n t a l m a n a g e r at Pea- users replace the p a r t s w h e n body Holding. "In fact, we p l a n fully worn, such retrofits would to d i s t r i b u t e these findings to provide i m m e d i a t e payback as o t h e r Peabody p l a n t s with simi- they would be p u r c h a s i n g wetend p a r t s anyway. lar applications." According to GIW engineers, Given the p r e m a t u r e replacem e n t of the w e t - e n d parts, Pea- h u n d r e d s of similar GIW p u m p s ,

[]

o p e r a t i n g in coal fields througho u t the Midwest a n d elsewhere, could b e n e f i t from a s i m i l a r retrofit. Contact: GIW Industries Inc, 5000 Wrightsboro Road, Grovetown, GA 30813-9750 USA. Tel: + 1 706 863 1011; Fax: + 1 706 880 5897.

Vertical p u m p s p e r f o r m o f f s h o r e oil s k i m m i n g d u t i e s

Shell U.K. E x p l o r a t i o n a n d Prod u c t i o n , o p e r a t o r in t h e UK sector of the North Sea for Shell a n d Esso, is u s i n g P Range Vertical progressing cavity p u m p s , from Mono P u m p s Ltd, on its Brent Charlie p l a t f o r m i n the North Sea to perform oil s k i m m i n g duties. The B r e n t Charlie p l a t f o r m is one of four p r o d u c t i o n platforms serving the Brent Field which is the largest in the UK

sector of t h e North Sea. Installed vertically w i t h i n one of the p l a t f o r m ' s legs, the p u m p s are required to remove oil from the c o l u m n a n d p u m p it via the reclaimed oil line a n d crude manifold into storage cells for f u r t h e r processing. Shell Expro required a reliable intrinsically-safe p u m p i n g system t h a t could be easily installed, serviced a n d maintained.

~;i!::,,, ¸

,

\

:t i! i

t

'

i!lt.: i '

II

Shell's Brent Charlie platform in the North Sea is using P Range vertical progressing cavity pumps from M o n o for oil skimming duties.

WORLD PUMPS DECEMBER 1997

The p u m p s are required to p u m p a m i x t u r e of oil, sea water, H20 and particles, at a pressure of 9 bar. Robust and weatherproof, the p u m p s are designed to w i t h s t a n d even the most arduous North Sea conditions, including waves, sea spray a n d temperatures ranging from -7°C to 40°C. The pumps incorporate Mono's Flexishaft system, which provides a single c o m p o n e n t link between the rotary m o t i o n of t h e d r i v e s h a f t a n d t h e eccentric m o t i o n of the helical rotor. The reduced n u m b e r of moving p a r t s in the drive t r a i n e l i m i n a t e s wear a n d m a k e s lubrication unnecessary, removing the risk of failure d u r i n g n o r m a l operation. To e n s u r e c o m p l e t e sparkfree o p e r a t i o n , Mono s u p p l i e d t h e p u m p s with a special rubb e r l i n i n g so t h a t in the event of m e c h a n i c a l failure, t h e r e w o u l d n e v e r be any m e t a l to m e t a l contact. For a completely automatic fail-proof system, t h e p u m p s have b e e n i n t e g r a t e d with level d e t e c t i o n equipment for start/stop control, a flow m e t e r to i m m e diately detect n o flow situations, and a high pressure switch to p r o t e c t a g a i n s t over pressure. To m a t c h all offshore applications, the vertical P range is designed to h a n d l e flow rates u p to 140 m3/h a n d pressures u p to 18 bar; a n d is available as a single, two a n d four stage model in either carbon, stainless, d u p l e x a n d s u p e r d u p l e x steel. Contact: Mono Pumps, Martin Street, Audenshaw, Manchester M34 5DQ, UK. Tel:+44 161 339 9009; Fax: + 44 161 344 0727.